- Non-food contact surfaces: Approved, designed, constructed, maintained, installed, located (1 penalty point)
- Non-food contact surfaces of equipment and utensils clean (1 penalty point)
- Plumbing: Installed, maintained (1 penalty point)
- Walls, ceilings, attached equipment: constructed, good repair, clean surfaces, dustless cleaning methods (1 penalty point)
|
8/28/2012 | 96 |
- Non-food contact surfaces: Approved, designed, constructed, maintained, installed, located (1 penalty point)
- Food contact surfaces of equipment and utensils clean (2 penalty points)
- Floors: constructed, drained, clean, good repair, covering installation, dustless cleaning methods (1 penalty point)
- Walls, ceilings, attached equipment: constructed, good repair, clean surfaces, dustless cleaning methods (1 penalty point)
- Lighting provided as required - Fixtures shielded (1 penalty point)
|
3/26/2012 | 94 |
- Food contact surfaces of equipment and utensils clean (2 penalty points)
- Non-food contact surfaces of equipment and utensils clean (1 penalty point)
- Walls, ceilings, attached equipment: constructed, good repair, clean surfaces, dustless cleaning methods (1 penalty point)
- Lighting provided as required - Fixtures shielded (1 penalty point)
- Non-food contact surfaces: Approved, designed, constructed, maintained, installed, located (1 penalty point)
|
9/26/2011 | 94 |
- Original Container, Appropriate Labels, Date, Time, Advisory Posted, Shellfish Tags (1 penalty point)
- Food protection during storage, preparation, display, service and transportation (2 penalty points)
- Non-food contact surfaces: Approved, designed, constructed, maintained, installed, located (1 penalty point)
- Wiping cloths: clean, use restricted (1 penalty point)
- Food contact surfaces of equipment and utensils clean (2 penalty points)
- Critical: Presence of insects/rodents - outer openings protected, no birds, turtles, other animals (4 penalty points)
- Floors: constructed, drained, clean, good repair, covering installation, dustless cleaning methods (1 penalty point)
- Walls, ceilings, attached equipment: constructed, good repair, clean surfaces, dustless cleaning methods (1 penalty point)
- Lighting provided as required - Fixtures shielded (1 penalty point)
|
2/22/2011 | 86 |
Restaurant representatives - add corrected or new information about Mike & Denise's Pizzeria & Pub, 1760 N Farnsworth, Aurora, IL »