Project Org. & Design Studio, 1401-1409 E 79th St, Chicago, IL 60619 - Restaurant inspection findings and violations



Business Info

Restaurant: Project Org. & Design Studio
Address: 1401-1409 E 79th St, Chicago, IL 60619
Type: Daycare Combo 1586
Total inspections: 3
Last inspection: Aug 30, 2012
Score
(the higher the better)

100

Restaurant representatives - add corrected or new information about Project Org. & Design Studio, 1401-1409 E 79th St, Chicago, IL 60619 »


Inspection findings

Inspection Date

Inspection Score
(the higher the better)

  • * CERTIFIED FOOD MANAGER ON SITE WHEN POTENTIALLY HAZARDOUS FOODS ARE PREPARED AND SERVED
  • ADEQUATE NUMBER, CONVENIENT, ACCESSIBLE, DESIGNED, AND MAINTAINED
  • DISH WASHING FACILITIES: PROPERLY DESIGNED, CONSTRUCTED, MAINTAINED, INSTALLED, LOCATED AND OPERATED
  • FACILITIES TO MAINTAIN PROPER TEMPERATURE
  • FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVERING INSTALLED, DUST-LESS CLEANING METHODS USED
  • LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
  • NO EVIDENCE OF RODENT OR INSECT OUTER OPENINGS PROTECTED/RODENT PROOFED, A WRITTEN LOG SHALL BE MAINTAINED AVAILABLE TO THE INSPECTORS
  • PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
  • TOILET ROOM DOORS SELF CLOSING: DRESSING ROOMS WITH LOCKERS PROVIDED: COMPLETE SEPARATION FROM LIVING/SLEEPING QUARTERS
  • VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
  • WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
May 24, 2011 0
  • * CERTIFIED FOOD MANAGER ON SITE WHEN POTENTIALLY HAZARDOUS FOODS ARE PREPARED AND SERVED
  • ADEQUATE NUMBER, CONVENIENT, ACCESSIBLE, DESIGNED, AND MAINTAINED
  • DISH WASHING FACILITIES: PROPERLY DESIGNED, CONSTRUCTED, MAINTAINED, INSTALLED, LOCATED AND OPERATED
  • FACILITIES TO MAINTAIN PROPER TEMPERATURE
  • FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVERING INSTALLED, DUST-LESS CLEANING METHODS USED
  • LIGHTING: REQUIRED MINIMUM FOOT-CANDLES OF LIGHT PROVIDED, FIXTURES SHIELDED
  • NO EVIDENCE OF RODENT OR INSECT OUTER OPENINGS PROTECTED/RODENT PROOFED, A WRITTEN LOG SHALL BE MAINTAINED AVAILABLE TO THE INSPECTORS
  • PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
  • TOILET ROOM DOORS SELF CLOSING: DRESSING ROOMS WITH LOCKERS PROVIDED: COMPLETE SEPARATION FROM LIVING/SLEEPING QUARTERS
  • VENTILATION: ROOMS AND EQUIPMENT VENTED AS REQUIRED: PLUMBING: INSTALLED AND MAINTAINED
  • WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
Aug 30, 2011 100
  • FLOORS: CONSTRUCTED PER CODE, CLEANED, GOOD REPAIR, COVERING INSTALLED, DUST-LESS CLEANING METHODS USED
  • PREMISES MAINTAINED FREE OF LITTER, UNNECESSARY ARTICLES, CLEANING EQUIPMENT PROPERLY STORED
  • WALLS, CEILINGS, ATTACHED EQUIPMENT CONSTRUCTED PER CODE: GOOD REPAIR, SURFACES CLEAN AND DUST-LESS CLEANING METHODS
Aug 30, 2012 100

Violation descriptions and comments

May 24, 2011

MUST OBTAIN A LICENSED PEST CONTROL SERVICE AND PROVIDE A COMPLETE PEST CONTROL LOG BOOK ON SITE CONTAINING ALL REQUIRED DOCUMENTATION. MUST PROPERLY RODENT PROOF DOUBLE DOORS LEADING FROM CLASSROOM TO PLAY GROUND AND SIDE ENTRANCE DOOR. MUST RAISE THRESHOLD OR INSTALL PROTECTIVE STRIPS ALONG BOTTOMS OF DOORS AND MAKE COMPLETELY INSECT AND RODENT PROOF.
MUST PROVIDE A CITY OF CHICAGO FOODSERVICE MANAGERS CERTIFICATE OR VALID PROOF OF ENROLLMENT.
MUST PROVIDE MECHANICAL VENTILATION OR A WINDOW OPEN TO THE AIR IN BOTH STUDENT WASHROOMS. MUST INSTALL A BACK FLOW DEVICE AT MOP SINK.
MUST INSTALL A SELF CLOSING DEVICE ON STAFF WASHROOM DOOR.
REPLACE BURNED OUT LIGHT BULBS IN REAR CLASSROOM. MUST PROVIDE A LIGHT SHIELD OVER LIGHTS WHERE MISSING IN REAR CLASSROOM.
MUST REPLACE ALL STAINED CEILING TILES THROUGHOUT CLASSROOMS, REAR WASHROOMS AND THROUGHOUT WHERE NEEDED. MUST SEAL ALL OPENINGS ALONG WALL BASES IN ELECTRICAL ROOM. MUST INSTALL BASEBOARD ALONG ALL WALLS IN REAR MOP SINK ROOM. MUST SEAL ALL HOLES AND OPENINGS IN WALLS IN ELECTRICAL ROOM AND IN MOP SINK ROOM UNDER MOP SINK AND BEHIND HOT WATER HEATER.
MUST DETAIL CLEAN FLOORS IN ELECTRICAL CLOSET AND MOP SINK ROOM. MUST REPAIR TORN CARPET IN CLASSROOMS WHERE NEEDED AND REMOVE TAPE.
MUST INSTALL AN EXPOSED HAND BOWL IN THE FOOD PREP AREA WITH HOT AND COLD RUNNING WATER.
MUST INSTALL A 3 COMPARTMENT SINK WITH AN ATTACHED METAL DRAIN BOARD AND A GREASE TRAP OR A COMMERCIAL DISH MACHINE CAPABLE OF PROPERLY SANITIZING MULTI USE ITEMS.
MUST REMOVE ALL CLUTTER FROM CORNER IN REAR CLASSROOM AND FROM MOP SINK ROOM. MUST DISCARD UNNECESSARY ITEMS AND BETTER ORGANIZE REMAINING ITEMS. MUST STORE ALL ITEMS 6 INCHES OFF THE FLOOR.
MUST PROVIDE HOT HOLDING EQUIPMENT ON SITE TO HOLD CATERED FOOD ITEMS AT APPROPRIATE TEMPERATURES UNTIL SERVED. MUST HAVE EQUIPMENT ON AND OPERATING TO VERIFY THAT IT MAINTAINS PROPER TEMPERATURES.

Aug 30, 2011

PREVIOUS VIOLATION # 02 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 11 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 18 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 21 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 24 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 34 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 35 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 36 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 37 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 38 HAS BEEN CORRECTED AT THIS TIME.
PREVIOUS VIOLATION # 41 HAS BEEN CORRECTED AT THIS TIME.

Aug 30, 2012

DETAIL CLEAN FLOORS ALONG WALL BASES, IN CORNERS, UNDERNEATH AND BEHIND ALL HEAVY EQUIPMENT WHERE NEEDED.
ELIMINATE CLUTTER IN STORAGE AREA(S).
REPLACE ALL STAINED CEILING TILES THROUGHOUT. CLEAN STAINED LIGHT SHIELDS.

Do you have any questions you'd like to ask about Project Org. & Design Studio? Post them here so others can see them and respond.

×
Project Org. & Design Studio respresentatives - respond and add information

Write your review!

Your Ratings

You can rate this restaurant in different categories from 1 star (worst) to 5 stars (best) or leave category unrated

Food:
Service:
Price:
Ambience:
Cleanliness:

Your Review


Would you recommend Project Org. & Design Studio to others? (optional)
  
Add photo of Project Org. & Design Studio (optional)
Add more info about the restaurant »

About You

Your nickname:

Optional Verification

(additional info to increase the weight and the placement of your review and ratings)

Real Name:
Email (won't be published):
Date and time of your visit to this restaurant:
Phone number (won't be published):
Leave your signature»

Recently added reviews

Name City Users' Rating
J J Fish & ChickenChicago, IL
*****
Harolds ChickenChicago, IL
***
Adam's RibsChicago, IL
****
Kostner Food BasketChicago, IL
Pete The Greek RestaurantChicago, IL
*****
Baba's Famous Steak & LemonadeChicago, IL
*****
McdonaldsChicago, IL
***
Ming's Chop SueyChicago, IL
***
Deborah's Place IiChicago, IL
*****
Moses Butcher ShopChicago, IL
*

Restaurants in neighborhood

Name

Address

Distance

Pierres Catering 1433 E 79th St, Chicago 0.06 miles
Edu-care Day Care Center 1324 E 79th St, Chicago 0.07 miles
Goodies Supermarket 1315 E 79th St, Chicago 0.09 miles
Charlie Grocery and Meat Market 1315 E 79th St, Chicago 0.09 miles
Day & Night Dollar & Food Inc. 7901 S Avalon Ave, Chicago 0.18 miles
Aldi #79 7800 S South Chicago Ave, Chicago 0.18 miles
White Castle #27 1550 E 79th St, Chicago 0.21 miles
Avalon Park 8045 S Kenwood, Chicago 0.22 miles
Taco Bell #5751 7856 S Stony Island Ave, Chicago 0.23 miles
Avalon Community Church/Freedom Home Academy 8100 S Dante Ave, Chicago 0.26 miles

Create your own business profile on city-data.com. It's completely free!
Business Search - 14 Million verified businesses
Search for:  near: