Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Woodside, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 52ft / 15.8mTotal length
  • $1,412,000Total costs
  • 147,830Total average daily traffic
  • 12,955Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Woodside
  • No street view available for this location

New bridges in Woodside, PA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 71960-1969
  • 31970-1979
  • 12000-2009
Average Bridge Daily Traffic in Woodside, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 75.0%Satisfactory
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Satisfactory
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Fair
  • 66.7%Poor
Find on map >>   Show street view

Structure Number: 7305,  Location: 2MI.S.YARDLEY BOR. 38A03 (Lat: 40.214778,  Lng: -74.858283),  Route carried "on" structure: State highway ,  Year Built: 1926,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 7,091 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,413 (year 2032),  Design Load: H 15,  Features Intersected: BROCK CREEK,  Facility Carried by Structure: STONY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.117,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $332,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7306,  Location: LOWER MAKEFIELD TP.37H01 (Lat: 40.224992,  Lng: -74.881292),  Route carried "on" structure: State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 6,719 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,915 (year 2032),  Design Load: HS 20,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: STONEY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.874,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.2m (122.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $615,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7323,  Location: 1MI.S.TAYLORSVILLE 32J10 (Lat: 40.249639,  Lng: -74.872114),  Route carried "on" structure: State highway ,  Year Built: 1967,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,256 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,229 (year 2032),  Design Load: HS 20,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: DOLINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.229,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $444,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7647,  Location: .75 Mi N. PA-532 3038-G5 (Lat: 40.282200,  Lng: -74.897797),  Route carried "on" structure: City street ,  Year Built: 1940,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 100 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2037),  Design Load: HS 20,  Features Intersected: HOUGHS CREEK,  Facility Carried by Structure: OLD DOLINGTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2019,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $21,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4124,  Location: NE OF NEWTOWN 32E09 (Lat: 40.256808,  Lng: -74.896892),  Route carried "on" structure: State highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,095 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,837 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: CORE CREEK / 3038-G9,  Facility Carried by Structure: LINDENHURST ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.382,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2019
Find on map >>   Show street view

Structure Number: 6878,  Location: .8MI.N.RTE 332 32H11 (Lat: 40.245281,  Lng: -74.878678),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 9,739 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: QUARRY ROAD (T359)
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 6878,  Location: .8MI.N.RTE 332 32H11 (Lat: 40.245281,  Lng: -74.878678),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,717 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: QUARRY ROAD (T359)
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 7008,  Location: 1MI.W.YARDLEY RD. 32H13 (Lat: 40.234214,  Lng: -74.882050),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,717 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: NEWTOWN YARDLEY RD
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 12.875,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 7008,  Location: 1MI.W.YARDLEY RD. 32H13 (Lat: 40.234214,  Lng: -74.882050),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 9,739 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: NEWTOWN YARDLEY RD
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 12.875,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 7306,  Location: LOWER MAKEFIELD TP.37H01 (Lat: 40.224992,  Lng: -74.881292),  Route carried "under" structure: Interstate 295,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 29,853 (year 2022),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: STONEY HILL ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 7306,  Location: LOWER MAKEFIELD TP.37H01 (Lat: 40.224992,  Lng: -74.881292),  Route carried "under" structure: Interstate 295,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 32,348 (year 2022),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: STONEY HILL ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 12.070,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 7323,  Location: 1MI.S.TAYLORSVILLE 32J10 (Lat: 40.249639,  Lng: -74.872114),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 9,739 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: DOLINGTON ROAD
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 15.289,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 7323,  Location: 1MI.S.TAYLORSVILLE 32J10 (Lat: 40.249639,  Lng: -74.872114),  Route carried "under" structure: Interstate 295,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,717 (year 2020),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 295,  Facility Carried by Structure: DOLINGTON ROAD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 15.289,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Woodside, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.