Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wolf Summit, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 148ft / 45.0mTotal length
  • $5,068,000Total costs
  • 32,460Total average daily traffic
  • 2,260Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wolf Summit
  • No street view available for this location

New bridges in Wolf Summit, WV - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11910-1919
  • 51920-1929
  • 21960-1969
  • 11970-1979
  • 51980-1989
  • 31990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Wolf Summit, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 20.0%Satisfactory
  • 30.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 47.6%Good
  • 4.8%Satisfactory
  • 19.0%Fair
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 65.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.8%Excellent
  • 28.6%Very good
  • 33.3%Good
  • 19.0%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 17A014,  Location: 0.33 MI NORTH US RT 50 (Lat: 39.292611,  Lng: -80.486469),  Route carried "on" structure: County highway 500,  Year Built: 1922,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 725 (year 2038),  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $557,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A015,  Location: 0.44 MI NORTH US RT 50 (Lat: 39.293739,  Lng: -80.487469),  Route carried "on" structure: County highway 500,  Year Built: 1922,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 725 (year 2038),  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $307,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $657,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A017,  Location: 0.01 MI NORTH CO RT 7/2 (Lat: 39.322250,  Lng: -80.466200),  Route carried "on" structure: County highway 500,  Year Built: 1920,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 200 (year 2038),  Features Intersected: GRASS RUN,  Facility Carried by Structure: HARRISON CO RT 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.552,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $392,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A018,  Location: 0.03 MI SOUTH CO RT 22 (Lat: 39.340450,  Lng: -80.445239),  Route carried "on" structure: County highway 500,  Year Built: 1988,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 205 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: ROCK CAMP RUN,  Facility Carried by Structure: HARRISON CO RT 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.077,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.9m (52.2ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A025,  Location: 0.30 MI WEST CO RT 5 (Lat: 39.316239,  Lng: -80.486900),  Route carried "on" structure: County highway 507,  Year Built: 1924,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 200 (year 2038),  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 5/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.9m (101.4ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: July 2018,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $294,000,  Total Project Cost: $763,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A031,  Location: 0.11 MI WEST HARR CO 5 (Lat: 39.300881,  Lng: -80.485650),  Route carried "on" structure: County highway 509,  Year Built: 1996,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 5/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.508,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A032,  Location: 0.01 MI WEST CO RT 5 (Lat: 39.305419,  Lng: -80.480381),  Route carried "on" structure: County highway 529,  Year Built: 1891,  Year Reconstructed: 2002,  Status: Posted for load,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 13 (year 2041),  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CR 5/29
Minimum Vertical Clearance: 3.05m (10.01ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.8m (58.4ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 17A044,  Location: 0.02 MI EAST HARR CO RT 5 (Lat: 39.321681,  Lng: -80.465389),  Route carried "on" structure: County highway 702,  Year Built: 1989,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 7/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A045,  Location: 0.04 MI EAST CO RT 7/6 (Lat: 39.321661,  Lng: -80.464981),  Route carried "on" structure: County highway 702,  Year Built: 1918,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2038),  Features Intersected: NEW CREEK,  Facility Carried by Structure: HARRISON CO 7/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Superstructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $523,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 17A12,  Location: 0.01 MI EAST CO RT 5 (Lat: 39.340600,  Lng: -80.444831),  Route carried "on" structure: County highway 2200,  Year Built: 1986,  Status: Open,  Structure Length: 3.09m (10.14ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 725 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A128,  Location: 0.06 MI WEST CO RT 22/1 (Lat: 39.338950,  Lng: -80.430450),  Route carried "on" structure: County highway 2200,  Year Built: 1986,  Status: Open,  Structure Length: 3.24m (10.63ft),  Average Daily Traffic: 550 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 725 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.124,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A163,  Location: 0.08 MI SOUTH CO RT 31/4 (Lat: 39.229389,  Lng: -80.488011),  Route carried "on" structure: County highway 3100,  Year Built: 1990,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 600 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 775 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.860,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A164,  Location: 0.05 MI NORTH CO RT 33/1 (Lat: 39.262969,  Lng: -80.485889),  Route carried "on" structure: County highway 3100,  Year Built: 1976,  Status: Open,  Structure Length: 2.84m (9.32ft),  Average Daily Traffic: 850 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,125 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.543,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A165,  Location: 0.84 MI NORTH CO RT 31/1 (Lat: 39.276031,  Lng: -80.488700),  Route carried "on" structure: County highway 3100,  Year Built: 1986,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 850 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,125 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.185,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.4m (50.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A187,  Location: 0.03 MI WEST CO RT 5 (Lat: 39.289250,  Lng: -80.490211),  Route carried "on" structure: US 5000,  Year Built: 1966,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,300 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: US ROUTE 50 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.785,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $841,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,097,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A189,  Location: 0.03 MI WEST CO RT 5 (Lat: 39.289400,  Lng: -80.490231),  Route carried "on" structure: US 5000,  Year Built: 1966,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,300 (year 2038),  Design Load: HS 20,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: US ROUTE 50 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.785,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $817,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,079,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A301,  Location: 0.42 MI WEST HRR CO RT 5 (Lat: 39.304711,  Lng: -80.486950),  Route carried "on" structure: County highway 509,  Year Built: 1998,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARR CO RT 5/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.009,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A312,  Location: 0.72 MI WEST CO RT 5 (Lat: 39.304781,  Lng: -80.492000),  Route carried "on" structure: County highway 509,  Year Built: 2001,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 300 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO RT 5/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.527,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A32,  Location: 0.02 MI WEST HRR CO RT 31 (Lat: 39.233650,  Lng: -80.487819),  Route carried "on" structure: County highway 2800,  Year Built: 2003,  Status: Open,  Structure Length: 1.93m (6.33ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 140 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARRISON CO RT 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.258,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A326,  Location: 1.11 MI WEST CO RT 5 (Lat: 39.308789,  Lng: -80.495089),  Route carried "on" structure: County highway 509,  Year Built: 2005,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO RT 5/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.899,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A342,  Location: 0.16 MI. N. HAR CO RT 5/7 (Lat: 39.315811,  Lng: -80.479419),  Route carried "on" structure: County highway 500,  Year Built: 2010,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 200 (year 2038),  Design Load: HL 93,  Features Intersected: TENMILE CREEK,  Facility Carried by Structure: HARR CO RT 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.959,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A013,  Location: 0.04 MI NORTH US ROUTE 50 (Lat: 39.290039,  Lng: -80.490269),  Route carried "under" structure: County highway 500,  Year Built: 1922,  Structure Length: 0. m,  Average Daily Traffic: 550 (year 2019),  Truck Traffic: 7%,  Features Intersected: RAILS TO TRAILS,  Facility Carried by Structure: RAILS TO TRAILS
Minimum Vertical Clearance: 11.84m (38.85ft),  Kilometerpoint: 0.064,  Lanes under structure: 2,  Length of Maximum Span: 18.9m (62.0ft)

Discuss Wolf Summit, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.