Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Whitesboro, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 66ft / 20.3mTotal length
  • $6,252,000Total costs
  • 9,034Total average daily traffic
  • 470Total average daily truck traffic
  • 13,218Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Whitesboro
  • No street view available for this location

New bridges in Whitesboro, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 11970-1979
  • 31990-1999
Reconstructed bridges in Whitesboro, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Truck Traffic in Whitesboro, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 66.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Good
  • 43.8%Satisfactory
  • 18.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Very good
  • 30.0%Good
  • 60.0%Satisfactory
Find on map >>   Show street view

Structure Number: 7,  Location: 1.25 MI N ARONEY T9SR5E (Lat: 34.234208,  Lng: -86.070533),  Route carried "on" structure: County highway 10,  Year Built: 1993,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 268 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $542,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 155,  Location: 0.1 MI S OF DCK SPRNGS (Lat: 34.188525,  Lng: -85.962486),  Route carried "on" structure: County highway 341,  Year Built: 1920,  Status: Posted for load,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 70 (year 2003),  Average Future Daily Traffic: 100 (year 2034),  Features Intersected: BIG WILLS CREEK,  Facility Carried by Structure: CAMPBELL GAP RD.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.65m (15.26ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $630,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 298,  Location: @ SARDIS CITY LIMITS (Lat: 34.156764,  Lng: -86.104428),  Route carried "on" structure: County highway 340,  Year Built: 1946,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2003),  Average Future Daily Traffic: 270 (year 2035),  Features Intersected: SHORT CREEK,  Facility Carried by Structure: OAK DRIVE
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 18.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $239,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $263,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3721,  Location: 1.0 MI NE ARONEY T9SR5E (Lat: 34.224475,  Lng: -86.064128),  Route carried "on" structure: County highway 26,  Year Built: 1950,  Status: Open,  Structure Length: 1.48m (4.86ft),  Average Daily Traffic: 1,345 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,999 (year 2040),  Design Load: H 15,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.15m (7.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $548,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4476,  Location: @ DUCK SPRINGS SCHOOL (Lat: 34.143264,  Lng: -86.001361),  Route carried "on" structure: County highway 227,  Year Built: 1952,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 840 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 840 (year 2033),  Design Load: H 15,  Features Intersected: VALLEY CREEK,  Facility Carried by Structure: DUCK SPRINGS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $372,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6069,  Location: 0.1MI SE OF SANDVALLEY RD (Lat: 34.136092,  Lng: -86.052069),  Route carried "on" structure: County highway 337,  Year Built: 1957,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,080 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,545 (year 2032),  Design Load: H 15,  Features Intersected: ROCKY CREEK,  Facility Carried by Structure: LEETH GAP RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $419,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9089,  Location: 1.0 MI S RODENTOWN T9SR6E (Lat: 34.219142,  Lng: -86.010697),  Route carried "on" structure: County highway 25,  Year Built: 1966,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 223 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 331 (year 2040),  Design Load: H 15,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9192,  Location: 0.75 MI N OF SARDIS RD (Lat: 34.185906,  Lng: -86.070614),  Route carried "on" structure: County highway 377,  Year Built: 1966,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 780 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,470 (year 2035),  Features Intersected: OWENS CREEK,  Facility Carried by Structure: SMITH CHAPEL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Excellent,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $337,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $371,000 ( Estimate for 2022),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9193,  Location: 0.18MI SW LEETH GAP CUTOF (Lat: 34.182078,  Lng: -86.055886),  Route carried "on" structure: County highway 386,  Year Built: 1966,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 1,740 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,592 (year 2034),  Design Load: H 15,  Features Intersected: JACOBS CREEK,  Facility Carried by Structure: SARDIS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $469,000 ( Estimate for 2020),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9194,  Location: 0.3MI NE OF LEETH GAP (Lat: 34.176472,  Lng: -86.072217),  Route carried "on" structure: County highway 386,  Year Built: 1966,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,580 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,354 (year 2034),  Design Load: H 15,  Features Intersected: OWENS CREEK,  Facility Carried by Structure: SARDIS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9646,  Location: .5 MI N CO RT 4 (Lat: 34.211625,  Lng: -86.044906),  Route carried "on" structure: County highway 15,  Year Built: 1968,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 196 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 291 (year 2040),  Design Load: H 15,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $285,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9649,  Location: .2 MI N CO RT 4 T9SR6E (Lat: 34.210825,  Lng: -86.036017),  Route carried "on" structure: County highway 17,  Year Built: 1968,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 161 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 239 (year 2040),  Design Load: H 15,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $321,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11628,  Location: 1 MI S CO RT 26 T9SR6E (Lat: 34.226800,  Lng: -86.000922),  Route carried "on" structure: County highway 21,  Year Built: 1976,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 108 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 161 (year 2040),  Design Load: H 15,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CO RT 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $260,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12243,  Location: 0.5 MI N CO RT 4 T9SR5E (Lat: 34.216425,  Lng: -86.056272),  Route carried "on" structure: County highway 2,  Year Built: 1906,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 106 (year 2020),  Average Future Daily Traffic: 158 (year 2040),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CO RT 837
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 13.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $322,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1526,  Location: 300' WEST OF HORTON GAP R (Lat: 34.157836,  Lng: -86.010750),  Route carried "on" structure: County highway 360,  Year Built: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 150 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 100 (year 2033),  Design Load: H 15,  Features Intersected: LITTLE SAND VALLEY CREEK,  Facility Carried by Structure: UNITY CHURCH RD.
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $385,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17711,  Location: .2M SE OF SAND VALLEY RD (Lat: 34.166514,  Lng: -86.017033),  Route carried "on" structure: County highway 361,  Year Built: 1998,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 375 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 500 (year 2033),  Features Intersected: LITTLE SAND VALLEY CREEK,  Facility Carried by Structure: HORTON GAP RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 72.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $442,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Whitesboro, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.