Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for White Creek, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 121ft / 36.8mTotal length
  • $15,664,000Total costs
  • 16,979Total average daily traffic
  • 1,482Total average daily truck traffic
  • 20,136Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for White Creek
  • No street view available for this location

New bridges in White Creek, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21920-1929
  • 21930-1939
  • 101940-1949
  • 11950-1959
  • 11960-1969
  • 21980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in White Creek, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 31980-1989
  • 21990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in White Creek, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Excellent
  • 5.6%Very good
  • 33.3%Good
  • 38.9%Satisfactory
  • 5.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.8%Excellent
  • 15.8%Very good
  • 26.3%Good
  • 10.5%Satisfactory
  • 21.1%Fair
  • 10.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Excellent
  • 15.8%Very good
  • 10.5%Good
  • 52.6%Satisfactory
  • 15.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 35.0%Fair
  • 15.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 101703,  Location: 0.7 MI N JCT 22 & 67 (Lat: 42.961564,  Lng: -73.375778),  Route carried "on" structure: State highway 22,  Year Built: 1936,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 4,355 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,644 (year 2040),  Features Intersected: OWL KILL TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.896,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $885,000,  Roadway Improvement Cost: $518,000,  Total Project Cost: $1,403,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101704,  Location: 1.2 MI S JCT RTE 22 & 372 (Lat: 43.012603,  Lng: -73.378183),  Route carried "on" structure: State highway 22,  Year Built: 1927,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 4,355 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,644 (year 2040),  Design Load: H 20,  Features Intersected: WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.820,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $919,000,  Roadway Improvement Cost: $538,000,  Total Project Cost: $1,457,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102926,  Location: .5 MI W JCT SH 67 & SH 22 (Lat: 42.951114,  Lng: -73.382686),  Route carried "on" structure: State highway 67,  Year Built: 2019,  Status: Open,  Structure Length: 11.77m (38.62ft),  Average Daily Traffic: 2,185 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,330 (year 2040),  Design Load: HL 93,  Features Intersected: BATTENKILL RAILROAD, OWL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.76m (38.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,703,000,  Roadway Improvement Cost: $1,583,000,  Total Project Cost: $4,286,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220379,  Location: 4.9 MI NE OF WHITE CREEK (Lat: 42.982639,  Lng: -73.279400),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 88 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 123 (year 2039),  Design Load: HS 20,  Features Intersected: LITTL WHITE CREEK,  Facility Carried by Structure: GANNON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $260,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22574,  Location: .4 MI NW JCT SH22 & SH67 (Lat: 42.957992,  Lng: -73.377747),  Route carried "on" structure: Other road ,  Year Built: 1870,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 52 (year 2018),  Average Future Daily Traffic: 73 (year 2038),  Features Intersected: BATTENKILL RR,  Facility Carried by Structure: OLD STATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 1,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $476,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320376,  Location: 2.3 MI E JCT RTS 22 & 313 (Lat: 43.032975,  Lng: -73.331128),  Route carried "on" structure: Other road ,  Year Built: 1981,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 328 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 459 (year 2038),  Design Load: HS 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: ASH GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $607,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $963,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 320378,  Location: 2 MI N OF WHITE CREEK (Lat: 42.993400,  Lng: -73.274092),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 417 (year 2019),  Average Future Daily Traffic: 584 (year 2039),  Design Load: H 20,  Features Intersected: LITTLE WHITE CREEK,  Facility Carried by Structure: SHAFTSBURY HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.303,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $515,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330583,  Location: 1.4 MI E CAMBRIDGE (Lat: 43.021419,  Lng: -73.344364),  Route carried "on" structure: ServiceOther road ,  Year Built: 1929,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 26 (year 2019),  Average Future Daily Traffic: 36 (year 2039),  Features Intersected: WHITE CREEK,  Facility Carried by Structure: HILL LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $244,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330597,  Location: 1.3 MI N JCT SH67 & SH22 (Lat: 42.970892,  Lng: -73.357417),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 756 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,058 (year 2036),  Features Intersected: CENTER WHITE CREEK,  Facility Carried by Structure: WHITE CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.706,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $89,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $142,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330606,  Location: 3.4 MI ESE CENT WHITE CRK (Lat: 42.960028,  Lng: -73.308936),  Route carried "on" structure: County highway ,  Year Built: 1933,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 859 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,203 (year 2036),  Design Load: H 20,  Features Intersected: LITTLE WHITE CRK,  Facility Carried by Structure: CR 68, WHITE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.436,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $455,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330621,  Location: 0.4 MI SW CENT WHITE CRK (Lat: 42.968225,  Lng: -73.382956),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 181 (year 2038),  Design Load: H 20,  Features Intersected: OWL KILL,  Facility Carried by Structure: CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.108,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $369,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 330647,  Location: 2 MI E OF CAMBRIDGE (Lat: 43.026475,  Lng: -73.336692),  Route carried "on" structure: County highway ,  Year Built: 1942,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 669 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 937 (year 2036),  Design Load: H 20,  Features Intersected: WHITE CREEK,  Facility Carried by Structure: CR67 ASH GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.588,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $306,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $485,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33065,  Location: 1 MI NE OF BUSKIRK (Lat: 42.963014,  Lng: -73.425364),  Route carried "on" structure: Other road ,  Year Built: 1942,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 98 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 137 (year 2037),  Design Load: H 20,  Features Intersected: UNNAMED STREAM,  Facility Carried by Structure: STAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $177,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330652,  Location: .7 MI E OF BUSKIRK (Lat: 42.959364,  Lng: -73.426656),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 193 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 270 (year 2037),  Features Intersected: BLACK CREEK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $462,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330664,  Location: .5 NNW JCT.RTS.22$67 (Lat: 42.957258,  Lng: -73.378803),  Route carried "on" structure: Other road ,  Year Built: 1942,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 52 (year 2018),  Average Future Daily Traffic: 73 (year 2038),  Features Intersected: OWL KILL,  Facility Carried by Structure: OLD STATE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $559,000,  Roadway Improvement Cost: $327,000,  Total Project Cost: $886,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330665,  Location: 5.1 MI ENE OF EAGLE BRDGE (Lat: 42.972244,  Lng: -73.290511),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 682 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 955 (year 2039),  Design Load: H 20,  Features Intersected: LITTLE WHITE CRK,  Facility Carried by Structure: NILES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $687,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330666,  Location: 4.3 MI ENE OF EAGLE BR (Lat: 42.963875,  Lng: -73.303117),  Route carried "on" structure: Other road ,  Year Built: 1943,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 123 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 172 (year 2037),  Design Load: HS 20,  Features Intersected: LITTLE WHITE CRK,  Facility Carried by Structure: MEETING HOUSE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 65.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $723,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330667,  Location: 0.8 MI N CENT WHITE CREEK (Lat: 42.983756,  Lng: -73.379358),  Route carried "on" structure: Other road ,  Year Built: 1943,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 343 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 480 (year 2038),  Design Load: H 20,  Features Intersected: OWL KILL,  Facility Carried by Structure: OWL KILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $476,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330668,  Location: 2.5 MI N CENT WHITE CREEK (Lat: 43.010067,  Lng: -73.385300),  Route carried "on" structure: Other road ,  Year Built: 1943,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 277 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 388 (year 2038),  Design Load: H 20,  Features Intersected: OWL KILL,  Facility Carried by Structure: SHUNPIKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 6.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 5.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $385,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330669,  Location: .1 MI S OF CAMBRIDGE (Lat: 43.017500,  Lng: -73.383156),  Route carried "on" structure: County highway ,  Year Built: 1947,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 937 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,312 (year 2036),  Features Intersected: OWL KILL,  Facility Carried by Structure: CR 71, HERRINGTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $377,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33067,  Location: 1.7 MI N CENT WHITE CREEK (Lat: 42.994364,  Lng: -73.382706),  Route carried "on" structure: Other road ,  Year Built: 1943,  Year Reconstructed: 1975,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 55 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 77 (year 2038),  Design Load: H 20,  Features Intersected: OWL KILL,  Facility Carried by Structure: BROWNELL CORNERS R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 11.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $275,000,  Roadway Improvement Cost: $161,000,  Total Project Cost: $436,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss White Creek, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.