Bridge Statistics for Wewahitchka, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 157ft / 48.4mTotal length
  • 17,731Total average daily traffic
  • 2,099Total average daily truck traffic
  • 25,720Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wewahitchka
  • No street view available for this location

New bridges in Wewahitchka, FL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 31950-1959
  • 21960-1969
  • 61990-1999
  • 12000-2009
Average Bridge Daily Traffic in Wewahitchka, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 15.4%Good
  • 46.2%Satisfactory
  • 30.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 510004,  Location: 2.1 Miles East of SR 71 (Lat: 30.127439,  Lng: -85.176897),  Route carried "on" structure: County highway 22,  Year Built: 1960,  Status: Open,  Structure Length: 24.38m (79.99ft),  Average Daily Traffic: 414 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 455 (year 2040),  Design Load: HL 93,  Features Intersected: Dead Lakes
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.396,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 510011,  Location: 1.4 Miles East of SR 71 (Lat: 30.124225,  Lng: -85.187589),  Route carried "on" structure: County highway 22,  Year Built: 1951,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,760 (year 2039),  Features Intersected: Chipola Cut-Off
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.240,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 510013,  Location: 1.5 Miles East of SR 71 (Lat: 30.125422,  Lng: -85.186244),  Route carried "on" structure: County highway 22,  Year Built: 1951,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,760 (year 2039),  Features Intersected: Chipola Cut-Off
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.427,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 510031,  Location: 1.2 Miles East of SR 71 (Lat: 30.121167,  Lng: -85.189125),  Route carried "on" structure: County highway 22,  Year Built: 1951,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,760 (year 2039),  Features Intersected: Chipola Cut Off
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.867,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: Febuary 2021
Find on map >>   Show street view

Structure Number: 510037,  Location: 1.2 Mi S. of Wewahitchka (Lat: 30.071019,  Lng: -85.193556),  Route carried "on" structure: State highway 71,  Year Built: 1960,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 4,600 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 7,981 (year 2042),  Design Load: HS 20,  Features Intersected: Tom Smith Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.978,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 510049,  Location: 2.5 Miles West of SR 71 (Lat: 30.074194,  Lng: -85.231750),  Route carried "on" structure: County highway 386,  Year Built: 1949,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,210 (year 2040),  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Underwater Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 510063,  Location: 7.3 mi. South of SR73 (Lat: 30.130547,  Lng: -85.206497),  Route carried "on" structure: State highway 71,  Year Built: 2002,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 5,200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 9,022 (year 2042),  Design Load: HS 20,  Features Intersected: West Arm Lake
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.013,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 514019,  Location: 0.5 Mi N Stone Mill Ck Rd (Lat: 30.171103,  Lng: -85.253575),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Posted for load-capacity,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 770 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 840 (year 2040),  Design Load: HS 20,  Features Intersected: Right Prong Creek,  Facility Carried by Structure: Road 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.697,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.8m (68.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 514053,  Location: 2.0 Miles East of SR 71 (Lat: 30.127278,  Lng: -85.178500),  Route carried "on" structure: County highway 22,  Year Built: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 385 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 424 (year 2039),  Features Intersected: Chipola River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 514055,  Location: 0.7 Miles South of CR22 (Lat: 30.108944,  Lng: -85.180944),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Posted for load,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 55 (year 2020),  Average Future Daily Traffic: 60 (year 2040),  Features Intersected: Cochran Slough,  Facility Carried by Structure: Canning Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 514056,  Location: 1.0 Miles South of CR 22 (Lat: 30.104747,  Lng: -85.179542),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Posted for load,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 33 (year 2020),  Average Future Daily Traffic: 36 (year 2040),  Features Intersected: Cochran Slough,  Facility Carried by Structure: Canning Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.0m (65.6ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 514058,  Location: 2.0 Miles North of SR 22 (Lat: 30.165167,  Lng: -85.248972),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 330 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 363 (year 2038),  Features Intersected: Stone Mill Creek,  Facility Carried by Structure: Road 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.240,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 514061,  Location: 1.3 Miles West of SR 71 (Lat: 30.157497,  Lng: -85.230264),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 44 (year 2020),  Average Future Daily Traffic: 49 (year 2040),  Features Intersected: Stone Mill Creek,  Facility Carried by Structure: S Dianna Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.739,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Other Special Inspection Date: December 2021,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous