Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Hamburg, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 79ft / 23.8mTotal length
  • $1,967,000Total costs
  • 166,889Total average daily traffic
  • 46,257Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Hamburg
  • No street view available for this location

New bridges in West Hamburg, PA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 41950-1959
  • 61960-1969
  • 21980-1989
  • 12010-2019
Reconstructed bridges in West Hamburg, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in West Hamburg, PA
Average Bridge Truck Traffic in West Hamburg, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 41.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 8.3%Good
  • 33.3%Satisfactory
  • 41.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 25.0%Poor
Find on map >>   Show street view

Structure Number: 4607,  Location: I-78/PA 61 INTERCHANGE (Lat: 40.557044,  Lng: -75.998075),  Route carried "on" structure: State highway 61,  Year Built: 1954,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 21,448 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 29,844 (year 2032),  Design Load: HS 20,  Features Intersected: I-78 (LR 285)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.385,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $31,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $421,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4609,  Location: 1.5 MI N OF HAMBURG (Lat: 40.571347,  Lng: -76.015250),  Route carried "on" structure: State highway 61,  Year Built: 1952,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 21,448 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 29,844 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BARTRAM TR (RAIL-TRAILS)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.840,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 22.1m (72.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Critical Feature Inspection Date: January 2020,  Bridge Improvement Cost: $35,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $473,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4655,  Location: 1.5 MI.W.OF HAMBURG (Lat: 40.545883,  Lng: -76.027608),  Route carried "on" structure: Interstate 78,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 35,468 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 44,209 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWP.RD 742 ACADEMY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.851,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 27.9m (91.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $9,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $117,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4657,  Location: 1 MI.W.OF HAMBURG (Lat: 40.549806,  Lng: -76.016617),  Route carried "on" structure: Interstate 78,  Year Built: 1962,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 35,468 (year 2021),  Truck Traffic: 38%,  Average Future Daily Traffic: 44,209 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TWP.RD 558(PINE ROAD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.462,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 25.9m (85.0ft),  Out-to-Out Width: 27.9m (91.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $248,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 527,  Location: ST.MICHAELS ROAD (Lat: 40.525886,  Lng: -76.039642),  Route carried "on" structure: Spur State highway ,  Year Built: 1987,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,847 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,939 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK,  Facility Carried by Structure: SR 4028(LR06032SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.063,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5272,  Location: HEX HWY NEAR WILLOW ROAD (Lat: 40.532883,  Lng: -76.027331),  Route carried "on" structure: Spur State highway ,  Year Built: 1932,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,290 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,939 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB.TO MILL CREEK,  Facility Carried by Structure: SR 4028(LR06032SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.485,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $252,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5273,  Location: HEX HWY.NEAR PINE ROAD (Lat: 40.540261,  Lng: -76.012181),  Route carried "on" structure: Spur State highway ,  Year Built: 1932,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,290 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,939 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB.TO MILL CREEK,  Facility Carried by Structure: SR 4028(LR06032SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.458,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5461,  Location: EAST OF JALAPPA (Lat: 40.529422,  Lng: -76.023500),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 75 (year 2013),  Average Future Daily Traffic: 100 (year 2023),  Design Load: HS 20,  Features Intersected: NO. BRANCH MILL CREEK,  Facility Carried by Structure: CHEESE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5462,  Location: NW OF BERNE (Lat: 40.532997,  Lng: -76.009578),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 200 (year 1990),  Truck Traffic: 1%,  Average Future Daily Traffic: 442 (year 2030),  Design Load: HS 20,  Features Intersected: HASSLER RUN,  Facility Carried by Structure: CHEESE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5463,  Location: WEST OF PINE ROAD (Lat: 40.545947,  Lng: -76.015925),  Route carried "on" structure: City street ,  Year Built: 1963,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 75 (year 2013),  Average Future Daily Traffic: 100 (year 2023),  Design Load: HS 20,  Features Intersected: HASSLER RUN,  Facility Carried by Structure: ACADEMY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5464,  Location: 0.6 MI. WEST OF JALAPPA (Lat: 40.525706,  Lng: -76.046908),  Route carried "on" structure: State highway ,  Year Built: 1932,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,822 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,500 (year 2019),  Design Load: HS 20,  Features Intersected: WOLFE RUN,  Facility Carried by Structure: HEX HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.728,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $70,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52414,  Location: 1.3 Mi. W. of SR 61 (Lat: 40.522142,  Lng: -75.997886),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 1,202 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,235 (year 2025),  Design Load: HL 93,  Features Intersected: Schuylkill River,  Facility Carried by Structure: Fisher Dam Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4607,  Location: I-78/PA 61 INTERCHANGE (Lat: 40.557044,  Lng: -75.998075),  Route carried "under" structure: Interstate 78,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 21,830 (year 2022),  Truck Traffic: 33%,  Features Intersected: I-78 (LR 285),  Facility Carried by Structure: PA 61 (LR 160)
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 34.075,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 4607,  Location: I-78/PA 61 INTERCHANGE (Lat: 40.557044,  Lng: -75.998075),  Route carried "under" structure: Interstate 78,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 18,026 (year 2022),  Truck Traffic: 35%,  Features Intersected: I-78 (LR 285),  Facility Carried by Structure: PA 61 (LR 160)
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 34.047,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 4655,  Location: 1.5 MI.W.OF HAMBURG (Lat: 40.545883,  Lng: -76.027608),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: TWP.RD 742 ACADEMY RD.,  Facility Carried by Structure: SR 78 (LR 141)
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 4657,  Location: 1 MI.W.OF HAMBURG (Lat: 40.549806,  Lng: -76.016617),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Features Intersected: TWP.RD 558(PINE ROAD),  Facility Carried by Structure: SR 78 (LR 141)
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 9.8m (32.2ft)

Discuss West Hamburg, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.