Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Greenwich, Rhode Island (RI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 131ft / 39.9mTotal length
  • $24,456,000Total costs
  • 309,611Total average daily traffic
  • 39,014Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Greenwich
  • No street view available for this location

New bridges in West Greenwich, RI - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 51950-1959
  • 51960-1969
  • 32000-2009
Reconstructed bridges in West Greenwich, RI - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in West Greenwich, RI
Average Bridge Truck Traffic in West Greenwich, RI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 63.6%Good
  • 36.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 25.0%Good
  • 41.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.7%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 36,  Location: 2.3 Mi S of JCT I-95 (Lat: 41.626708,  Lng: -71.632653),  Route carried "on" structure: State highway 3,  Year Built: 1924,  Year Reconstructed: 1939,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,944 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,438 (year 2041),  Design Load: HS 20,  Features Intersected: NOOSENECK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.569,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 24.3m (79.7ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $484,000
Find on map >>   Show street view

Structure Number: 52,  Location: 0.5 Mi W of JCT RI 3 (Lat: 41.413797,  Lng: -71.797217),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 3.67m (12.04ft),  Average Daily Traffic: 759 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 835 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: PAWCATUCK RIVER,  Facility Carried by Structure: POTTER HILL RD
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 4.118,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.67m (12.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $833,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,249,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 118,  Location: URI Alton Jones Campus (Lat: 41.616869,  Lng: -71.719486),  Route carried "on" structure: State lands road ,  Year Built: 1931,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 9 (year 2021),  Truck Traffic: 67%,  Average Future Daily Traffic: 10 (year 2041),  Design Load: HS 20,  Features Intersected: EISENHOWER LAKE,  Facility Carried by Structure: WHISPER PINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.340,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $27,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $41,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 517,  Location: 1.3 Mi S of NEW LONDON TP (Lat: 41.652717,  Lng: -71.575333),  Route carried "on" structure: Interstate 95,  Year Built: 1958,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 53,440 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 58,784 (year 2041),  Design Load: HS 20,  Features Intersected: HOPKINS HILL RD
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 32.048,  Lanes on structure: 5,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 32.3m (106.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,616,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 519,  Location: 2.0 Mi E of JCT RI 3 (Lat: 41.659336,  Lng: -71.547944),  Route carried "on" structure: Alternate State highway ,  Year Built: 1957,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 8.20m (26.90ft),  Average Daily Traffic: 11,087 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,196 (year 2041),  Design Load: HS 20,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: NEW LONDON TRNPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.845,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,501,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $3,752,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52,  Location: 0.7 Mi N DIVISION ST. (Lat: 41.650967,  Lng: -71.605997),  Route carried "on" structure: State highway 3,  Year Built: 1957,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 12,310 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,541 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-95 NB & SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.257,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,241,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $3,362,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 521,  Location: 0.7 Mi S of JCT RI 3 (Lat: 41.648858,  Lng: -71.613653),  Route carried "on" structure: Interstate 95,  Year Built: 1960,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 49,641 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 59,570 (year 2036),  Design Load: HS 20,  Features Intersected: BIG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.711,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $295,000
Find on map >>   Show street view

Structure Number: 586,  Location: 1.0 Mi S of JCT RI 3 (Lat: 41.639792,  Lng: -71.624953),  Route carried "on" structure: Interstate 95,  Year Built: 1968,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 50,500 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 55,550 (year 2041),  Design Load: HS 20,  Features Intersected: WEAVER HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.331,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 56.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $739,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,108,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5862,  Location: 1.0 Mi S of JCT RI 3 (Lat: 41.639947,  Lng: -71.625364),  Route carried "on" structure: Interstate 95,  Year Built: 1968,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 50,500 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 55,550 (year 2041),  Design Load: HS 20,  Features Intersected: WEAVER HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.324,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $185,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $278,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 588,  Location: 1.3 Mi N of JCT RI 102 (Lat: 41.619231,  Lng: -71.645358),  Route carried "on" structure: Interstate 95,  Year Built: 2007,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 24,820 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,784 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: ROBIN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.473,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.9m (65.3ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,288,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,932,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5882,  Location: 1.3 Mi N of JCT RI 102 (Lat: 41.619442,  Lng: -71.645992),  Route carried "on" structure: Interstate 95,  Year Built: 2007,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 24,820 (year 2008),  Truck Traffic: 10%,  Average Future Daily Traffic: 29,784 (year 2036),  Design Load: HS 20,  Features Intersected: ROBIN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.194,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $296,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 5895,  Location: 0.8 Mi S of JCT RI165 (Lat: 41.603219,  Lng: -71.657419),  Route carried "on" structure: State highway 102,  Year Built: 1969,  Status: Open,  Structure Length: 9.67m (31.73ft),  Average Daily Traffic: 7,203 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,923 (year 2041),  Design Load: HL 93,  Features Intersected: I-95 NB and SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.484,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.1m (62.7ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.60m (31.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $6,695,000,  Roadway Improvement Cost: $669,000,  Total Project Cost: $10,043,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1216,  Location: 0.11Mi SofJct Muddy Br RD (Lat: 41.635389,  Lng: -71.766017),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 1980,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 65 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 72 (year 2041),  Features Intersected: Kelley Brook,  Facility Carried by Structure: HUDSON POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52,  Location: 0.7 Mi N DIVISION ST. (Lat: 41.650967,  Lng: -71.605997),  Route carried "under" structure: Interstate 95,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 12,310 (year 2021),  Truck Traffic: 4%,  Features Intersected: I-95 NB & SB,  Facility Carried by Structure: RI 3 NSNCK HILL RD
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 5895,  Location: 0.8 Mi S of JCT RI165 (Lat: 41.603219,  Lng: -71.657419),  Route carried "under" structure: Interstate 95,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 7,203 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-95 NB and SB,  Facility Carried by Structure: RI 102 VICTORY HWY
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Discuss West Greenwich, Rhode Island (RI) on our hugely popular Rhode Island forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.