Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West End, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 21Number of bridges
  • 220ft / 66.7mTotal length
  • $34,369,000Total costs
  • 82,331Total average daily traffic
  • 11,315Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West End
  • No street view available for this location

New bridges in West End, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 111970-1979
  • 31990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in West End, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in West End, NY
Average Bridge Truck Traffic in West End, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Excellent
  • 20.0%Very good
  • 46.7%Good
  • 6.7%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 25.0%Very good
  • 43.8%Good
  • 6.3%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 31.3%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 26.7%Satisfactory
  • 33.3%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 100396,  Location: 3.3 MI SW JCT RTS 7 + 23 (Lat: 42.422389,  Lng: -75.141178),  Route carried "on" structure: State highway 7,  Year Built: 1931,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,689 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,327 (year 2040),  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.396,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $567,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100397,  Location: 1.9 MI SW JCT SH 7 & SH 2 (Lat: 42.435872,  Lng: -75.120578),  Route carried "on" structure: State highway 7,  Year Built: 1994,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 3,121 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,791 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OTEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,195,000,  Roadway Improvement Cost: $700,000,  Total Project Cost: $1,895,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101756,  Location: 3.4 MI N WEST ONEONTA (Lat: 42.516047,  Lng: -75.138231),  Route carried "on" structure: State highway 23,  Year Built: 1936,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 3,913 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,950 (year 2040),  Features Intersected: HARRISON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.636,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $694,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101757,  Location: 2.9 MI N WEST ONEONTA (Lat: 42.509964,  Lng: -75.135494),  Route carried "on" structure: State highway 23,  Year Built: 1936,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 3,913 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,950 (year 2040),  Design Load: HS 20,  Features Intersected: HARRISON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.360,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $939,000,  Roadway Improvement Cost: $550,000,  Total Project Cost: $1,489,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101758,  Location: 0.5 MI SE WEST ONEONTA (Lat: 42.470706,  Lng: -75.108431),  Route carried "on" structure: State highway 23,  Year Built: 2009,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 5,355 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,462 (year 2040),  Design Load: HL 93,  Features Intersected: OTEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.831,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.7m (130.2ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,828,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $2,899,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109402,  Location: 2.4 MI SW ONEONTA CITY LI (Lat: 42.413514,  Lng: -75.138400),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 533 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 746 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I88,  Facility Carried by Structure: COUNTY ROAD 48
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.241,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.41m (27.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,215,000,  Roadway Improvement Cost: $1,297,000,  Total Project Cost: $3,513,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1094141,  Location: .8 MI W ONEONTA CITY LINE (Lat: 42.429450,  Lng: -75.119969),  Route carried "on" structure: Interstate 88,  Year Built: 1975,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 6,294 (year 2010),  Truck Traffic: 24%,  Design Load: HL 93,  Features Intersected: OTEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,281,000,  Roadway Improvement Cost: $750,000,  Total Project Cost: $2,031,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1094142,  Location: .8 MI W ONEONTA CITY LINE (Lat: 42.429089,  Lng: -75.120031),  Route carried "on" structure: Interstate 88,  Year Built: 1975,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 4,863 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 6,397 (year 2040),  Design Load: HL 93,  Features Intersected: OTEGO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.590,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,284,000,  Roadway Improvement Cost: $752,000,  Total Project Cost: $2,036,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 109432,  Location: 1.3 MI W ONEONTA TOWN LNE (Lat: 42.426644,  Lng: -75.130289),  Route carried "on" structure: Interstate 88,  Year Built: 1973,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 9,726 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,793 (year 2040),  Design Load: HS 20,  Features Intersected: MACHINERY UNDRPSS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.705,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Culverts: Good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $219,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109433,  Location: 0.5 MI SW ONEONTA CITY LI (Lat: 42.430375,  Lng: -75.114878),  Route carried "on" structure: Interstate 88,  Year Built: 1973,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 9,726 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 12,793 (year 2040),  Design Load: HS 20,  Features Intersected: MACHINERY UN-PASS
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 10.040,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $219,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1094351,  Location: JCT RTE I88+SUSQUEHANNA R (Lat: 42.416792,  Lng: -75.138294),  Route carried "on" structure: Interstate 88,  Year Built: 1975,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 6,294 (year 2010),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.353,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,111,000,  Roadway Improvement Cost: $1,822,000,  Total Project Cost: $4,933,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1094352,  Location: JCT RTE I88+SUSQUEHANNA R (Lat: 42.416808,  Lng: -75.137856),  Route carried "on" structure: Interstate 88,  Year Built: 1975,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 4,863 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,792 (year 2040),  Design Load: HS 20,  Features Intersected: SUSQUEHANNA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.385,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.2m (164.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.18m (33.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,259,000,  Roadway Improvement Cost: $1,908,000,  Total Project Cost: $5,167,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109533,  Location: AT CITY OF ONEONTA (Lat: 42.441681,  Lng: -75.106667),  Route carried "on" structure: State highway 205,  Year Built: 1973,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 13,058 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,131 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,482,000,  Roadway Improvement Cost: $1,454,000,  Total Project Cost: $3,936,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222785,  Location: 1 MI WEST OF WEST ONEONTA (Lat: 42.470142,  Lng: -75.122594),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 173 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 242 (year 2037),  Features Intersected: WEST BRANCH OTEGO CREEK,  Facility Carried by Structure: MILL CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $69,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $109,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222786,  Location: 0.2 MI E INT NYS RT 7 (Lat: 42.435200,  Lng: -75.120506),  Route carried "on" structure: Other road ,  Year Built: 1992,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 215 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 301 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: PONY FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $959,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222787,  Location: 1 MI SW OF WEST ONEONTA (Lat: 42.434283,  Lng: -75.123169),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 281 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 393 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MP 557.30 DELAWARE & HU,  Facility Carried by Structure: PONY FARM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,010,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2271,  Location: 0.2 mi E CR7 @ Upper Gree (Lat: 42.464161,  Lng: -75.173506),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 0.79m (2.59ft),  Design Load: HS 25 or greater,  Features Intersected: E BR OTSDAWA CREEK,  Facility Carried by Structure: UPPER GREEN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $433,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335382,  Location: 0.8 MI W OF WEST ONEONTA (Lat: 42.457847,  Lng: -75.112000),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 1,328 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,859 (year 2037),  Features Intersected: OTEGO CREEK,  Facility Carried by Structure: COUNTY ROAD 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.282,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $485,000,  Total Project Cost: $1,314,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335385,  Location: 1 MILE N OF WEST ONEONTA (Lat: 42.486628,  Lng: -75.117531),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 771 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 953 (year 2040),  Features Intersected: HARRISON CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $159,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335386,  Location: 1.0 MI SW OF LAURENS (Lat: 42.511269,  Lng: -75.106431),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 615 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 641 (year 2040),  Features Intersected: WHARTON CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.025,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $496,000,  Roadway Improvement Cost: $291,000,  Total Project Cost: $787,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109402,  Location: 2.4 MI SW ONEONTA CITY LI (Lat: 42.413514,  Lng: -75.138400),  Route carried "under" structure: Interstate 88,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 1979),  Features Intersected: RTE I88,  Facility Carried by Structure: COUNTY ROAD 48
Minimum Vertical Clearance: 7.74m (25.39ft),  Kilometerpoint: 7.064,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Discuss West End, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.