Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Brownsville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 335ft / 102mTotal length
  • $6,553,000Total costs
  • 35,580Total average daily traffic
  • 1,383Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Brownsville
  • No street view available for this location

New bridges in West Brownsville, PA - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 81960-1969
  • 32010-2019
Reconstructed bridges in West Brownsville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in West Brownsville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 75.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 16965,  Location: BROWNSVILLE & JEFFERSON T (Lat: 40.034122,  Lng: -79.874847),  Route carried "on" structure: State highway ,  Year Built: 1962,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 1,889 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,517 (year 2032),  Design Load: H 20,  Features Intersected: REDSTONE CREEK,  Facility Carried by Structure: SR 4003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.143,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $566,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "on" structure: US 40,  Year Built: 1960,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 65.01m (213.29ft),  Average Daily Traffic: 11,079 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,056 (year 2035),  Design Load: HS 25 or greater,  Features Intersected: MON,0088,4003,4035,2 R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.574,  Lanes on structure: 2,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 31 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 9,  Length of Maximum Span: 157.9m (518.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 65.00m (213.25ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $343,000,  Roadway Improvement Cost: $1,009,000,  Total Project Cost: $4,626,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35024,  Location: OLD BROWNSVILLE BRIDGE (Lat: 40.022292,  Lng: -79.889739),  Route carried "on" structure: Spur State highway ,  Year Built: 1913,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 28.80m (94.49ft),  Average Daily Traffic: 2,366 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,420 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: NS R/R, MON, CITY ST,  Facility Carried by Structure: SR 2067
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 158.5m (520.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.80m (94.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: November 2019,  Bridge Improvement Cost: $101,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $1,361,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 57111,  Location: WEST BROWNSVILLE BOROUGH (Lat: 40.028150,  Lng: -79.894611),  Route carried "on" structure: Ramp State highway ,  Year Built: 2019,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 1,736 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,719 (year 2041),  Design Load: HL 93,  Features Intersected: SR 0040,  Facility Carried by Structure: SR 8042
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,390 (year 2021),  Truck Traffic: 4%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway 88,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 774 (year 2021),  Truck Traffic: 5%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 15.03m (49.31ft),  Kilometerpoint: 10.095,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway 88,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 871 (year 2021),  Truck Traffic: 4%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 14.51m (47.60ft),  Kilometerpoint: 10.078,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 1,889 (year 2022),  Truck Traffic: 3%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 23.01m (75.49ft),  Kilometerpoint: 7.604,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 770 (year 2021),  Truck Traffic: 5%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 15.03m (49.31ft),  Kilometerpoint: 4.543,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 34398,  Location: BROWNSVILLE HIGH-LEVEL (Lat: 40.026583,  Lng: -79.888461),  Route carried "under" structure: State highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 770 (year 2021),  Truck Traffic: 5%,  Features Intersected: MON,0088,4003,4035,2 R/R,  Facility Carried by Structure: SR 0040
Minimum Vertical Clearance: 14.50m (47.57ft),  Kilometerpoint: 4.543,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Length of Maximum Span: 157.9m (518.0ft)

Find on map >>   Show street view

Structure Number: 35024,  Location: OLD BROWNSVILLE BRIDGE (Lat: 40.022292,  Lng: -79.889739),  Route carried "under" structure: City street ,  Year Built: 1913,  Structure Length: 0. m,  Features Intersected: NS R/R, MON, CITY ST,  Facility Carried by Structure: SR 2067
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 158.5m (520.0ft)

Find on map >>   Show street view

Structure Number: 57111,  Location: WEST BROWNSVILLE BOROUGH (Lat: 40.028150,  Lng: -79.894611),  Route carried "under" structure: US 40,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 4,391 (year 2020),  Truck Traffic: 4%,  Features Intersected: SR 0040,  Facility Carried by Structure: SR 8042
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 59.747,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 57111,  Location: WEST BROWNSVILLE BOROUGH (Lat: 40.028150,  Lng: -79.894611),  Route carried "under" structure: US 40,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 5,655 (year 2022),  Truck Traffic: 4%,  Features Intersected: SR 0040,  Facility Carried by Structure: SR 8042
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 59.905,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss West Brownsville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.