Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for West Alexander, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 164ft / 49.7mTotal length
  • $2,619,000Total costs
  • 200,817Total average daily traffic
  • 67,707Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for West Alexander
  • No street view available for this location

New bridges in West Alexander, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 11940-1949
  • 21950-1959
  • 171960-1969
  • 22000-2009
  • 12010-2019
Reconstructed bridges in West Alexander, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 21970-1979
  • 31980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in West Alexander, PA
Average Bridge Truck Traffic in West Alexander, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.0%Very good
  • 45.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 30.0%Good
  • 35.0%Satisfactory
  • 20.0%Fair
  • 5.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Good
  • 50.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 47.1%Satisfactory
  • 35.3%Fair
  • 11.8%Poor
Find on map >>   Show street view

Structure Number: 34423,  Location: DONEGAL TOWNSHIP (Lat: 40.103100,  Lng: -80.502194),  Route carried "on" structure: State highway ,  Year Built: 1966,  Status: Open,  Structure Length: 10.12m (33.20ft),  Average Daily Traffic: 418 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,989 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3034 (T-903)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $219,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 34424,  Location: DONEGAL TOWNSHIP (Lat: 40.108558,  Lng: -80.491883),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 16,306 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 18,372 (year 2032),  Design Load: HS 20,  Features Intersected: ABANDONED RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.469,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $14,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $183,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34426,  Location: DONEGAL TOWNSHIP (Lat: 40.108475,  Lng: -80.492372),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 16,634 (year 2022),  Truck Traffic: 35%,  Average Future Daily Traffic: 18,158 (year 2032),  Design Load: HS 20,  Features Intersected: ABANDONED RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.453,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.90m (19.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34429,  Location: DONEGAL TOWNSHIP (Lat: 40.119392,  Lng: -80.475964),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 16,306 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 18,372 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BR DUTCH FORK BUFFALO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.085,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $313,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3443,  Location: DONEGAL TOWNSHIP (Lat: 40.119614,  Lng: -80.475697),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 16,634 (year 2022),  Truck Traffic: 35%,  Average Future Daily Traffic: 18,158 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BR DUTCH FORK BUFFALO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.072,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34431,  Location: DONEGAL TOWNSHIP (Lat: 40.113692,  Lng: -80.465397),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 16,306 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 18,372 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: DUTCH FORK BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.689,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34432,  Location: DONEGAL TOWNSHIP (Lat: 40.113975,  Lng: -80.465397),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 16,634 (year 2022),  Truck Traffic: 35%,  Average Future Daily Traffic: 18,158 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: DUTCH FORK BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.716,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34433,  Location: DONEGAL TOWNSHIP (Lat: 40.114294,  Lng: -80.456728),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 16,306 (year 2022),  Truck Traffic: 34%,  Average Future Daily Traffic: 18,372 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: DUTCH FORK BUFFALO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.441,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 34434,  Location: DONEGAL TOWNSHIP (Lat: 40.114669,  Lng: -80.456800),  Route carried "on" structure: Interstate 70,  Year Built: 1961,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 16,634 (year 2022),  Truck Traffic: 35%,  Average Future Daily Traffic: 18,158 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: DUTCH FORK OF BUFFALO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.425,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35032,  Location: DONEGAL TOWNSHIP (Lat: 40.149111,  Lng: -80.476392),  Route carried "on" structure: State highway ,  Year Built: 1933,  Year Reconstructed: 1945,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 144 (year 2022),  Truck Traffic: 23%,  Average Future Daily Traffic: 310 (year 2032),  Design Load: H 15,  Features Intersected: RALSTON RUN,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.439,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $64,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35036,  Location: DONEGAL TOWNSHIP (Lat: 40.162322,  Lng: -80.470017),  Route carried "on" structure: State highway ,  Year Built: 1964,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 41 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 100 (year 2032),  Design Load: HL 93,  Features Intersected: DUTCH FORK BUFFALO CREEK,  Facility Carried by Structure: SR 3004
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $86,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 35062,  Location: WEST FINLEY TOWNSHIP (Lat: 40.068208,  Lng: -80.508558),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 118 (year 2022),  Truck Traffic: 36%,  Average Future Daily Traffic: 149 (year 2032),  Design Load: H 20,  Features Intersected: BR OF MID WHEELING CREEK,  Facility Carried by Structure: SR 3018
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.719,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35065,  Location: WEST FINLEY TOWNSHIP (Lat: 40.067803,  Lng: -80.482097),  Route carried "on" structure: State highway ,  Year Built: 1941,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 39 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 936 (year 2032),  Design Load: H 15,  Features Intersected: MIDDLE WHEELING CREEK,  Facility Carried by Structure: SR 3021
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.131,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $279,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35066,  Location: WEST FINLEY TOWNSHIP (Lat: 40.068333,  Lng: -80.490000),  Route carried "on" structure: State highway ,  Year Built: 1953,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 710 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 779 (year 2032),  Design Load: HS 20,  Features Intersected: MIDDLE WHEELING CREEK,  Facility Carried by Structure: SR 3021
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.250,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $45,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35069,  Location: DONEGAL TOWNSHIP (Lat: 40.076936,  Lng: -80.504031),  Route carried "on" structure: State highway ,  Year Built: 1953,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 784 (year 2022),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,004 (year 2032),  Design Load: HS 20,  Features Intersected: BR. MIDDLE WHEELING CK.,  Facility Carried by Structure: SR 3023
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.783,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Poor,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35073,  Location: DONEGAL TOWNSHIP (Lat: 40.099967,  Lng: -80.505819),  Route carried "on" structure: State highway ,  Year Built: 1966,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 8.66m (28.41ft),  Average Daily Traffic: 2,198 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,993 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3023
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.268,  Lanes on structure: 2,  Lanes under structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.50m (27.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $1,283,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35077,  Location: DONEGAL TOWNSHIP (Lat: 40.111797,  Lng: -80.460000),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 7 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 4 (year 2032),  Design Load: H 20,  Features Intersected: BRANCH OF BUFFALO CREEK,  Facility Carried by Structure: SR 3025
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.689,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $7,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $91,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 35271,  Location: 150' EAST OF SR3001 (Lat: 40.122886,  Lng: -80.473939),  Route carried "on" structure: City street ,  Year Built: 1915,  Status: Posted for load,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 90 (year 1993),  Average Future Daily Traffic: 75 (year 2013),  Design Load: HS 25 or greater,  Features Intersected: BUFFALO CREEK TRIB.,  Facility Carried by Structure: RODGERS BR.(T-487)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $56,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 44378,  Location: 50' South of SR 3018 (Lat: 40.066544,  Lng: -80.516253),  Route carried "on" structure: City street T324,  Year Built: 2006,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 50 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 50 (year 2027),  Design Load: HL 93,  Features Intersected: MIDDLE WHEELING CREEK,  Facility Carried by Structure: Erskine Road T-324
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Toll: On toll road,  Owner: County Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 3.3m (10.8ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4438,  Location: 40' North of Twp Rd 360 (Lat: 40.088233,  Lng: -80.487442),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 50 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2028),  Design Load: H 15,  Features Intersected: MIDDLE WHEELING CREEK,  Facility Carried by Structure: Waynesburg Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Toll: Toll bridge,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 47084,  Location: 3.4 mi N from SR 0040 (Lat: 40.165378,  Lng: -80.471367),  Route carried "on" structure: State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 56 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 56 (year 2032),  Design Load: HL 93,  Features Intersected: Dutch Fork Buffalo Creek,  Facility Carried by Structure: SR 3001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.446,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 34423,  Location: DONEGAL TOWNSHIP (Lat: 40.103100,  Lng: -80.502194),  Route carried "under" structure: Interstate 70,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 16,306 (year 2022),  Truck Traffic: 34%,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3034 (T-903)
Minimum Vertical Clearance: 9.60m (31.50ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 34423,  Location: DONEGAL TOWNSHIP (Lat: 40.103100,  Lng: -80.502194),  Route carried "under" structure: Interstate 70,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 16,634 (year 2022),  Truck Traffic: 35%,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3034 (T-903)
Minimum Vertical Clearance: 9.45m (31.00ft),  Kilometerpoint: 1.585,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 35073,  Location: DONEGAL TOWNSHIP (Lat: 40.099967,  Lng: -80.505819),  Route carried "under" structure: Interstate 70,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 15,715 (year 2021),  Truck Traffic: 33%,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3023
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.840,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 35073,  Location: DONEGAL TOWNSHIP (Lat: 40.099967,  Lng: -80.505819),  Route carried "under" structure: Interstate 70,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 15,697 (year 2021),  Truck Traffic: 33%,  Features Intersected: SR 0070,  Facility Carried by Structure: SR 3023
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.843,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.3m (83.0ft)

Discuss West Alexander, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.