Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wellesley, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 125ft / 38.0mTotal length
  • $31,745,000Total costs
  • 710,568Total average daily traffic
  • 25,056Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wellesley
  • No street view available for this location

New bridges in Wellesley, MA - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 11910-1919
  • 101930-1939
  • 21990-1999
  • 12010-2019
Reconstructed bridges in Wellesley, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 51990-1999
  • 32000-2009
Average Bridge Daily Traffic in Wellesley, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 25.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 13.3%Very good
  • 53.3%Good
  • 26.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.7%Very good
  • 60.0%Good
  • 26.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: D100074D8DOTNBI,  Location: 0.8 KM N. OF BRIDGE ST (Lat: 42.275794,  Lng: -71.309569),  Route carried "on" structure: State lands road ,  Year Built: 1897,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 1,164 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,527 (year 2032),  Features Intersected: WATER CHARLES RIVER,  Facility Carried by Structure: HWY CHENEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.4m (60.4ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,244,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $3,367,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: D100084D9DOTNBI,  Location: IN DOVER (Lat: 42.277292,  Lng: -71.305014),  Route carried "on" structure: State lands road ,  Year Built: 1850,  Year Reconstructed: 1925,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 260 (year 2020),  Average Future Daily Traffic: 632 (year 2031),  Features Intersected: WATER CHARLES RIVER INLT,  Facility Carried by Structure: HWY ELM BANK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 3.0m (9.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 58.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $1,353,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,030,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W130042P9DOT634,  Location: 0.5 MI WEST RTE 16 (Lat: 42.323617,  Lng: -71.271983),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 1.85m (6.07ft),  Average Daily Traffic: 5,400 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,897 (year 2032),  Design Load: H 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY GLEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,180,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $3,271,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130052P8DOT634,  Location: .48 KM NW RTE 16 (Lat: 42.318458,  Lng: -71.273883),  Route carried "on" structure: City street ,  Year Built: 1890,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 2.76m (9.06ft),  Average Daily Traffic: 3,400 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,159 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY WOODLAWN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.5m (83.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,611,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $2,417,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130062P3DOT634,  Location: 0.40 KM WLY RT 16 (Lat: 42.312242,  Lng: -71.276292),  Route carried "on" structure: State highway 9,  Year Built: 1932,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 33,750 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 86,862 (year 2031),  Design Load: HS 20,  Features Intersected: RR CSX/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 212.428,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 34 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.4m (83.3ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,286,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,930,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130072P7DOT634,  Location: .08 KM NLY RTE 16 (Lat: 42.308478,  Lng: -71.278733),  Route carried "on" structure: City street ,  Year Built: 1917,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 5,800 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,528 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY ROCKLAND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.2m (30.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 27.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130082P4DOT634,  Location: .16 KM NW RT 16 (Lat: 42.302417,  Lng: -71.287067),  Route carried "on" structure: City street ,  Year Built: 1889,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 14,870 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 28,427 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY KINGSBURY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $1,396,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,095,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130092P6DOT634,  Location: .16 KM NWLY RT 16 (Lat: 42.297108,  Lng: -71.295042),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 10,200 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,163 (year 2033),  Design Load: HS 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY CREST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,017,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,526,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130102P5DOT634,  Location: 0.8 KM N RTE 135 (Lat: 42.296292,  Lng: -71.299367),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 18,600 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,955 (year 2032),  Design Load: HS 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY WESTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.2m (66.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $651,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $977,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130132EKDOTNBI,  Location: 2.4 MI WLY RT 16 (Lat: 42.305372,  Lng: -71.312744),  Route carried "on" structure: US 9,  Year Built: 1932,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 66,000 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 105,655 (year 2032),  Design Load: H 20,  Features Intersected: HWY WESTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 197.229,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 2.5m (8.2ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,817,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,726,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W130142E9DOTNBI,  Location: RT 16 AT RT 9 (Lat: 42.314194,  Lng: -71.272306),  Route carried "on" structure: State highway 16,  Year Built: 1932,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 42,000 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 85,440 (year 2032),  Design Load: HS 20,  Features Intersected: ST 9 WORCESTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.651,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.6m (8.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,689,000,  Roadway Improvement Cost: $269,000,  Total Project Cost: $4,034,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: W130152MHDOTNBI,  Location: 1.1 KM WLY RT 128 (Lat: 42.315658,  Lng: -71.246639),  Route carried "on" structure: City street ,  Year Built: 1932,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 26,400 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 30,796 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: ST 9 WORCESTER ST,  Facility Carried by Structure: HWY CEDAR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: W130162EJDOTNBI,  Location: 0.35 MI WLY RT 16 (Lat: 42.311933,  Lng: -71.277075),  Route carried "on" structure: State highway 9,  Year Built: 1932,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 100,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 84,650 (year 2032),  Design Load: H 20,  Features Intersected: HWY CLIFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 200.310,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,496,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $2,245,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W130172MJDOTNBI,  Location: BETWEEN RT 9 & RT 16 (Lat: 42.311311,  Lng: -71.276664),  Route carried "on" structure: City street ,  Year Built: 1932,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 9,827 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 22,742 (year 2031),  Design Load: H 20,  Features Intersected: RR CSX/MBTA,  Facility Carried by Structure: HWY CLIFF RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $2,074,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $3,112,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W13023BDHDOTNBI,  Location: RT 128 AT RT 9 (Lat: 42.316708,  Lng: -71.234019),  Route carried "on" structure: Interstate 95,  Year Built: 2018,  Status: Open,  Structure Length: 5.14m (16.86ft),  Average Daily Traffic: 192,397 (year 2016),  Truck Traffic: 6%,  Design Load: HL 93,  Features Intersected: ST 9 WORCESTER ST
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 58.900,  Lanes on structure: 8,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 47.1m (154.5ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 46.1m (151.2ft),  Out-to-Out Width: 47.1m (154.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W130142E9DOTNBI,  Location: RT 16 AT RT 9 (Lat: 42.316667,  Lng: -71.266667),  Route carried "under" structure: State highway 9,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: ST 16 WSHNGTN ST
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: W130142E9DOTNBI,  Location: RT 16 AT RT 9 (Lat: 42.316667,  Lng: -71.266667),  Route carried "under" structure: State highway 9,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: ST 16 WSHNGTN ST
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: W130152MHDOTNBI,  Location: 0.7 MI WLY RT 128 (Lat: 42.316667,  Lng: -71.250000),  Route carried "under" structure: State highway 9,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: HWY CEDAR ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: W130152MHDOTNBI,  Location: 0.7 MI WLY RT 128 (Lat: 42.316667,  Lng: -71.250000),  Route carried "under" structure: State highway 9,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: HWY CEDAR ST
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Discuss Wellesley, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.