Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Wayland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 151ft / 46.3mTotal length
  • $28,877,000Total costs
  • 58,859Total average daily traffic
  • 17,798Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Wayland
  • No street view available for this location

New bridges in Wayland, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 71960-1969
  • 81970-1979
  • 11990-1999
  • 12000-2009
Reconstructed bridges in Wayland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in Wayland, NY
Average Bridge Truck Traffic in Wayland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 30.0%Good
  • 40.0%Satisfactory
  • 10.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 60.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 50.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 71.4%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 1013021,  Location: JCT RTE 434 & SUSQUEHANNA (Lat: 42.092267,  Lng: -75.911342),  Route carried "on" structure: State highway 434,  Year Built: 1956,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 19.75m (64.80ft),  Average Daily Traffic: 9,929 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,505 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 363, SUSQUEHANNA RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.458,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 62.1m (203.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.75m (64.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $6,053,000,  Roadway Improvement Cost: $3,544,000,  Total Project Cost: $9,597,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101641,  Location: 3.0 MI E OF WAYLAND (Lat: 42.567203,  Lng: -77.536003),  Route carried "on" structure: State highway 21,  Year Built: 1940,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,633 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,643 (year 2040),  Design Load: HS 20,  Features Intersected: COHOCTON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.516,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $743,000,  Roadway Improvement Cost: $435,000,  Total Project Cost: $1,178,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1090711,  Location: 0.8 MI E JCT SR 21 & I390 (Lat: 42.539494,  Lng: -77.569000),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 5,546 (year 2013),  Truck Traffic: 37%,  Design Load: HS 20+Mod,  Features Intersected: YOCUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.940,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,381,000,  Roadway Improvement Cost: $809,000,  Total Project Cost: $2,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090712,  Location: .8 MI E JCT SR 21 & I390 (Lat: 42.539947,  Lng: -77.568975),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 4,759 (year 2019),  Truck Traffic: 31%,  Average Future Daily Traffic: 8,877 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: YOCUM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.052,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,442,000,  Roadway Improvement Cost: $845,000,  Total Project Cost: $2,287,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090721,  Location: JCT RTS 21 + I390 (Lat: 42.541769,  Lng: -77.592528),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 5,667 (year 2014),  Truck Traffic: 37%,  Design Load: HS 20+Mod,  Features Intersected: RTE 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.902,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.3m (115.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $995,000,  Total Project Cost: $2,695,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090722,  Location: JCT RTS 21 + I390 (Lat: 42.541997,  Lng: -77.592589),  Route carried "on" structure: Interstate 390,  Year Built: 1975,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 5,007 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 9,340 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.967,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.3m (115.8ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,708,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $2,708,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090731,  Location: 0.4 MI SW JCT SR21 + I390 (Lat: 42.540717,  Lng: -77.597817),  Route carried "on" structure: Interstate 390,  Year Built: 1966,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 5,667 (year 2014),  Truck Traffic: 37%,  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.369,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $418,000,  Total Project Cost: $1,133,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1090732,  Location: 0.4 MI SW JCT SR21 + I390 (Lat: 42.540919,  Lng: -77.598006),  Route carried "on" structure: Interstate 390,  Year Built: 1966,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 5,007 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 9,340 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.433,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $713,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,130,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1090741,  Location: S END OF PERKINSVILLE (Lat: 42.536094,  Lng: -77.622497),  Route carried "on" structure: Interstate 390,  Year Built: 1966,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 3.52m (11.55ft),  Average Daily Traffic: 5,667 (year 2014),  Truck Traffic: 37%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.493,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,246,000,  Roadway Improvement Cost: $729,000,  Total Project Cost: $1,975,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1090742,  Location: S END OF PERKINSVILLE (Lat: 42.536275,  Lng: -77.622792),  Route carried "on" structure: Interstate 390,  Year Built: 1966,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 3.52m (11.55ft),  Average Daily Traffic: 5,007 (year 2020),  Truck Traffic: 49%,  Average Future Daily Traffic: 9,340 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.541,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,227,000,  Roadway Improvement Cost: $719,000,  Total Project Cost: $1,945,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221756,  Location: 14 MI S WAYLAND (Lat: 42.541156,  Lng: -77.598228),  Route carried "on" structure: Alternate County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 832 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,165 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: MICHIGAN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $510,000,  Roadway Improvement Cost: $299,000,  Total Project Cost: $808,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33336,  Location: 2.9 M E OF WAYLAND (Lat: 42.573269,  Lng: -77.534156),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 284 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 398 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: COHOCTON RIVER,  Facility Carried by Structure: COUNTY ROAD 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $831,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33342,  Location: 2.5 MI S OF WAYLAND (Lat: 42.530636,  Lng: -77.589856),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 348 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 487 (year 2038),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY ROAD 90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.533,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Poor,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $401,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1090711,  Location: 0.8 MI E JCT SR 21 & I390 (Lat: 42.539494,  Lng: -77.569000),  Route carried "under" structure: Other road ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 79 (year 2020),  Truck Traffic: 5%,  Features Intersected: YOCUM ROAD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 5.599,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 1090712,  Location: .8 MI E JCT SR 21 & I390 (Lat: 42.539947,  Lng: -77.568975),  Route carried "under" structure: Other road ,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 79 (year 2020),  Truck Traffic: 5%,  Features Intersected: YOCUM ROAD,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 1090721,  Location: JCT RTS 21 + I390 (Lat: 42.541769,  Lng: -77.592528),  Route carried "under" structure: Alternate State highway 21,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 1977),  Features Intersected: RTE 21,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 38.873,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1090722,  Location: JCT RTS 21 + I390 (Lat: 42.541997,  Lng: -77.592589),  Route carried "under" structure: Alternate State highway 21,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 1977),  Features Intersected: RTE 21,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 38.873,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.3m (115.8ft)

Find on map >>   Show street view

Structure Number: 1090741,  Location: S END OF PERKINSVILLE (Lat: 42.536094,  Lng: -77.622497),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 174 (year 2018),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 90,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 3.025,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1090742,  Location: S END OF PERKINSVILLE (Lat: 42.536275,  Lng: -77.622792),  Route carried "under" structure: County highway ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 174 (year 2018),  Truck Traffic: 7%,  Features Intersected: COUNTY ROAD 90,  Facility Carried by Structure: RTE I390
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 3.620,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Discuss Wayland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.