Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Watertown, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 387ft / 118mTotal length
  • $59,246,000Total costs
  • 228,189Total average daily traffic
  • 13,317Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Watertown
  • No street view available for this location

New bridges in Watertown, NY - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11940-1949
  • 71950-1959
  • 11970-1979
  • 31980-1989
  • 71990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Watertown, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
Average Bridge Daily Traffic in Watertown, NY
Average Bridge Truck Traffic in Watertown, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.3%Excellent
  • 13.3%Very good
  • 26.7%Good
  • 26.7%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Excellent
  • 20.0%Very good
  • 46.7%Good
  • 13.3%Satisfactory
  • 6.7%Fair
  • 6.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.3%Excellent
  • 20.0%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 13.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.3%Excellent
  • 56.3%Very good
  • 6.3%Good
  • 18.8%Satisfactory
  • 12.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Excellent
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Find on map >>   Show street view

Structure Number: 100049,  Location: JCT RTE 3 + I-81 (Lat: 43.975747,  Lng: -75.948342),  Route carried "on" structure: State highway 3,  Year Built: 2008,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 19,685 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,777 (year 2040),  Design Load: HL 93,  Features Intersected: RTE I81, RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.918,  Lanes on structure: 7,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.1m (88.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 27.5m (90.2ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,760,000,  Roadway Improvement Cost: $2,202,000,  Total Project Cost: $5,962,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10005,  Location: .3 MI W JCT SH 3 & SH 12 (Lat: 43.976344,  Lng: -75.923175),  Route carried "on" structure: State highway 3,  Year Built: 2020,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 18,613 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 18,700 (year 2040),  Design Load: HL 93,  Features Intersected: EXCHANGE STREET, CSX Spu
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 48.946,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,187,000,  Roadway Improvement Cost: $1,866,000,  Total Project Cost: $5,054,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100967,  Location: 1 MILE SE JCT I81 & SH 12 (Lat: 43.990656,  Lng: -75.915528),  Route carried "on" structure: State highway 12,  Year Built: 1957,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 6,965 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,461 (year 2040),  Design Load: H 20,  Features Intersected: KELSEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.606,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $481,000,  Total Project Cost: $1,302,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101017,  Location: JCT OF RTE 12F & RTE I-81 (Lat: 43.988817,  Lng: -75.944272),  Route carried "on" structure: Business State highway 12F,  Year Built: 1993,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 14,199 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,248 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: RTE I81, RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.479,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.9m (117.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,955,000,  Roadway Improvement Cost: $1,145,000,  Total Project Cost: $3,100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103216,  Location: 1.5 MI S JCT I-81 + 3 (Lat: 43.953222,  Lng: -75.954894),  Route carried "on" structure: Interstate 81,  Year Built: 1957,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 15,952 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 20,817 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER MEADOW CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.644,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $927,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103217,  Location: 1 MILE S JCT I81 & SH 3 (Lat: 43.959822,  Lng: -75.951722),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 676 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 830 (year 2040),  Design Load: HS 20,  Features Intersected: RTE I81, RTE I81,  Facility Carried by Structure: COUNTY ROAD 63
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.929,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.06m (36.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,025,000,  Roadway Improvement Cost: $1,186,000,  Total Project Cost: $3,210,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032181,  Location: JCT RTE I-81 SB + BLACK R (Lat: 43.995831,  Lng: -75.933778),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 12,167 (year 2009),  Truck Traffic: 16%,  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.890,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.6m (93.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,849,000,  Roadway Improvement Cost: $1,669,000,  Total Project Cost: $4,518,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1032182,  Location: JCT RTE I-81 NB + BLACK R (Lat: 43.995656,  Lng: -75.933689),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 10.88m (35.70ft),  Average Daily Traffic: 10,843 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 14,150 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.890,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.6m (93.8ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.88m (35.70ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,844,000,  Roadway Improvement Cost: $1,665,000,  Total Project Cost: $4,509,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107448,  Location: WATERTOWN STATE&GIFFORD (Lat: 43.964753,  Lng: -75.875133),  Route carried "on" structure: State highway 12,  Year Built: 1990,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 8,632 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,672 (year 2040),  Design Load: HS 20,  Features Intersected: COLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.7m (18.7ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $663,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107449,  Location: WATERTOWN JCT STATE&HUNT (Lat: 43.965775,  Lng: -75.875756),  Route carried "on" structure: State highway 12,  Year Built: 1990,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,923 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,946 (year 2040),  Design Load: HS 20,  Features Intersected: COLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.232,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $358,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $568,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107987,  Location: 0.3 MI SOUTH RTE 232 Int. (Lat: 43.927408,  Lng: -75.940692),  Route carried "on" structure: US 11,  Year Built: 2017,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,204 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,964 (year 2040),  Design Load: HL 93,  Features Intersected: Mill Creek
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 32.019,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $478,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 222021,  Location: 0.5MI NW OF RTE11&BLACK R (Lat: 43.984661,  Lng: -75.925181),  Route carried "on" structure: ServiceCity street ,  Year Built: 1993,  Status: Open,  Structure Length: 11.80m (38.71ft),  Average Daily Traffic: 3,170 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,922 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER,  Facility Carried by Structure: VAN DUZEE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.1m (144.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.79m (38.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,368,000,  Roadway Improvement Cost: $1,386,000,  Total Project Cost: $3,754,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222022,  Location: IN WATERTOWN (Lat: 43.980547,  Lng: -75.914250),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 14.75m (48.39ft),  Average Daily Traffic: 15,947 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,021 (year 2040),  Design Load: HS 20,  Features Intersected: CITY CENTER DRIVE, BLACK,  Facility Carried by Structure: U.S. Route 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 74.6m (244.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.75m (48.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,649,000,  Roadway Improvement Cost: $3,308,000,  Total Project Cost: $8,956,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222023,  Location: IN WATERTOWN (Lat: 43.976033,  Lng: -75.907603),  Route carried "on" structure: US 11,  Year Built: 1928,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 6,848 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,880 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RI OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.584,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $978,000,  Roadway Improvement Cost: $573,000,  Total Project Cost: $1,551,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 222024,  Location: MILL ST RT11 WATERTOWN (Lat: 43.977181,  Lng: -75.907294),  Route carried "on" structure: US 11,  Year Built: 1989,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 6,848 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,880 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.729,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 15.6m (51.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,306,000,  Roadway Improvement Cost: $1,351,000,  Total Project Cost: $3,657,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222025,  Location: IN WATERTOWN (Lat: 43.978203,  Lng: -75.898272),  Route carried "on" structure: City street 283,  Year Built: 2004,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 7,137 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,670 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: S.BR. BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.5m (162.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,352,000,  Roadway Improvement Cost: $792,000,  Total Project Cost: $2,144,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222026,  Location: IN WATERTOWN (Lat: 43.979347,  Lng: -75.896592),  Route carried "on" structure: State highway 283,  Year Built: 1978,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 7,137 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,670 (year 2040),  Design Load: HS 20,  Features Intersected: N BR BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $720,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $1,142,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 222028,  Location: 0.7 MI NE INT RTS 12 & 3 (Lat: 43.975508,  Lng: -75.874056),  Route carried "on" structure: State highway 3,  Year Built: 1982,  Status: Open,  Structure Length: 17.53m (57.51ft),  Average Daily Traffic: 6,632 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,663 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK RIVER, POWER CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.628,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 60.0m (196.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.52m (57.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,657,000,  Roadway Improvement Cost: $2,727,000,  Total Project Cost: $7,384,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22593,  Location: IN WATERTOWN (Lat: 43.990814,  Lng: -75.921308),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 21 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 29 (year 2037),  Features Intersected: KELSEY CREEK,  Facility Carried by Structure: CAYUGA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $149,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333891,  Location: 3.0 MI S OF WATERTOWN (Lat: 43.908156,  Lng: -75.895350),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 317 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 444 (year 2037),  Features Intersected: N BR SANDY CREEK,  Facility Carried by Structure: LAWTON HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $218,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100049,  Location: JCT RTE 3 + I-81 (Lat: 43.975747,  Lng: -75.948342),  Route carried "under" structure: Interstate 81,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 11,900 (year 1979),  Features Intersected: RTE I81, RTE I81,  Facility Carried by Structure: RTE 3
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 36.203,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 101017,  Location: JCT OF RTE 12F & RTE I-81 (Lat: 43.988817,  Lng: -75.944272),  Route carried "under" structure: Interstate 81,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 18,887 (year 1999),  Features Intersected: RTE I81, RTE I81,  Facility Carried by Structure: RTE 12F
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 39.437,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.9m (117.8ft)

Find on map >>   Show street view

Structure Number: 103217,  Location: 1 MILE S JCT I81 & SH 3 (Lat: 43.959822,  Lng: -75.951722),  Route carried "under" structure: Interstate 81,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 21,337 (year 1999),  Features Intersected: RTE I81, RTE I81,  Facility Carried by Structure: COUNTY ROAD 63
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 34.352,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 222022,  Location: IN WATERTOWN (Lat: 43.980547,  Lng: -75.914250),  Route carried "under" structure: Bypass City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 49 (year 2021),  Features Intersected: CITY CENTER DRIVE, BLACK,  Facility Carried by Structure: U.S. Route 11
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 74.6m (244.8ft)

Find on map >>   Show street view

Structure Number: 771445,  Location: 1.5 M9 SW OF WATERTOWN (Lat: 43.965197,  Lng: -75.935264),  Route carried "under" structure: City street ,  Year Built: 1925,  Structure Length: 0. m,  Features Intersected: MASSEY STREET,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 771511,  Location: WATERTOWN OUTER W MAIN ST (Lat: 43.988294,  Lng: -75.923597),  Route carried "under" structure: Alternate State highway 12E,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 1981),  Features Intersected: RTE 12E,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.7m (31.8ft)

Discuss Watertown, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.