Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Walland, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 164ft / 50.4mTotal length
  • $2,077,000Total costs
  • 75,936Total average daily traffic
  • 6,941Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Walland
  • No street view available for this location

New bridges in Walland, TN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41950-1959
  • 31960-1969
  • 21970-1979
  • 61980-1989
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Walland, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 62.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 62.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.3%Very good
  • 86.7%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 77.8%Good
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 50A5270001,  Location: 5 M. NE. WALLAND. (Lat: 35.785933,  Lng: -83.767900),  Route carried "on" structure: County highway 654,  Year Built: 1982,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 288 (year 2040),  Features Intersected: MILLST0NE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.827,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A5360001,  Location: 4 M. NE. WALLAND. (Lat: 35.790850,  Lng: -83.796567),  Route carried "on" structure: County highway 536,  Year Built: 1987,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: ELLEJOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A5380001,  Location: 4 M. NE. WALLAND. (Lat: 35.787517,  Lng: -83.800833),  Route carried "on" structure: County highway 538,  Year Built: 1984,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 310 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 496 (year 2040),  Design Load: HS 20,  Features Intersected: ELLEJOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.671,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021
Find on map >>   Show street view

Structure Number: 50A5450001,  Location: 3 M. N. WALLAND. (Lat: 35.772067,  Lng: -83.815567),  Route carried "on" structure: County highway 545,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.96m (6.43ft),  Average Daily Traffic: 100 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 160 (year 2042),  Design Load: H 10,  Features Intersected: ELLEJOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.883,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.96m (6.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $325,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A5510001,  Location: 1 M. NW. WALLAND. (Lat: 35.747450,  Lng: -83.833117),  Route carried "on" structure: County highway 2395,  Year Built: 2000,  Status: Open,  Structure Length: 7.20m (23.62ft),  Average Daily Traffic: 1,588 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,541 (year 2042),  Design Load: HS 20,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.566,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2021,  Underwater Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A5530001,  Location: OLD WALLAND HWY @ WALLAND (Lat: 35.730350,  Lng: -83.816417),  Route carried "on" structure: County highway 553,  Year Built: 1970,  Status: Open,  Structure Length: 9.05m (29.69ft),  Average Daily Traffic: 1,790 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,864 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.068,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 50A5530003,  Location: 0.5 M. SE. WALLAND. (Lat: 35.727717,  Lng: -83.813317),  Route carried "on" structure: County highway 553,  Year Built: 2005,  Status: Open,  Structure Length: 2.48m (8.14ft),  Average Daily Traffic: 2,540 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,064 (year 2039),  Design Load: HS 20,  Features Intersected: REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.454,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.3m (27.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A5540001,  Location: 1.5 M. E. WALLAND. (Lat: 35.738167,  Lng: -83.788017),  Route carried "on" structure: County highway 554,  Year Built: 2003,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 280 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 448 (year 2040),  Design Load: HS 20,  Features Intersected: REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.074,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 34.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A5540003,  Location: 2 M. E. WALLAND. (Lat: 35.739667,  Lng: -83.783567),  Route carried "on" structure: County highway 554,  Year Built: 2015,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 280 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 448 (year 2039),  Design Load: HL 93,  Features Intersected: REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.518,  Lanes on structure: 20,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 5 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A5540005,  Location: 3 M. E. WALLAND. (Lat: 35.743083,  Lng: -83.766500),  Route carried "on" structure: County highway 554,  Year Built: 1984,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 280 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 448 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: REED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.391,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $95,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5SR0730017,  Location: 2 M E OF COOL SPRINGS (Lat: 35.750833,  Lng: -83.841083),  Route carried "on" structure: US 321,  Year Built: 1953,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 11,147 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 17,835 (year 2042),  Design Load: HS 20,  Features Intersected: ROCKY BRANCH,  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 5SR0730019,  Location: 1.8 M NE OF COOL SPRINGS (Lat: 35.742517,  Lng: -83.831383),  Route carried "on" structure: US 321,  Year Built: 1953,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 9,470 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,152 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.654,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.4m (70.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $361,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5SR0730021,  Location: 1.8 TO END OF NPS RTE 8 (Lat: 35.718400,  Lng: -83.820133),  Route carried "on" structure: US 321,  Year Built: 1987,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 9,470 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,152 (year 2042),  Design Load: HS 20,  Features Intersected: FOOTHILLS PKWY (A820),  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.049,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5SR0730022,  Location: 1.8 TO END OF NPS RTE 8 (Lat: 35.718433,  Lng: -83.819883),  Route carried "on" structure: US 321,  Year Built: 1968,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 9,470 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,152 (year 2042),  Design Load: HS 20,  Features Intersected: FOOTHILLS PKWY (A820),  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.082,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5SR0730023,  Location: .9 M SW OF FOOTHILLS MTS (Lat: 35.712433,  Lng: -83.819467),  Route carried "on" structure: US 321,  Year Built: 1954,  Status: Open,  Structure Length: 4.34m (14.24ft),  Average Daily Traffic: 9,470 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,152 (year 2042),  Design Load: HS 20,  Features Intersected: HESSEE CREEK,  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.758,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 58.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.34m (14.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $542,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5SR0730025,  Location: 2.5 M W OF FOOTHILLS MTS (Lat: 35.697583,  Lng: -83.808400),  Route carried "on" structure: US 321,  Year Built: 1953,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 9,470 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,152 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 73
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.268,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.72m (2.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $341,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5460030P,  Location: 0.1 MI TO U.S. ROUTE 321. (Lat: 35.716944,  Lng: -83.817944),  Route carried "on" structure: Federal lands road ,  Year Built: 1966,  Status: Open,  Structure Length: 9.18m (30.12ft),  Average Daily Traffic: 1 (year 2010),  Average Future Daily Traffic: 2 (year 2030),  Design Load: H 15,  Features Intersected: LITTLE RIVER & WALLAND H,  Facility Carried by Structure: FOOTHILLS PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.680,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.0m (88.6ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $225,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 50A8200007,  Location: 1 M. S. WALLAND (Lat: 35.717000,  Lng: -83.818333),  Route carried "under" structure: County highway 553,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,540 (year 2022),  Truck Traffic: 2%,  Features Intersected: FOOTHILLS PARKWAY
Minimum Vertical Clearance: 10.19m (33.43ft),  Kilometerpoint: 2.087,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 5SR0730021,  Location: 1.8 TO END OF NPS RTE 8 (Lat: 35.718400,  Lng: -83.820133),  Route carried "under" structure: Federal lands road 820,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 3,750 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 73
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 27.230,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 5SR0730022,  Location: 1.8 TO END OF NPS RTE 8 (Lat: 35.718433,  Lng: -83.819883),  Route carried "under" structure: Federal lands road 820,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 3,750 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 73
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 27.262,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Discuss Walland, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.