Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Waitsfield, Vermont (VT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 92ft / 28.0mTotal length
  • $5,680,000Total costs
  • 31,540Total average daily traffic
  • 2,324Total average daily truck traffic
  • 33,118Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Waitsfield
  • No street view available for this location

New bridges in Waitsfield, VT - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 11910-1919
  • 31930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 11980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Waitsfield, VT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 21970-1979
  • 01980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Waitsfield, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 16.7%Good
  • 50.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 8.3%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 101216000412161,  Location: 0.08 MI TO JCT W VT100 (Lat: 44.189397,  Lng: -72.823486),  Route carried "on" structure: Other road C2001,  Year Built: 1833,  Year Reconstructed: 1973,  Status: Posted for load,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 1,900 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,995 (year 2029),  Design Load: H 10,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 3.22m (10.56ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 4.05m (13.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $656,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $806,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 101216002012161,  Location: 0.15 MI TO JCT W C3 TH15 (Lat: 44.205672,  Lng: -72.792058),  Route carried "on" structure: Other road C2003,  Year Built: 1872,  Year Reconstructed: 1977,  Status: Posted for load,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 263 (year 2029),  Design Load: H 20,  Features Intersected: PINE BROOK
Minimum Vertical Clearance: 3.32m (10.89ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $341,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $491,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101216002112161,  Location: 0.10 MI E TO JCT W TH16 (Lat: 44.189397,  Lng: -72.823486),  Route carried "on" structure: Other road C3010,  Year Built: 1919,  Year Reconstructed: 2011,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: PINE BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $410,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101216002212161,  Location: 0.1 MI TO JCT W VT100 (Lat: 44.151392,  Lng: -72.839867),  Route carried "on" structure: Other road C3029,  Year Built: 1999,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 180 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 189 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $380,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101216002412161,  Location: 0.1 MI TO JCT W VT100 (Lat: 44.220233,  Lng: -72.789092),  Route carried "on" structure: Other road C3008,  Year Built: 1955,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 315 (year 2029),  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $620,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 101216002512161,  Location: 0.1 MI TO JCT W VT100 (Lat: 44.204222,  Lng: -72.807089),  Route carried "on" structure: Other road C3015,  Year Built: 1983,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 840 (year 2029),  Design Load: HS 20,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200013017712162,  Location: 0.8 MI S JCT. VT.17 (Lat: 44.173078,  Lng: -72.832725),  Route carried "on" structure: State highway 100,  Year Built: 2016,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 5,500 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,775 (year 2028),  Design Load: HL 93,  Features Intersected: MAD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.770,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2300001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.4m (171.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200013017812162,  Location: 0.3 MI S JCT. VT.17 (Lat: 44.178386,  Lng: -72.836217),  Route carried "on" structure: State highway 100,  Year Built: 1938,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 5,500 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,775 (year 2028),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.446,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2300001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $785,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $835,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200013018112162,  Location: 2.5 MI N JCT. VT.17 (Lat: 44.204233,  Lng: -72.808947),  Route carried "on" structure: State highway 100,  Year Built: 1940,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 6,400 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,720 (year 2028),  Design Load: H 15,  Features Intersected: BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 212.549,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2300001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $609,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200013018612162,  Location: 0.9 MI S JCT. VT.100B (Lat: 44.228803,  Lng: -72.783997),  Route carried "on" structure: State highway 100,  Year Built: 1938,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 6,400 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,720 (year 2028),  Design Load: H 15,  Features Intersected: SHEPARD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 216.105,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 2300001,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $853,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $903,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200200001301032,  Location: 1.0 MI E JCT. VT.116 N (Lat: 44.161233,  Lng: -73.030086),  Route carried "on" structure: State highway 17,  Year Built: 1964,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,575 (year 2028),  Design Load: H 20,  Features Intersected: BALDWIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200200003812162,  Location: 0.1 MI W JCT. VT.100 (Lat: 44.180775,  Lng: -72.842533),  Route carried "on" structure: State highway 17,  Year Built: 1939,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 2,800 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,940 (year 2028),  Design Load: H 15,  Features Intersected: MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $576,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $626,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Discuss Waitsfield, Vermont (VT) on our hugely popular Vermont forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.