Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Valencia West, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 184ft / 56.3mTotal length
  • $5,000Total costs
  • 192,617Total average daily traffic
  • 13,309Total average daily truck traffic
  • 196,202Total future (year 2019) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Valencia West
  • No street view available for this location

New bridges in Valencia West, AZ - historical statistics
  • New bridges - historical statistics
  • 51970-1979
  • 11980-1989
  • 31990-1999
  • 62000-2009
  • 152010-2019
Average Bridge Daily Traffic in Valencia West, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 50.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Excellent
  • 3.3%Very good
  • 26.7%Good
  • 3.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 65.4%Very good
  • 34.6%Good
Find on map >>   Show street view

Structure Number: 1606,  Location: 10.4 mi West of Jct US 89 (Lat: 32.145800,  Lng: -111.135700),  Route carried "on" structure: State highway 86,  Year Built: 1972,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 3,772 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,782 (year 2039),  Design Load: HS 20,  Features Intersected: Black Hills Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.794,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1607,  Location: 9.4 mi West of Jct 19 (Lat: 32.147222,  Lng: -111.132500),  Route carried "on" structure: State highway 86,  Year Built: 1972,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 3,134 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,144 (year 2039),  Design Load: HS 20,  Features Intersected: Snyder Hill Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 261.036,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6464,  Location: 10.1 mi E Jct SR 286 (Lat: 32.138561,  Lng: -111.157678),  Route carried "on" structure: State highway 86,  Year Built: 1972,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 7,544 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,649 (year 2040),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 258.622,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Total Project Cost: $1,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 6465,  Location: 9.9 mi W Jct I-19 (Lat: 32.142022,  Lng: -111.146108),  Route carried "on" structure: State highway 86,  Year Built: 1972,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,544 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,649 (year 2040),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 259.507,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Total Project Cost: $1,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 6466,  Location: 9.6 mi W Jct I-19 (Lat: 32.143644,  Lng: -111.141053),  Route carried "on" structure: State highway 86,  Year Built: 1972,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7,544 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,649 (year 2040),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.311,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Total Project Cost: $1,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 6943,  Location: 8.4 mi NE Jct SR 286 (Lat: 32.129700,  Lng: -111.184100),  Route carried "on" structure: State highway 86,  Year Built: 1992,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 7,120 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,130 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 255.860,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018
Find on map >>   Show street view

Structure Number: 6944,  Location: 8.8 mi NE Jct SR 286 (Lat: 32.132400,  Lng: -111.177000),  Route carried "on" structure: State highway 86,  Year Built: 1992,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,120 (year 2016),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,130 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 256.600,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 38.4m (126.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 6945,  Location: 9.6 mi NE Jct SR 286 (Lat: 32.136200,  Lng: -111.164300),  Route carried "on" structure: State highway 86,  Year Built: 1992,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 6,974 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,984 (year 2038),  Design Load: HS 20,  Features Intersected: Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 257.860,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018,  Bridge Improvement Cost: $1,000,  Total Project Cost: $1,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 11414,  Location: 800' N of W Valencia Rd (Lat: 32.135658,  Lng: -111.106019),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,010 (year 2040),  Design Load: HS 20,  Features Intersected: Black Wash,  Facility Carried by Structure: Camino Verde
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 1159,  Location: W of Vahalla Rd (Lat: 32.137500,  Lng: -111.133889),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Freedom Egal Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.2m (3.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11591,  Location: N of W Valencia Rd (Lat: 32.133889,  Lng: -111.143056),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 410 (year 2039),  Design Load: HS 20,  Features Intersected: Large Wash,  Facility Carried by Structure: Bullfinch Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11592,  Location: E of Star Diamond (Lat: 32.133333,  Lng: -111.119722),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11593,  Location: E of Wade Rd (Lat: 32.133333,  Lng: -111.114167),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11594,  Location: E of Camino Verde (Lat: 32.133333,  Lng: -111.100556),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 16,170 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,180 (year 2039),  Design Load: HS 20,  Features Intersected: Black Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11595,  Location: E of Viviyana Rd (Lat: 32.133333,  Lng: -111.096111),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 16,170 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,180 (year 2039),  Design Load: HS 20,  Features Intersected: Large Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11597,  Location: E of S Vahallla lane (Lat: 32.128889,  Lng: -111.131667),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 410 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Tight Line Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 116,  Location: S of Sandpaper Tree Wy (Lat: 32.149722,  Lng: -111.101389),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Lemon Tree Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11603,  Location: E of Wade Rd (Lat: 32.125000,  Lng: -111.114167),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,000 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,010 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Brightwater Way
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11604,  Location: S of Valencia Rd (Lat: 32.131667,  Lng: -111.123333),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Victor Dr
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11616,  Location: 0.4 m S junc of SR86 (Lat: 32.133056,  Lng: -111.163611),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11617,  Location: 0.75 mi SE fr Junc SR86 (Lat: 32.133056,  Lng: -111.158333),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11618,  Location: 1 mi SE fr Junc SR86 (Lat: 32.133056,  Lng: -111.153056),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2019),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11619,  Location: 1.2 mi SE fr Junc SR86 (Lat: 32.133056,  Lng: -111.150000),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 1162,  Location: 1.60 mi SE fr SR86 (Lat: 32.133333,  Lng: -111.141111),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11621,  Location: E of Mountain Eagle Dr (Lat: 32.133333,  Lng: -111.139167),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11622,  Location: 1.8 mi SE fr SR86 (Lat: 32.133056,  Lng: -111.138889),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.2m (3.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11623,  Location: 2 mi SE fr SR86 (Lat: 32.133333,  Lng: -111.135556),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 11624,  Location: E of S Vahalla Rd (Lat: 32.133056,  Lng: -111.137778),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 8,871 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,881 (year 2039),  Design Load: HS 20,  Features Intersected: Small Wash,  Facility Carried by Structure: Valencia Rd
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019
Find on map >>   Show street view

Structure Number: 20073,  Location: 9.5 mi W of Junc 19 (Lat: 32.145800,  Lng: -111.136000),  Route carried "on" structure: State highway 86,  Year Built: 2017,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 3,772 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,782 (year 2039),  Design Load: HL 93,  Features Intersected: Black Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 260.714,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20074,  Location: 9.4 mi W of Junc 19 (Lat: 32.147200,  Lng: -111.132800),  Route carried "on" structure: State highway 86,  Year Built: 2017,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 3,772 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,782 (year 2039),  Design Load: HL 93,  Features Intersected: Snyder Hill Wash
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 261.036,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Valencia West, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.