Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Uniondale, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 82ft / 25.1mTotal length
  • $58,738,000Total costs
  • 1,339,683Total average daily traffic
  • 4,582Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Uniondale
  • No street view available for this location

New bridges in Uniondale, NY - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 101950-1959
  • 21970-1979
Average Bridge Daily Traffic in Uniondale, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 62.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1059249,  Location: AT EAST MEADOW-N OF SSP (Lat: 40.712264,  Lng: -73.579950),  Route carried "on" structure: State highway 908E,  Year Built: 1954,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 107,132 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 127,433 (year 2040),  Design Load: H 20,  Features Intersected: RTE 102
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.516,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,273,000,  Roadway Improvement Cost: $3,088,000,  Total Project Cost: $8,361,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1059521,  Location: 4.1 MI W JCT SSP + WSP (Lat: 40.686267,  Lng: -73.596819),  Route carried "on" structure: State highway 908M,  Year Built: 1956,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 72,533 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 86,278 (year 2040),  Design Load: HS 20,  Features Intersected: BROOKSIDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.987,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,098,000,  Roadway Improvement Cost: $1,229,000,  Total Project Cost: $3,327,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1059522,  Location: 4.1 MI W JCT SSP & WSP (Lat: 40.686061,  Lng: -73.596881),  Route carried "on" structure: State highway 908M,  Year Built: 1930,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 72,533 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 86,278 (year 2040),  Design Load: H 20,  Features Intersected: BROOKSIDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.987,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,327,000,  Roadway Improvement Cost: $1,363,000,  Total Project Cost: $3,689,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105954,  Location: 4 MI W JCT SSP + WSP (Lat: 40.686681,  Lng: -73.594247),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 22,778 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,670 (year 2040),  Features Intersected: RTE 908M,  Facility Carried by Structure: NASSAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.846,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,303,000,  Roadway Improvement Cost: $1,934,000,  Total Project Cost: $5,238,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105955,  Location: 3.8 MI W JCT SSP & WSP (Lat: 40.688817,  Lng: -73.590950),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 6,400 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,918 (year 2040),  Features Intersected: RTE 908M,  Facility Carried by Structure: PARK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.158,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,354,000,  Roadway Improvement Cost: $1,379,000,  Total Project Cost: $3,733,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 152026,  Location: 4 MI W JCT SSP + WSP (Lat: 40.686903,  Lng: -73.594483),  Route carried "on" structure: County highway ,  Year Built: 1956,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 22,778 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 27,670 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: NASSAU ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.878,  Lanes on structure: 4,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,207,000,  Roadway Improvement Cost: $2,463,000,  Total Project Cost: $6,670,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 152027,  Location: 3.8 MI W JCT SSP & WSP (Lat: 40.689047,  Lng: -73.591189),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 6,400 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,918 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: PARK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,985,000,  Roadway Improvement Cost: $1,748,000,  Total Project Cost: $4,734,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 3360559,  Location: 2.0 MI E OF HEMPSTEAD (Lat: 40.718297,  Lng: -73.580478),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 9.57m (31.40ft),  Average Daily Traffic: 8,799 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,689 (year 2040),  Features Intersected: 908E908E03011088, RTE 90,  Facility Carried by Structure: GLEN CURTISS BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.660,  Lanes on structure: 6,  Lanes under structure: 7,  Owner: County Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.57m (31.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $14,497,000,  Roadway Improvement Cost: $8,489,000,  Total Project Cost: $22,986,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1059249,  Location: AT EAST MEADOW-N OF SSP (Lat: 40.712264,  Lng: -73.579950),  Route carried "under" structure: State highway 102,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 14,072 (year 2002),  Features Intersected: RTE 102,  Facility Carried by Structure: RTE 908E
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 5.149,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 105925,  Location: AT EAST MEADOW-N OF SSP (Lat: 40.717092,  Lng: -73.580517),  Route carried "under" structure: State highway 908E,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 138,338 (year 2002),  Features Intersected: 908E908E03011087, N/B, R,  Facility Carried by Structure: AIR BASE ROAD
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 13.886,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 105925,  Location: AT EAST MEADOW-N OF SSP (Lat: 40.717092,  Lng: -73.580517),  Route carried "under" structure: State highway ,  Year Built: 1955,  Structure Length: 0. m,  Features Intersected: 908E908E03011087, N/B, R,  Facility Carried by Structure: AIR BASE ROAD
Minimum Vertical Clearance: 3.86m (12.66ft),  Kilometerpoint: 13.886,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 1059521,  Location: 4.1 MI W JCT SSP + WSP (Lat: 40.686267,  Lng: -73.596819),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 11,589 (year 2001),  Features Intersected: BROOKSIDE AVENUE,  Facility Carried by Structure: RTE 908M
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 1059522,  Location: 4.1 MI W JCT SSP & WSP (Lat: 40.686061,  Lng: -73.596881),  Route carried "under" structure: County highway ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 11,589 (year 2001),  Features Intersected: BROOKSIDE AVENUE,  Facility Carried by Structure: RTE 908M
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 105954,  Location: 4 MI W JCT SSP + WSP (Lat: 40.686681,  Lng: -73.594247),  Route carried "under" structure: State highway 908M,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 176,601 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: NASSAU ROAD
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 12.277,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 105955,  Location: 3.8 MI W JCT SSP & WSP (Lat: 40.688817,  Lng: -73.590950),  Route carried "under" structure: State highway 908M,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 176,601 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: PARK AVENUE
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 12.647,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 152026,  Location: 4 MI W JCT SSP + WSP (Lat: 40.686903,  Lng: -73.594483),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 176,601 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: NASSAU ROAD
Minimum Vertical Clearance: 3.94m (12.93ft),  Kilometerpoint: 12.277,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 152027,  Location: 3.8 MI W JCT SSP & WSP (Lat: 40.689047,  Lng: -73.591189),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 176,601 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: PARK AVENUE
Minimum Vertical Clearance: 4.01m (13.16ft),  Kilometerpoint: 12.647,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 3360559,  Location: 2.0 MI E OF HEMPSTEAD (Lat: 40.718297,  Lng: -73.580478),  Route carried "under" structure: State highway 908E,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 138,338 (year 2002),  Features Intersected: 908E908E03011088, RTE 90,  Facility Carried by Structure: GLEN CURTISS BLVD
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 14.063,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Discuss Uniondale, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.