Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tyler Run-Queens Gate, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 95ft / 28.5mTotal length
  • $3,937,000Total costs
  • 207,417Total average daily traffic
  • 25,809Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tyler Run-Queens Gate
  • No street view available for this location

New bridges in Tyler Run-Queens Gate, PA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 31950-1959
  • 72000-2009
Average Bridge Daily Traffic in Tyler Run-Queens Gate, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Fair
  • 50.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 37388,  Location: PA 74 OVER I-83 (Lat: 39.932739,  Lng: -76.689525),  Route carried "on" structure: State highway 74,  Year Built: 1959,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 12,458 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 22,914 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0083
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.060,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.9m (78.4ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $859,000,  Total Project Cost: $3,937,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 38046,  Location: 2 S YORK CITY/TYLER RUN (Lat: 39.924311,  Lng: -76.700592),  Route carried "on" structure: City street ,  Year Built: 1949,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,610 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,288 (year 2032),  Features Intersected: TYLER RUN,  Facility Carried by Structure: POWDER MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 38047,  Location: 2 S YRK CITY/TYLER RUN (Lat: 39.928769,  Lng: -76.704894),  Route carried "on" structure: City street ,  Year Built: 1948,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,610 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,288 (year 2032),  Features Intersected: TYLER RUN,  Facility Carried by Structure: POWDER MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43587,  Location: SOUTH SIDE YORK CITY (Lat: 39.921667,  Lng: -76.699181),  Route carried "on" structure: State highway ,  Year Built: 2006,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 4,414 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,342 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: POWDER MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43588,  Location: 0.5 MI. N. OF SR 182 (Lat: 39.920389,  Lng: -76.705289),  Route carried "on" structure: Ramp State highway ,  Year Built: 2006,  Status: Open,  Structure Length: 17.40m (57.09ft),  Average Daily Traffic: 2,703 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,604 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: I-83-RAMP F BUS. I83 SB,  Facility Carried by Structure: RAMP F I-83;SR0083
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 68.9m (226.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 37388,  Location: PA 74 OVER I-83 (Lat: 39.932739,  Lng: -76.689525),  Route carried "under" structure: Interstate 83,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 33,995 (year 2022),  Truck Traffic: 11%,  Features Intersected: SR 0083,  Facility Carried by Structure: PA 74; Queen St.
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 24.975,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 37388,  Location: PA 74 OVER I-83 (Lat: 39.932739,  Lng: -76.689525),  Route carried "under" structure: Interstate 83,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 34,592 (year 2022),  Truck Traffic: 15%,  Features Intersected: SR 0083,  Facility Carried by Structure: PA 74; Queen St.
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 24.940,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 43587,  Location: SOUTH SIDE YORK CITY (Lat: 39.921667,  Lng: -76.699181),  Route carried "under" structure: Interstate 83,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 29,475 (year 2022),  Truck Traffic: 14%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: POWDER MILL RD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 23.326,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 43587,  Location: SOUTH SIDE YORK CITY (Lat: 39.921667,  Lng: -76.699181),  Route carried "under" structure: Interstate 83,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 24,654 (year 2022),  Truck Traffic: 15%,  Features Intersected: I-83; SR 0083,  Facility Carried by Structure: POWDER MILL RD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 23.364,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 43588,  Location: 0.5 MI. N. OF SR 182 (Lat: 39.920389,  Lng: -76.705289),  Route carried "under" structure: Interstate 83,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 29,475 (year 2022),  Truck Traffic: 14%,  Features Intersected: I-83-RAMP F BUS. I83 SB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 22.523,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 68.9m (226.0ft)

Find on map >>   Show street view

Structure Number: 43588,  Location: 0.5 MI. N. OF SR 182 (Lat: 39.920389,  Lng: -76.705289),  Route carried "under" structure: Interstate 83,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 24,654 (year 2022),  Truck Traffic: 15%,  Features Intersected: I-83-RAMP F BUS. I83 SB
Minimum Vertical Clearance: 12.67m (41.57ft),  Kilometerpoint: 22.528,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 68.9m (226.0ft)

Find on map >>   Show street view

Structure Number: 43588,  Location: 0.5 MI. N. OF SR 182 (Lat: 39.920389,  Lng: -76.705289),  Route carried "under" structure: Ramp State highway ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 1,777 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-83-RAMP F BUS. I83 SB,  Facility Carried by Structure: RAMP F I-83;SR0083
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 68.9m (226.0ft)

Discuss Tyler Run-Queens Gate, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.