  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 341ft / 104mTotal length
  • $21,398,000Total costs
  • 301,760Total average daily traffic
  • 16,344Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Trenton
  • No street view available for this location

New bridges in Trenton, GA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41930-1939
  • 31940-1949
  • 21950-1959
  • 151960-1969
  • 31970-1979
  • 31980-1989
Reconstructed bridges in Trenton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Trenton, GA
Average Bridge Truck Traffic in Trenton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 31.6%Good
  • 47.4%Satisfactory
  • 21.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.5%Very good
  • 42.1%Good
  • 47.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 68.4%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 77.3%Very good
  • 22.7%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 75.0%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 830001,  Location: 4 MI SW OF TRENTON (Lat: 34.814078,  Lng: -85.545719),  Route carried "on" structure: County highway 55,  Year Built: 1969,  Status: Open,  Structure Length: 7.99m (26.21ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: I-59 (SR 406),  Facility Carried by Structure: BYRDS CHAPEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,024,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,536,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830005,  Location: 4.5 MI SW OF TRENTON (Lat: 34.808819,  Lng: -85.542100),  Route carried "on" structure: US 11,  Year Built: 1921,  Year Reconstructed: 1939,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 1,320 (year 2012),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,980 (year 2032),  Design Load: H 15,  Features Intersected: CRAWFISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.36m (30.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830006,  Location: IN TRENTON (Lat: 34.870378,  Lng: -85.510339),  Route carried "on" structure: US 11,  Year Built: 1938,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 11,340 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,010 (year 2032),  Design Load: H 15,  Features Intersected: TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $418,000
Find on map >>   Show street view

Structure Number: 830007,  Location: IN NEW ENGLAND (Lat: 34.917189,  Lng: -85.475928),  Route carried "on" structure: US 11,  Year Built: 1936,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,400 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,600 (year 2032),  Design Load: H 15,  Features Intersected: SQUIRREL TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830009,  Location: 3 MI SW OF TRENTON (Lat: 34.831619,  Lng: -85.535419),  Route carried "on" structure: County highway 104,  Year Built: 1969,  Status: Posted for load,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: I-59 (SR 406),  Facility Carried by Structure: DANIELS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,039,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,559,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830011,  Location: 3.5 MI W OF TRENTON (Lat: 34.865158,  Lng: -85.574458),  Route carried "on" structure: State highway 136,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,780 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,670 (year 2032),  Design Load: H 15,  Features Intersected: BIG HIGDON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 830012,  Location: IN TRENTON (Lat: 34.869589,  Lng: -85.515978),  Route carried "on" structure: State highway 136,  Year Built: 1967,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 13,880 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,820 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-59 (SR 406)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 22.1m (72.5ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,939,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,909,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830013,  Location: IN E SIDE OF TRENTON (Lat: 34.865497,  Lng: -85.509489),  Route carried "on" structure: State highway 136,  Year Built: 1942,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 7,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,815 (year 2032),  Design Load: H 15,  Features Intersected: NORSOUTHERN RR (725782V)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $879,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,319,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830014,  Location: @ E CITY LIMIT OF TRENTON (Lat: 34.862850,  Lng: -85.500619),  Route carried "on" structure: State highway 136,  Year Built: 1940,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 7,210 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,815 (year 2032),  Design Load: H 15,  Features Intersected: LOOKOUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $821,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830015,  Location: 4 MI SE OF TRENTON (Lat: 34.816239,  Lng: -85.491119),  Route carried "on" structure: State highway 136,  Year Built: 1939,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,550 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,825 (year 2032),  Design Load: H 15,  Features Intersected: DANIEL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 830018,  Location: IN N SIDE OF NEW ENGLAND (Lat: 34.922439,  Lng: -85.481869),  Route carried "on" structure: County highway 186,  Year Built: 1967,  Status: Open,  Structure Length: 10.73m (35.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-59 (SR 406),  Facility Carried by Structure: OLD HALE GAP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 32.6m (107.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,375,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $2,063,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830019,  Location: 4 MI SE OF TRENTON (Lat: 34.828239,  Lng: -85.459350),  Route carried "on" structure: State highway 189,  Year Built: 1936,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 660 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 990 (year 2032),  Design Load: H 15,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 830023,  Location: 3.8 MI SW OF TRENTON (Lat: 34.811689,  Lng: -85.546939),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 12,920 (year 2012),  Truck Traffic: 32%,  Average Future Daily Traffic: 19,380 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CRAWFISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $756,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830024,  Location: 3.8 MI SW OF TRENTON (Lat: 34.811689,  Lng: -85.547278),  Route carried "on" structure: Interstate 59,  Year Built: 1969,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 12,920 (year 2012),  Truck Traffic: 32%,  Average Future Daily Traffic: 19,380 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CRAWFISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $774,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830025,  Location: IN NORTH TRENTON (Lat: 34.888758,  Lng: -85.503569),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 141 LAKE HILLS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $651,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830026,  Location: IN NORTH TRENTON (Lat: 34.888919,  Lng: -85.503789),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 141 LAKE HILLS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.921,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $434,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $651,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830027,  Location: IN NEW ENGLAND (Lat: 34.906678,  Lng: -85.489319),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 271 HICKS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830028,  Location: IN NEW ENGLAND (Lat: 34.906839,  Lng: -85.489539),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CR 271 HICKS HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $375,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $563,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830029,  Location: 1.5 MI N OF NEW ENGLAND (Lat: 34.929389,  Lng: -85.483969),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SQUIRREL TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 83003,  Location: 1.5 MI N OF NEW ENGLAND (Lat: 34.929269,  Lng: -85.483647),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SQUIRREL TOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $703,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 830031,  Location: 2 MI N OF NEW ENGLAND (Lat: 34.935728,  Lng: -85.482989),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DRY WASH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 830032,  Location: 2 MI N OF NEW ENGLAND (Lat: 34.936639,  Lng: -85.483147),  Route carried "on" structure: Interstate 59,  Year Built: 1967,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 18,660 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 27,990 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DRY WASH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $86,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $129,000
Find on map >>   Show street view

Structure Number: 830046,  Location: 1.5 MI E OF TRENTON (Lat: 34.870358,  Lng: -85.489997),  Route carried "on" structure: County highway 201,  Year Built: 1981,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 1,100 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2032),  Features Intersected: SITTON GULCH (DRY WASH),  Facility Carried by Structure: PINEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 830047,  Location: 1.6 MI E OF TRENTON (Lat: 34.871458,  Lng: -85.488419),  Route carried "on" structure: County highway 201,  Year Built: 1953,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,100 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2032),  Design Load: H 15,  Features Intersected: SITTON GULCH CREEK TRIB.,  Facility Carried by Structure: PINEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 830048,  Location: 1.8 MI E OF TRENTON (Lat: 34.873578,  Lng: -85.484628),  Route carried "on" structure: County highway 201,  Year Built: 1953,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,100 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2032),  Design Load: H 15,  Features Intersected: JACK BRANCH,  Facility Carried by Structure: PINEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 830052,  Location: IN CLOUDLAND CANYON S.PK. (Lat: 34.824500,  Lng: -85.490669),  Route carried "on" structure: County highway 229,  Year Built: 1984,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: DANIEL CREEK,  Facility Carried by Structure: STATE PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 835019,  Location: 4.6 MI SW OF TRENTON (Lat: 34.811678,  Lng: -85.547819),  Route carried "on" structure: County highway 183,  Year Built: 1969,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 15,  Features Intersected: CRAWFISH CREEK,  Facility Carried by Structure: BYRDS CHAPEL DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $445,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $668,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 835022,  Location: 1.4 MI SE OF NEW ENGLAND (Lat: 34.896989,  Lng: -85.463558),  Route carried "on" structure: County highway 201,  Year Built: 1988,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LOOKOUT CREEK,  Facility Carried by Structure: CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $781,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,172,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 835023,  Location: IN NEW ENGLAND (Lat: 34.910628,  Lng: -85.473650),  Route carried "on" structure: County highway 201,  Year Built: 1979,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SQUIRREL TOWN CREEK,  Facility Carried by Structure: NEW ENGLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $281,000
Find on map >>   Show street view

Structure Number: 835024,  Location: IN SE TRENTON (Lat: 34.867150,  Lng: -85.508378),  Route carried "on" structure: City street 564,  Year Built: 1978,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: SUNSET DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 835025,  Location: IN S TRENTON (Lat: 34.869358,  Lng: -85.510739),  Route carried "on" structure: City street 568,  Year Built: 1978,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: TOWN CREEK,  Facility Carried by Structure: PRICE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $234,000
Find on map >>   Show street view

Structure Number: 830001,  Location: 4 MI SW OF TRENTON (Lat: 34.814078,  Lng: -85.545719),  Route carried "under" structure: Interstate 59,  Structure Length: 0. m,  Average Daily Traffic: 13,400 (year 1998),  Truck Traffic: 7%,  Features Intersected: CR 55 BYRDS CHAPEL RD,  Facility Carried by Structure: BYRDS CHAPEL
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830009,  Location: 3 MI SW OF TRENTON (Lat: 34.831619,  Lng: -85.535419),  Route carried "under" structure: Interstate 59,  Structure Length: 0. m,  Average Daily Traffic: 13,400 (year 1998),  Truck Traffic: 7%,  Features Intersected: CR 104 DANIELS ROAD,  Facility Carried by Structure: DANIELS ROAD
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830012,  Location: IN TRENTON (Lat: 34.869589,  Lng: -85.515978),  Route carried "under" structure: Interstate 59,  Structure Length: 0. m,  Average Daily Traffic: 19,030 (year 1998),  Truck Traffic: 7%,  Features Intersected: SR 136,  Facility Carried by Structure: SR 136
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 17.703,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830018,  Location: IN N SIDE OF NEW ENGLAND (Lat: 34.922439,  Lng: -85.481869),  Route carried "under" structure: Interstate 59,  Structure Length: 0. m,  Average Daily Traffic: 19,030 (year 1998),  Truck Traffic: 12%,  Features Intersected: CR 186 OLD HALE GAP RD,  Facility Carried by Structure: OLD HALE GAP RD
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830025,  Location: IN NORTH TRENTON (Lat: 34.888758,  Lng: -85.503569),  Route carried "under" structure: County highway 141,  Structure Length: 0. m,  Average Daily Traffic: 430 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-59 NBL (SR 406),  Facility Carried by Structure: I-59 (NBL)
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830026,  Location: IN NORTH TRENTON (Lat: 34.888919,  Lng: -85.503789),  Route carried "under" structure: County highway 141,  Structure Length: 0. m,  Average Daily Traffic: 430 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-59 SBL (SR 406),  Facility Carried by Structure: I-59 (SBL)
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830027,  Location: IN NEW ENGLAND (Lat: 34.906678,  Lng: -85.489319),  Route carried "under" structure: County highway 271,  Structure Length: 0. m,  Average Daily Traffic: 430 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-59 NBL (SR 406),  Facility Carried by Structure: I-59 (NBL)
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 830028,  Location: IN NEW ENGLAND (Lat: 34.906839,  Lng: -85.489539),  Route carried "under" structure: County highway 271,  Structure Length: 0. m,  Average Daily Traffic: 430 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-59 SBL (SR 406),  Facility Carried by Structure: I-59 (SBL)
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Trenton, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.