Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Trafford, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 154ft / 47.2mTotal length
  • $3,110,000Total costs
  • 70,682Total average daily traffic
  • 7,935Total average daily truck traffic
  • 98,496Total future (year 2025) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Trafford
  • No street view available for this location

New bridges in Trafford, PA - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 21990-1999
  • 12010-2019
Reconstructed bridges in Trafford, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 31990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Trafford, PA
Average Bridge Truck Traffic in Trafford, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 33.3%Fair
  • 22.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Good
  • 44.4%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.2%Good
  • 18.2%Satisfactory
  • 27.3%Fair
  • 36.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 2729,  Location: 491001 TRAFFORD BOROUGH (Lat: 40.380328,  Lng: -79.768542),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 100 (year 2005),  Truck Traffic: 5%,  Average Future Daily Traffic: 110 (year 2025),  Design Load: HS 25 or greater,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: WALLACE AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Good,  Channel: Poor,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 9833,  Location: .8 MI FROM SR 322 (Lat: 40.784269,  Lng: -77.676536),  Route carried "on" structure: ServiceCity street ,  Year Built: 1965,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 300 (year 2021),  Average Future Daily Traffic: 375 (year 2043),  Design Load: HS 20,  Features Intersected: SINKING CREEK,  Facility Carried by Structure: T-609 COLYER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $62,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $835,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9834,  Location: 1200 FT NE OF SR 144 (Lat: 40.805442,  Lng: -77.624386),  Route carried "on" structure: City street ,  Year Built: 1965,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 350 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 375 (year 2043),  Design Load: HS 20,  Features Intersected: POTTER RUN,  Facility Carried by Structure: L GEORGES VLLY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $389,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 28364,  Location: 0.5 MI E WASHINGTONVILLE (Lat: 41.049944,  Lng: -76.665142),  Route carried "on" structure: State highway 254,  Year Built: 1942,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,657 (year 2021),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,500 (year 2032),  Features Intersected: OVER TRIB TO MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.723,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 2852,  Location: 1 MI.N.OF PA 512 (Lat: 40.848014,  Lng: -75.302728),  Route carried "on" structure: State highway 33,  Year Built: 1958,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 37,369 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 43,653 (year 2032),  Design Load: H 20,  Features Intersected: SR1026(CENTER ST/LR48088
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.188,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 33 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 26.7m (87.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $308,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 33413,  Location: 2.5 MI EAST OF VICKSBURG (Lat: 40.953000,  Lng: -76.934614),  Route carried "on" structure: State highway 45,  Year Built: 1936,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 11,006 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,838 (year 2032),  Features Intersected: OVER BR OF LIMESTONE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.320,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $105,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 36344,  Location: NORTH HUNTINGDON TOWNSHIP (Lat: 40.372089,  Lng: -79.757644),  Route carried "on" structure: State highway 993,  Year Built: 1901,  Year Reconstructed: 1931,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 2,759 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,003 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.397,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft)

Condition: Channel: Poor,  Culverts: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $568,000
Find on map >>   Show street view

Structure Number: 36345,  Location: NORTH HUNTINGDON TOWNSHIP (Lat: 40.369394,  Lng: -79.748986),  Route carried "on" structure: State highway 993,  Year Built: 1901,  Year Reconstructed: 1931,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 2,759 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,003 (year 2032),  Design Load: H 20,  Features Intersected: BRUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.168,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $38,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $515,000
Find on map >>   Show street view

Structure Number: 36695,  Location: TRAFFORD BOROUGH (Lat: 40.389047,  Lng: -79.750703),  Route carried "on" structure: State highway ,  Year Built: 1925,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 5,658 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,696 (year 2032),  Design Load: HL 93,  Features Intersected: TURTLE CREEK,  Facility Carried by Structure: SR 4018
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $390,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 36869,  Location: 1/2 MI SW OF SR 993 (Lat: 40.371506,  Lng: -79.762597),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Posted for load,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 640 (year 2031),  Design Load: HS 20,  Features Intersected: BRUSH CREEK,  Facility Carried by Structure: MAHAFFEY HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 48271,  Location: 0.0 mi W from SR 0993 (Lat: 40.386286,  Lng: -79.762661),  Route carried "on" structure: State highway 130,  Year Built: 2013,  Status: Open,  Structure Length: 29.29m (96.10ft),  Average Daily Traffic: 6,974 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,003 (year 2036),  Design Load: HL 93,  Features Intersected: Turtle Creek, NS R/R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Number Of Approach Spans: 1,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48492,  Location: North Huntingdon Twp (Lat: 40.361931,  Lng: -79.745800),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 250 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: Branch of Brush Creek,  Facility Carried by Structure: Ardara Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Discuss Trafford, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.