Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Town Line, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 108ft / 32.9mTotal length
  • $23,963,000Total costs
  • 33,974Total average daily traffic
  • 1,880Total average daily truck traffic
  • 41,420Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Town Line
  • No street view available for this location

New bridges in Town Line, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21950-1959
  • 41980-1989
  • 31990-1999
  • 22000-2009
Reconstructed bridges in Town Line, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Town Line, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 8.3%Good
  • 33.3%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 41.7%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 33.3%Good
  • 25.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 101559,  Location: 2.7 MI W JCT RTS 20 + 358 (Lat: 42.891617,  Lng: -78.604197),  Route carried "on" structure: US 20,  Year Built: 1931,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 9,761 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,806 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BR CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.898,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,566,000,  Roadway Improvement Cost: $917,000,  Total Project Cost: $2,483,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104659,  Location: IN ALDEN (Lat: 42.883447,  Lng: -78.552364),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 2,386 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,952 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: TWO ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.073,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,084,000,  Roadway Improvement Cost: $635,000,  Total Project Cost: $1,718,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332689,  Location: .9 MILE NORTH OF TWN LINE (Lat: 42.902783,  Lng: -78.578217),  Route carried "on" structure: County highway ,  Year Built: 1987,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,171 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,039 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: BRANCH CAYUGA CRK,  Facility Carried by Structure: TOWN LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.031,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $381,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $604,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332698,  Location: .7 MILE SOUTH OF TOWNLINE (Lat: 42.880003,  Lng: -78.577803),  Route carried "on" structure: County highway ,  Year Built: 1959,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 2,710 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,794 (year 2038),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: TOWN LINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.505,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,926,000,  Roadway Improvement Cost: $1,128,000,  Total Project Cost: $3,054,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332703,  Location: 2.1 MI W JCT US20 & SH358 (Lat: 42.898547,  Lng: -78.592828),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,834 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,269 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BR CAYUGA CREEK,  Facility Carried by Structure: RANSOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.765,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $354,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332705,  Location: 1 MI SW JCT US20&TOWNLINE (Lat: 42.880933,  Lng: -78.591900),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 526 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 736 (year 2037),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: RANSOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.818,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.81m (15.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,790,000,  Roadway Improvement Cost: $1,634,000,  Total Project Cost: $4,424,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 332732,  Location: 2.9 MI SW JCT US20 &CR358 (Lat: 42.879383,  Lng: -78.607208),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,449 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,267 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LITTLE BUFFALO CR,  Facility Carried by Structure: SCHWARTZ ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.590,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $694,000,  Roadway Improvement Cost: $406,000,  Total Project Cost: $1,100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332733,  Location: 1.5 MI W JCT US20&TN L RD (Lat: 42.889306,  Lng: -78.607939),  Route carried "on" structure: County highway ,  Year Built: 1921,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,772 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,667 (year 2040),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: SCHWARTZ ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 48.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,292,000,  Roadway Improvement Cost: $1,342,000,  Total Project Cost: $3,634,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332734,  Location: 6.6 MI NW JCT SH78 &SH354 (Lat: 42.881406,  Lng: -78.609878),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Closed,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 1,571 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,943 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE BUFFALO CR,  Facility Carried by Structure: WILLIAM STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.112,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $537,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $851,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332735,  Location: 2.2 MI SW JCT US20&T L RD (Lat: 42.910817,  Lng: -78.621069),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,826 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,556 (year 2039),  Design Load: HS 20,  Features Intersected: N BR PLUM BTTM CK,  Facility Carried by Structure: WESTWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $956,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 336217,  Location: 1.1 MI SE JCT 20'358 (Lat: 42.882447,  Lng: -78.536894),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 1,009 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,248 (year 2040),  Design Load: HS 20,  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: FOUR ROD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.856,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 75.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $846,000,  Total Project Cost: $2,290,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336248,  Location: 2.2 MI NW OF N QUAD ALDEN (Lat: 42.933692,  Lng: -78.540531),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 2,757 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,860 (year 2037),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: WENDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.278,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $610,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552352,  Location: .9 MI SE OF MILL GROVE (Lat: 42.930506,  Lng: -78.548381),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1991,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 202 (year 2018),  Average Future Daily Traffic: 283 (year 2038),  Design Load: HS 20,  Features Intersected: ELLICOTT CREEK,  Facility Carried by Structure: CREEKVIEW DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $1,189,000,  Roadway Improvement Cost: $696,000,  Total Project Cost: $1,885,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Town Line, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.