Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Torrington, Wyoming (WY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 207ft / 62.7mTotal length
  • $332,000Total costs
  • 21,346Total average daily traffic
  • 1,698Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Torrington
  • No street view available for this location

New bridges in Torrington, WY - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 41970-1979
  • 21980-1989
  • 51990-1999
  • 22010-2019
Average Bridge Daily Traffic in Torrington, WY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 64.3%Good
  • 35.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 21.4%Good
  • 64.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 35.7%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 15.4%Very good
  • 38.5%Good
  • 38.5%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: BWK,  Location: Cheyenne - Torrington (Lat: 42.035025,  Lng: -104.183850),  Route carried "on" structure: US 85,  Year Built: 1953,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 6,897 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,656 (year 2041),  Design Load: H 20,  Features Intersected: Cherry Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 146.898,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: CPM,  Location: Torrington - North (Lat: 42.113083,  Lng: -104.206247),  Route carried "on" structure: State highway 159,  Year Built: 1953,  Status: Posted for load,  Structure Length: 2.64m (8.66ft),  Average Daily Traffic: 380 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 532 (year 2041),  Design Load: H 20,  Features Intersected: Interstate Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.968,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.9m (32.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: EZF,  Location: T24N R061W S30 (Lat: 42.031214,  Lng: -104.236342),  Route carried "on" structure: County highway 66B,  Year Built: 1975,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 181 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 253 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.552,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $33,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: EZG,  Location: 3.5 Mi. Sw Of Torrington (Lat: 42.031197,  Lng: -104.224394),  Route carried "on" structure: County highway 66B,  Year Built: 1975,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 181 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 253 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $41,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: EZH,  Location: 3 Mi. Sw Of Torrington (Lat: 42.031181,  Lng: -104.210503),  Route carried "on" structure: County highway 66B,  Year Built: 1975,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 181 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 253 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.412,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $45,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: FAI,  Location: 3 Miles N. Of Torrington (Lat: 42.103128,  Lng: -104.167306),  Route carried "on" structure: County highway 51E,  Year Built: 1973,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 41 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 57 (year 2041),  Design Load: HS 20,  Features Intersected: Interstate Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.042,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.1m (16.7ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.71m (22.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: FBX,  Location: Yoder-Torrington (Lat: 42.016814,  Lng: -104.261475),  Route carried "on" structure: State highway 154,  Year Built: 1986,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 538 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 753 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.983,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: FJY,  Location: 4.5 Mi Nw Of Torrington (Lat: 42.080967,  Lng: -104.266211),  Route carried "on" structure: County highway 41B,  Year Built: 1987,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 597 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 836 (year 2041),  Design Load: HS 20,  Features Intersected: North Platte River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.817,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.03m (0.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $5,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: IXS,  Location: West Of Torrington (Lat: 42.015689,  Lng: -104.266422),  Route carried "on" structure: County highway 41A,  Year Built: 1993,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 31 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 43 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.725,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $20,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: IXT,  Location: 2.5 Mi S.W Of Torrington (Lat: 42.033061,  Lng: -104.208303),  Route carried "on" structure: County highway 47B,  Year Built: 1993,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 116 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 162 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.407,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $49,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: IXU,  Location: Apx 1 Mi E Of Torrington (Lat: 42.039386,  Lng: -104.169206),  Route carried "on" structure: County highway 51C,  Year Built: 1993,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 41 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 57 (year 2041),  Design Load: HS 20,  Features Intersected: Cherry Creek Drainage
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.942,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $18,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: IXV,  Location: 4 Miles W. Of Torrington (Lat: 42.045875,  Lng: -104.264717),  Route carried "on" structure: County highway 68C,  Year Built: 1993,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 41 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 57 (year 2041),  Design Load: HS 20,  Features Intersected: Fort Laramie Canal
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.183,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $66,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: JBI,  Location: Torrington South Road (Lat: 42.052839,  Lng: -104.184319),  Route carried "on" structure: US 85,  Year Built: 1994,  Status: Open,  Structure Length: 11.89m (39.01ft),  Average Daily Traffic: 6,897 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,656 (year 2041),  Design Load: HS 20,  Features Intersected: North Platte River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 148.879,  Lanes on structure: 4,  Base Highway Network: Yes (Inventory Route: ML8,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: October 2019,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: MHB,  Location: Torrington Streets (Lat: 42.058581,  Lng: -104.176933),  Route carried "on" structure: US 85,  Year Built: 2013,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 1,062 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,487 (year 2041),  Design Load: HL 93,  Features Intersected: BNSF Railway / US 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.835,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes (Inventory Route: ML2022,  Subroute: 2),  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: MHB,  Location: Torrington Streets (Lat: 42.058581,  Lng: -104.176933),  Route carried "under" structure: US 85,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 4,162 (year 2021),  Truck Traffic: 15%,  Features Intersected: BNSF Railway / US 26
Minimum Vertical Clearance: 7.85m (25.75ft),  Kilometerpoint: 78.494,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Torrington, Wyoming (WY) on our hugely popular Wyoming forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.