Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Swartzville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 36Number of bridges
  • 256ft / 78.5mTotal length
  • $3,239,000Total costs
  • 449,026Total average daily traffic
  • 78,744Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Swartzville
  • No street view available for this location

New bridges in Swartzville, PA - historical statistics
  • New bridges - historical statistics
  • 51940-1949
  • 31950-1959
  • 31960-1969
  • 231970-1979
  • 21990-1999
Reconstructed bridges in Swartzville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Swartzville, PA
Average Bridge Truck Traffic in Swartzville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 22.2%Good
  • 50.0%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 11.1%Good
  • 55.6%Satisfactory
  • 27.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 38.9%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Good
  • 50.0%Satisfactory
  • 37.5%Fair
Find on map >>   Show street view

Structure Number: 21113,  Location: 2 MI. E. OF REAMSTOWN (Lat: 40.216722,  Lng: -76.090539),  Route carried "on" structure: US 222,  Year Built: 1972,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 18,462 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 20,739 (year 2032),  Design Load: HS 20,  Features Intersected: SR 1040; SPUR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 73.660,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21114,  Location: 2.5 MI.E. OF REAMSTOWN (Lat: 40.218806,  Lng: -76.083636),  Route carried "on" structure: US 222,  Year Built: 1972,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 18,462 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 20,739 (year 2035),  Design Load: HS 20,  Features Intersected: I-76, PA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.250,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 52.1m (170.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $37,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $495,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21115,  Location: 0.25 mi.W. of Turnpike (Lat: 40.219731,  Lng: -76.080442),  Route carried "on" structure: US 222,  Year Built: 1976,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 18,462 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 20,739 (year 2032),  Design Load: HS 20,  Features Intersected: SR 1059; Muddy Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.788,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21116,  Location: 2.3 MI.E. OF REAMSTOWN (Lat: 40.218278,  Lng: -76.084514),  Route carried "on" structure: US 222,  Year Built: 1972,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 9.42m (30.91ft),  Average Daily Traffic: 18,231 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 19,474 (year 2035),  Design Load: HS 20,  Features Intersected: I-76, PA TURNPIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.257,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 14 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 52.1m (170.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $246,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21117,  Location: 0.25 MI.S. OF TURNPIKE (Lat: 40.219514,  Lng: -76.080331),  Route carried "on" structure: US 222,  Year Built: 1976,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 18,231 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 19,474 (year 2032),  Design Load: HS 20,  Features Intersected: SR 1059; MUDDY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.752,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21118,  Location: 1 MI. S. OF REAMSTOWN (Lat: 40.223178,  Lng: -76.067644),  Route carried "on" structure: US 222,  Year Built: 1975,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 18,231 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 19,474 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.733,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21119,  Location: 3 MI. E. OF REAMSTOWN (Lat: 40.223433,  Lng: -76.067597),  Route carried "on" structure: US 222,  Year Built: 1975,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 18,462 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 20,739 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.774,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21171,  Location: PA 283 & L.R. 36004 (Lat: 40.242994,  Lng: -76.098833),  Route carried "on" structure: State highway 283,  Year Built: 1969,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 21,375 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 31,663 (year 2032),  Design Load: HS 20,  Features Intersected: SR 4025; Clover Lead Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.677,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: January 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $399,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 21357,  Location: 1.0 MI. SE OF SWARTZVILLE (Lat: 40.224189,  Lng: -76.064375),  Route carried "on" structure: State highway 897,  Year Built: 1975,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 5,561 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,533 (year 2032),  Design Load: HS 20,  Features Intersected: US 222; SR 0222
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.797,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 21489,  Location: 2MI SOF SWARTZVILLE (Lat: 40.204325,  Lng: -76.082958),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,888 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,143 (year 2032),  Design Load: HL 93,  Features Intersected: LITTLE MUDDY CREEK,  Facility Carried by Structure: sr 1059 muddy ck.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 99.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $54,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $724,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2149,  Location: TP EXIT-21 RAMP (SPUR RD) (Lat: 40.214639,  Lng: -76.080117),  Route carried "on" structure: State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 1,888 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,143 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP EF (TURNPIKE),  Facility Carried by Structure: 1059 Muddy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.958,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21792,  Location: EAST COCALICO TWP (Lat: 40.223697,  Lng: -76.095914),  Route carried "on" structure: State highway 272,  Year Built: 1949,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 14,351 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,085 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.249,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.3m (63.3ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $233,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21793,  Location: EAST COCALICO TWP (Lat: 40.222019,  Lng: -76.091481),  Route carried "on" structure: ServiceOther road ,  Year Built: 1949,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 49 (year 1994),  Truck Traffic: 6%,  Average Future Daily Traffic: 76 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: PEPPERIDGE FARM EN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $61,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $822,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 21794,  Location: 1MI SOF SWARTZVILLE (Lat: 40.217447,  Lng: -76.079606),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 1,888 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,896 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: LR 36169, SR 1059
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.621,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $18,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $241,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21795,  Location: EAST COCALICO TWP (Lat: 40.216331,  Lng: -76.074883),  Route carried "on" structure: Ramp Interstate 76,  Year Built: 1970,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 12,249 (year 1994),  Truck Traffic: 16%,  Average Future Daily Traffic: 18,820 (year 2030),  Design Load: HS 20,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: RAMP AB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.90m (25.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21796,  Location: BRECKNOCK TWP (Lat: 40.215606,  Lng: -76.071142),  Route carried "on" structure: Interstate 76,  Year Built: 1949,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 33,608 (year 2001),  Truck Traffic: 23%,  Average Future Daily Traffic: 40,264 (year 2030),  Design Load: HS 20,  Features Intersected: LITTLE MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 32 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019
Find on map >>   Show street view

Structure Number: 21842,  Location: 3/4 MI WEST OF SR 897 (Lat: 40.216508,  Lng: -76.069836),  Route carried "on" structure: City street ,  Year Built: 1973,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 825 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,105 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE MUDDY CREEK,  Facility Carried by Structure: T862 STONE HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 21846,  Location: 1300 FT WEST OF 897 (Lat: 40.220356,  Lng: -76.067967),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 310 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 415 (year 2032),  Features Intersected: LITTLE MUDDY CREEK,  Facility Carried by Structure: T963 GEHMN SCHL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $79,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 40473,  Location: 0.75 MI. S. OF ADAMSTOWN (Lat: 40.227847,  Lng: -76.066825),  Route carried "on" structure: State highway 897,  Year Built: 1999,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 5,127 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,539 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: LITTLE MUDDY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.797,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 57568,  Location: NEAR HOMESTEAD RD (Lat: 40.237931,  Lng: -76.087150),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 200 (year 2040),  Design Load: HS 20,  Features Intersected: STONY RUN,  Facility Carried by Structure: MUDDY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 0.3m (1.0ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 21112,  Location: 2 mi. E. of Reamstown (Lat: 40.216667,  Lng: -76.090000),  Route carried "under" structure: Spur State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 7,939 (year 2020),  Truck Traffic: 12%,  Features Intersected: SR 1040; Spur Road,  Facility Carried by Structure: US 222 NB; SR 0222
Minimum Vertical Clearance: 4.40m (14.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 21112,  Location: 2 mi. E. of Reamstown (Lat: 40.216667,  Lng: -76.090000),  Route carried "under" structure: Spur State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,959 (year 2020),  Truck Traffic: 18%,  Features Intersected: SR 1040; Spur Road,  Facility Carried by Structure: US 222 NB; SR 0222
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 21113,  Location: 2 MI. E. OF REAMSTOWN (Lat: 40.216722,  Lng: -76.090539),  Route carried "under" structure: Spur State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 7,939 (year 2020),  Truck Traffic: 12%,  Features Intersected: SR 1040; SPUR ROAD,  Facility Carried by Structure: US 222 SB; SR 0222
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 21113,  Location: 2 MI. E. OF REAMSTOWN (Lat: 40.216722,  Lng: -76.090539),  Route carried "under" structure: Spur State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,959 (year 2020),  Truck Traffic: 18%,  Features Intersected: SR 1040; SPUR ROAD,  Facility Carried by Structure: US 222 SB; SR 0222
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 21114,  Location: 2.5 MI.E. OF REAMSTOWN (Lat: 40.218806,  Lng: -76.083636),  Route carried "under" structure: Interstate 76,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 1977),  Truck Traffic: 24%,  Features Intersected: I-76, PA TURNPIKE,  Facility Carried by Structure: US 222 SB; SR 0222
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 21115,  Location: 0.25 mi.W. of Turnpike (Lat: 40.219731,  Lng: -76.080442),  Route carried "under" structure: State highway ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 1,888 (year 2022),  Truck Traffic: 2%,  Features Intersected: SR 1059; Muddy Creek Rd,  Facility Carried by Structure: US 222 SB; SR 0222
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 1.621,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 21116,  Location: 2.3 MI.E. OF REAMSTOWN (Lat: 40.218278,  Lng: -76.084514),  Route carried "under" structure: Interstate 76,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 1977),  Truck Traffic: 24%,  Features Intersected: I-76, PA TURNPIKE,  Facility Carried by Structure: US 222 NB; SR 0222
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 21117,  Location: 0.25 MI.S. OF TURNPIKE (Lat: 40.219514,  Lng: -76.080331),  Route carried "under" structure: State highway ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 1,888 (year 2022),  Truck Traffic: 2%,  Features Intersected: SR 1059; MUDDY CREEK RD,  Facility Carried by Structure: US 222 NB; SR 0222
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 1.621,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 21171,  Location: PA 283 & L.R. 36004 (Lat: 40.242994,  Lng: -76.098833),  Route carried "under" structure: State highway ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 6,263 (year 2022),  Truck Traffic: 12%,  Features Intersected: SR 4025; Clover Lead Rd.,  Facility Carried by Structure: PA-283 EB; SR 0300
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 1.735,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 21357,  Location: 1.0 MI. SE OF SWARTZVILLE (Lat: 40.224189,  Lng: -76.064375),  Route carried "under" structure: US 222,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 18,231 (year 2022),  Truck Traffic: 15%,  Features Intersected: US 222; SR 0222,  Facility Carried by Structure: PA 897; SR 0897
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 76.220,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 21357,  Location: 1.0 MI. SE OF SWARTZVILLE (Lat: 40.224189,  Lng: -76.064375),  Route carried "under" structure: US 222,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 18,462 (year 2022),  Truck Traffic: 16%,  Features Intersected: US 222; SR 0222,  Facility Carried by Structure: PA 897; SR 0897
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 76.262,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 2149,  Location: TP EXIT-21 RAMP (SPUR RD) (Lat: 40.214639,  Lng: -76.080117),  Route carried "under" structure: Ramp Interstate 76,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 8,217 (year 2004),  Features Intersected: RAMP EF (TURNPIKE),  Facility Carried by Structure: 1059 Muddy Creek
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 21792,  Location: EAST COCALICO TWP (Lat: 40.223697,  Lng: -76.095914),  Route carried "under" structure: Interstate 76,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: LR148,SR0272;PA272
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 21793,  Location: EAST COCALICO TWP (Lat: 40.222019,  Lng: -76.091481),  Route carried "under" structure: Interstate 76,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: PEPPERIDGE FARM EN
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 21794,  Location: 1MI SOF SWARTZVILLE (Lat: 40.217447,  Lng: -76.079606),  Route carried "under" structure: Interstate 76,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 24,971 (year 2001),  Truck Traffic: 24%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: LR 36169, SR 1059
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 21795,  Location: EAST COCALICO TWP (Lat: 40.216331,  Lng: -76.074883),  Route carried "under" structure: Interstate 76,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 33,608 (year 2001),  Truck Traffic: 23%,  Features Intersected: PA TPK (I-76),  Facility Carried by Structure: RAMP AB
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.8m (137.1ft)

Discuss Swartzville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.