Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stotts City, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 148ft / 45.0mTotal length
  • $4,023,000Total costs
  • 122,310Total average daily traffic
  • 33,004Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stotts City
  • No street view available for this location

New bridges in Stotts City, MO - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31920-1929
  • 61930-1939
  • 21940-1949
  • 11950-1959
  • 71960-1969
  • 11980-1989
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Stotts City, MO
Average Bridge Truck Traffic in Stotts City, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 7.1%Good
  • 35.7%Satisfactory
  • 28.6%Fair
  • 14.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 28.6%Good
  • 35.7%Satisfactory
  • 14.3%Fair
  • 7.1%Poor
  • 7.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 35.7%Fair
  • 14.3%Poor
  • 7.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Very good
  • 5.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
  • 10.0%Poor
  • 5.0%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
  • 14.3%Serious
Find on map >>   Show street view

Structure Number: 18799,  Location: S 15 T 28 N R 28 W (Lat: 37.143383,  Lng: -93.984392),  Route carried "on" structure: County highway 200,  Year Built: 1938,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: H 10,  Features Intersected: TRIB SPRING RVR,  Facility Carried by Structure: COUNTY RD 1040
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 18.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.18m (0.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $131,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $196,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18827,  Location: S 15 T 28 N R 28 W (Lat: 37.138136,  Lng: -93.984506),  Route carried "on" structure: County highway 201,  Year Built: 1930,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: SPRING RVR,  Facility Carried by Structure: COUNTY RD 1040
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 4.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: May 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19122,  Location: S 19 T 28 N R 27 W (Lat: 37.131264,  Lng: -93.917333),  Route carried "on" structure: County highway 212,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 28 (year 2041),  Design Load: H 10,  Features Intersected: SPRING RVR,  Facility Carried by Structure: COUNTY RD 1082
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.27m (0.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $198,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $296,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21704,  Location: S 2 T 28 N R 28 W (Lat: 37.161817,  Lng: -93.954347),  Route carried "on" structure: County highway 320,  Year Built: 1940,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Design Load: H 10,  Features Intersected: COLLEY HOLLOW,  Facility Carried by Structure: COUNTY RD 2080
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 26.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21942,  Location: S 11 T 28 N R 28 W (Lat: 37.147461,  Lng: -93.961958),  Route carried "on" structure: County highway 331,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 40 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 56 (year 2041),  Design Load: H 10,  Features Intersected: COLLEY HOLLOW,  Facility Carried by Structure: COUNTY RD 2090
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22191,  Location: S 15 T 28 N R 28 W (Lat: 37.134967,  Lng: -93.975058),  Route carried "on" structure: County highway 344,  Year Built: 1920,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 30 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 42 (year 2041),  Design Load: H 10,  Features Intersected: DRY HOLLOW,  Facility Carried by Structure: COUNTY RD 2100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.19m (0.62ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $206,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22575,  Location: S 28 T 28 N R 27 W (Lat: 37.115814,  Lng: -93.894192),  Route carried "on" structure: County highway 362,  Year Built: 1935,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 840 (year 2041),  Design Load: H 15,  Features Intersected: SPRING RVR,  Facility Carried by Structure: COUNTY RD 2110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.667,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.39m (1.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $287,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $431,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22805,  Location: S 26 T 28 N R 28 W (Lat: 37.103836,  Lng: -93.955672),  Route carried "on" structure: County highway 375,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 100 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: H 10,  Features Intersected: DRY HOLLOW,  Facility Carried by Structure: COUNTY RD 2120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 15.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 9.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 0.19m (0.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $206,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24586,  Location: S 35 T 28 N R 28 W (Lat: 37.089289,  Lng: -93.952028),  Route carried "on" structure: County highway 514,  Year Built: 1900,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2041),  Design Load: H 10,  Features Intersected: DRY HOLLOW,  Facility Carried by Structure: COUNTY RD 2130
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.2m (13.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.17m (0.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $127,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30896,  Location: S 19 T 28 N R 27 W (Lat: 37.128750,  Lng: -93.919761),  Route carried "on" structure: County highway 1082,  Year Built: 2004,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 28 (year 2041),  Features Intersected: TRIB SPRING RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 0.6m (2.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31852,  Location: S 27 T 28 N R 28 W (Lat: 37.118556,  Lng: -93.968833),  Route carried "on" structure: County highway 361,  Year Built: 1980,  Status: Posted for load,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 50 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: DRY HOLLOW,  Facility Carried by Structure: COUNTY RD 2110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.2m (3.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Channel: Serious,  Culverts: Serious,  Operating Rating: 10.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.15m (0.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 33671,  Location: S 32 T 28 N R 27 W (Lat: 37.088211,  Lng: -93.898656),  Route carried "on" structure: County highway 516,  Year Built: 2009,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 210 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 294 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: FREISTATT BR,  Facility Carried by Structure: COUNTY RD 2130
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 35295,  Location: S 20 T 28 N R 27 W (Lat: 37.117456,  Lng: -93.902097),  Route carried "on" structure: County highway 362,  Year Built: 2016,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 600 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 840 (year 2041),  Features Intersected: TRIB TO SPRING RVR,  Facility Carried by Structure: COUNTY RD 2110
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: March 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5156,  Location: S 11 T 27 N R 28 W (Lat: 37.074422,  Lng: -93.953731),  Route carried "on" structure: State highway 97,  Year Built: 1932,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 847 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,228 (year 2041),  Design Load: H 15,  Features Intersected: DRY BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.035,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 5157,  Location: S 2 T 27 N R 28 W (Lat: 37.074408,  Lng: -93.952581),  Route carried "on" structure: State highway 97,  Year Built: 1932,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 847 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,228 (year 2041),  Design Load: H 15,  Features Intersected: DRY BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.934,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Inventory Rating: 63.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 6104,  Location: S 13 T 28 N R 28 W (Lat: 37.136422,  Lng: -93.948536),  Route carried "on" structure: State highway 97,  Year Built: 1947,  Status: Open,  Structure Length: 8.81m (28.90ft),  Average Daily Traffic: 1,303 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,889 (year 2041),  Design Load: H 15,  Features Intersected: SPRING RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.635,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 30.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,120,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,681,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 674,  Location: S 2 T 27 N R 28 W (Lat: 37.074836,  Lng: -93.953744),  Route carried "on" structure: Interstate 44,  Year Built: 1963,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 28,052 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 53,299 (year 2041),  Design Load: HS 20,  Features Intersected: SMITH BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.567,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 675,  Location: S 2 T 27 N R 28 W (Lat: 37.074831,  Lng: -93.952881),  Route carried "on" structure: Interstate 44,  Year Built: 1963,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 28,052 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 53,299 (year 2041),  Design Load: HS 20,  Features Intersected: SMITH BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.632,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.0m (128.0ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 676,  Location: S 2 T 27 N R 28 W (Lat: 37.074858,  Lng: -93.950142),  Route carried "on" structure: State highway 97,  Year Built: 1963,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 1,102 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,598 (year 2041),  Design Load: H 15,  Features Intersected: IS 44
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.475,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8822,  Location: S 35 T 28 N R 28 W (Lat: 37.096639,  Lng: -93.949583),  Route carried "on" structure: State highway 97,  Year Built: 1933,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 1,303 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,889 (year 2041),  Design Load: H 10,  Features Intersected: DRY BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.090,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 9936,  Location: S 13 T 28 N R 28 W (Lat: 37.142183,  Lng: -93.948372),  Route carried "on" structure: State highway 97,  Year Built: 1900,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,303 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,889 (year 2041),  Features Intersected: SPRING CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 79.035,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Fair,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.15m (0.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $170,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $256,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 676,  Location: S 2 T 27 N R 28 W (Lat: 37.074858,  Lng: -93.950142),  Route carried "under" structure: Interstate 44,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,136 (year 2021),  Truck Traffic: 26%,  Features Intersected: IS 44,  Facility Carried by Structure: MO 97 S
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 61.957,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 676,  Location: S 2 T 27 N R 28 W (Lat: 37.074858,  Lng: -93.950142),  Route carried "under" structure: Interstate 44,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 15,243 (year 2021),  Truck Traffic: 26%,  Features Intersected: IS 44,  Facility Carried by Structure: MO 97 S
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 409.838,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 8137,  Location: S 4 T 27 N R 28 W (Lat: 37.075758,  Lng: -93.999603),  Route carried "under" structure: Interstate 44,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 13,916 (year 2021),  Truck Traffic: 42%,  Features Intersected: IS 44,  Facility Carried by Structure: RT F E
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 414.236,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 8137,  Location: S 4 T 27 N R 28 W (Lat: 37.075758,  Lng: -93.999603),  Route carried "under" structure: Interstate 44,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 14,136 (year 2021),  Truck Traffic: 26%,  Features Intersected: IS 44,  Facility Carried by Structure: RT F E
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 57.558,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 20.1m (65.9ft)

Discuss Stotts City, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.