Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for State Line, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 121ft / 36.9mTotal length
  • $4,226,000Total costs
  • 258,721Total average daily traffic
  • 49,418Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for State Line
  • No street view available for this location

New bridges in State Line, PA - historical statistics
  • New bridges - historical statistics
  • 121960-1969
  • 11980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in State Line, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in State Line, PA
Average Bridge Truck Traffic in State Line, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 16.7%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 17279,  Location: 1.5 MI.S. OF GREENCASTLE (Lat: 39.755981,  Lng: -77.726950),  Route carried "on" structure: US 11,  Year Built: 1960,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 12,357 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 17,634 (year 2035),  Design Load: HL 93,  Features Intersected: I-81; SR 0081
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.560,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $1,672,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17359,  Location: 0.75 N. OF STATE LINE (Lat: 39.731728,  Lng: -77.726639),  Route carried "on" structure: State highway ,  Year Built: 1960,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 2,707 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,247 (year 2032),  Design Load: HS 20,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-351 (HYKES RD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $973,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 174,  Location: Mason Dixon Line (Lat: 39.721242,  Lng: -77.732500),  Route carried "on" structure: State highway 163,  Year Built: 1960,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 2,487 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,496 (year 2032),  Design Load: HS 20,  Features Intersected: I-81; SR 0081
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.072,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $260,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17543,  Location: 0.5 Mi. NW of Milnor (Lat: 39.758083,  Lng: -77.753542),  Route carried "on" structure: State highway ,  Year Built: 1982,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 135 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 914 (year 2032),  Design Load: HS 20,  Features Intersected: Trib Conococheague Creek,  Facility Carried by Structure: SR 3006;Milnor Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $43,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17544,  Location: 1.75 ML. N. OF STATE LINE (Lat: 39.746322,  Lng: -77.728356),  Route carried "on" structure: State highway ,  Year Built: 1960,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 74 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 914 (year 2032),  Design Load: HS 20,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3006
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.00m (26.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $95,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $1,278,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48605,  Location: 1.5 M west of US 11 (Lat: 39.741497,  Lng: -77.749069),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 500 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 750 (year 2040),  Design Load: HL 93,  Features Intersected: Norfolk Southern RR,  Facility Carried by Structure: Hykes Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: Railroad,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48747,  Location: Norlo Pk, .2 mi S of SR30 (Lat: 39.741597,  Lng: -77.749097),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 1,036 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,550 (year 2032),  Features Intersected: Trib to Conococheague Ck,  Facility Carried by Structure: Lincoln Ter
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17279,  Location: 1.5 MI.S. OF GREENCASTLE (Lat: 39.755981,  Lng: -77.726950),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,617 (year 2021),  Truck Traffic: 37%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: US 11; Molly Pitch
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 4.089,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 17279,  Location: 1.5 MI.S. OF GREENCASTLE (Lat: 39.755981,  Lng: -77.726950),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,927 (year 2021),  Truck Traffic: 35%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: US 11; Molly Pitch
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 4.126,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 17359,  Location: 0.75 N. OF STATE LINE (Lat: 39.731728,  Lng: -77.726639),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 31,758 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-351 (HYKES RD)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.810,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 17359,  Location: 0.75 N. OF STATE LINE (Lat: 39.731728,  Lng: -77.726639),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 32,869 (year 2021),  Truck Traffic: 15%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: T-351 (HYKES RD)
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.785,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 174,  Location: Mason Dixon Line (Lat: 39.721242,  Lng: -77.732500),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 31,758 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: PA 163;Mason Dixon
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 174,  Location: Mason Dixon Line (Lat: 39.721242,  Lng: -77.732500),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 32,869 (year 2021),  Truck Traffic: 15%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: PA 163;Mason Dixon
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 17544,  Location: 1.75 ML. N. OF STATE LINE (Lat: 39.746322,  Lng: -77.728356),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 31,758 (year 2021),  Truck Traffic: 17%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3006
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 2.432,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 17544,  Location: 1.75 ML. N. OF STATE LINE (Lat: 39.746322,  Lng: -77.728356),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 32,869 (year 2021),  Truck Traffic: 15%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: SR 3006
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 2.382,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss State Line, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.