Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for St. Croix Falls, Wisconsin (WI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 108ft / 32.9mTotal length
  • $2,378,000Total costs
  • 78,515Total average daily traffic
  • 5,613Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for St. Croix Falls
  • No street view available for this location

New bridges in St. Croix Falls, WI - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31950-1959
  • 11970-1979
  • 51990-1999
Average Bridge Daily Traffic in St. Croix Falls, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 50.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 50.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: B480003,  Location: MINNESOTA STATE LINE (Lat: 45.401756,  Lng: -92.651167),  Route carried "on" structure: US 8,  Year Built: 1955,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 12.33m (40.45ft),  Average Daily Traffic: 18,500 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,500 (year 2039),  Design Load: H 20,  Features Intersected: ST CROIX RIVER 07
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 12.77m (41.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 72 months,  Inspection Date: September 2020,  Underwater Inspection Date: July 2020,  Other Special Inspection Date: April 2016,  Bridge Improvement Cost: $1,585,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,378,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B480004,  Location: 0.1M E MINN STATE LINE (Lat: 45.402014,  Lng: -92.648786),  Route carried "on" structure: US 8,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 2.82m (9.25ft),  Average Daily Traffic: 16,420 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,220 (year 2036),  Design Load: HS 20,  Features Intersected: LRD INTERSTATE PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B48003,  Location: 1.5M E JCT STH 65 (Lat: 45.395792,  Lng: -92.459686),  Route carried "on" structure: US 8,  Year Built: 1990,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 8,300 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 11,120 (year 2039),  Design Load: HS 20,  Features Intersected: BALSAM BRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B480038,  Location: 3.6M W JCT CTH Y (Lat: 45.402686,  Lng: -92.636983),  Route carried "on" structure: US 8,  Year Built: 1995,  Status: Open,  Structure Length: 5.96m (19.55ft),  Average Daily Traffic: 8,210 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,610 (year 2036),  Design Load: HS 20,  Features Intersected: STH 35 SB / S VINCENT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.9m (101.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B480039,  Location: 0.4M E JCT STH 87 (Lat: 45.402489,  Lng: -92.637606),  Route carried "on" structure: US 8,  Year Built: 1995,  Status: Open,  Structure Length: 5.96m (19.55ft),  Average Daily Traffic: 8,210 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,610 (year 2036),  Design Load: HS 20,  Features Intersected: STH 35 SB / S VINCENT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P480704,  Location: 0.5M E JCT STH 46 (Lat: 45.296000,  Lng: -92.358000),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 575 (year 2019),  Average Future Daily Traffic: 632 (year 2039),  Design Load: HS 20,  Features Intersected: APPLE RIVER,  Facility Carried by Structure: LRD GRIFFIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 7.8m (25.6ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B480004,  Location: AT JCT WITH USH 8 (Lat: 45.402014,  Lng: -92.648786),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2019),  Features Intersected: LRD INTERSTATE PARK RD,  Facility Carried by Structure: USH 8
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.7m (35.1ft)

Find on map >>   Show street view

Structure Number: B480038,  Location: 2.8M S JCT CTH Y (Lat: 45.402686,  Lng: -92.636983),  Route carried "under" structure: State highway 35,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 8,800 (year 2019),  Features Intersected: STH 35 SB / S VINCENT ST,  Facility Carried by Structure: USH 8 WB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.9m (101.4ft)

Find on map >>   Show street view

Structure Number: B480039,  Location: 2.8M S JCT CTH Y (Lat: 45.402489,  Lng: -92.637606),  Route carried "under" structure: State highway 35,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 8,800 (year 2019),  Features Intersected: STH 35 SB / S VINCENT ST,  Facility Carried by Structure: USH 8 EB
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Structure Number: P480703,  Location: 1.0M E JCT USH 8,  Route carried "under" structure: City street ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2019),  Features Intersected: LRD MAPLE DR,  Facility Carried by Structure: SOO LINE
Minimum Vertical Clearance: 7.49m (24.57ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.3m (37.1ft)

Discuss St. Croix Falls, Wisconsin (WI) on our hugely popular Wisconsin forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.