  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 79ft / 23.7mTotal length
  • $1,939,000Total costs
  • 11,100Total average daily traffic
  • 995Total average daily truck traffic
  • 11,656Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Shrewsbury
  • No street view available for this location

New bridges in Shrewsbury, VT - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11930-1939
  • 41970-1979
  • 11990-1999
  • 32010-2019
Reconstructed bridges in Shrewsbury, VT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Shrewsbury, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Very good
  • 60.0%Good
  • 10.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101122000711221,  Location: 0.1 MI TO JCT C3 TH 45 (Lat: 43.537706,  Lng: -72.872181),  Route carried "on" structure: Other road C2001,  Year Built: 1936,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 630 (year 2029),  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 101122001511221,  Location: 0.4 MI JCT CL 2 TH 3 (Lat: 43.505258,  Lng: -72.810056),  Route carried "on" structure: Other road C3030,  Year Built: 1976,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 40 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 42 (year 2029),  Design Load: H 20,  Features Intersected: FREEMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 101122002311221,  Location: 0.01 MI TO JCT CL 3 TH 37 (Lat: 43.488850,  Lng: -72.839697),  Route carried "on" structure: Other road C3037,  Year Built: 2014,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 105 (year 2029),  Design Load: HS 20,  Features Intersected: FREEMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 101122002711221,  Location: 0.3 MI TO JCT CL 3 TH 37 (Lat: 43.487469,  Lng: -72.841514),  Route carried "on" structure: Other road C3036,  Year Built: 2014,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 105 (year 2029),  Design Load: HS 20,  Features Intersected: FREEMAN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 101122003011221,  Location: 0.5 MI TO JCT CL 3 TH 13 (Lat: 43.558950,  Lng: -72.851569),  Route carried "on" structure: Other road C3013,  Year Built: 2014,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: SARGENT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $396,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 101122003211221,  Location: 0.3 MI TO JCT CL 3 TH 12 (Lat: 43.550192,  Lng: -72.858517),  Route carried "on" structure: Other road C3006,  Year Built: 1974,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2029),  Design Load: H 20,  Features Intersected: SARGENT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $303,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 101122003311221,  Location: 0.05 MI JCT CL 2 TH 1 (Lat: 43.540769,  Lng: -72.875186),  Route carried "on" structure: Other road C3011,  Year Built: 1974,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 315 (year 2029),  Design Load: H 20,  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $673,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101122003411221,  Location: 0.1 MI TO JCT C2 TH 1 (Lat: 43.566250,  Lng: -72.918867),  Route carried "on" structure: Other road C3006,  Year Built: 1880,  Year Reconstructed: 2015,  Status: Posted for load,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2029),  Features Intersected: COLD RIVER
Minimum Vertical Clearance: 3.20m (10.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $567,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 200025005011222,  Location: 3.0 MI N JCT. VT.140 (Lat: 43.488053,  Lng: -72.881214),  Route carried "on" structure: State highway 103,  Year Built: 1991,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 4,800 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,040 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.973,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200025005111222,  Location: 3.8 MI N JCT. VT.140 (Lat: 43.497392,  Lng: -72.894347),  Route carried "on" structure: State highway 103,  Year Built: 1979,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 4,800 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 5,040 (year 2028),  Design Load: HS 20+Mod,  Features Intersected: MILL RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.434,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric