Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sherrard, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 128ft / 38.6mTotal length
  • $128,000Total costs
  • 7,225Total average daily traffic
  • 728Total average daily truck traffic
  • 9,002Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sherrard
  • No street view available for this location

New bridges in Sherrard, IL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 21970-1979
  • 61980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Truck Traffic in Sherrard, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 50.0%Good
  • 21.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 35.7%Very good
  • 42.9%Good
  • 14.3%Satisfactory
  • 7.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 35.7%Very good
  • 35.7%Good
  • 21.4%Satisfactory
  • 7.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 37.5%Good
  • 31.3%Satisfactory
  • 6.3%Fair
Find on map >>   Show street view

Structure Number: 663111,  Location: S.CTR-24-T15NR1W (Lat: 41.268358,  Lng: -90.445031),  Route carried "on" structure: County highway ,  Year Built: 1947,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 950 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 900 (year 2032),  Design Load: H 15,  Features Intersected: EDWARDS RIVER,  Facility Carried by Structure: FAS 206-CH 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.288,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.4m (73.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 663112,  Location: SW-12-T15NR1W (Lat: 41.301094,  Lng: -90.451389),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 1,100 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,150 (year 2032),  Design Load: HS 15,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: FAS 206-CH 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.554,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 665101,  Location: NW-21-T15NR1W (Lat: 41.283775,  Lng: -90.509672),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 275 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 350 (year 2032),  Design Load: HS 15,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 665106,  Location: SE-16-T15NR1W (Lat: 41.289644,  Lng: -90.493378),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 375 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 75 (year 2032),  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.536,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $85,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $128,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 665109,  Location: SE-10-T15NR1W (Lat: 41.298939,  Lng: -90.473578),  Route carried "on" structure: County highway ,  Year Built: 1977,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 35%,  Average Future Daily Traffic: 75 (year 2032),  Design Load: HS 20,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 282
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.106,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 66511,  Location: SW-27-T15NR1W (Lat: 41.254539,  Lng: -90.488189),  Route carried "on" structure: County highway ,  Year Built: 1975,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 75 (year 2019),  Truck Traffic: 27%,  Average Future Daily Traffic: 50 (year 2032),  Features Intersected: PARKER RUN,  Facility Carried by Structure: TR 105
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.148,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 665112,  Location: SE-12-T15NR1W (Lat: 41.298586,  Lng: -90.434436),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 51 (year 2032),  Design Load: HS 20,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.764,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 665113,  Location: NE-29-T15NR1W (Lat: 41.268511,  Lng: -90.516392),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 100 (year 2032),  Design Load: HS 20,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.570,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 665114,  Location: SE-29-T15NR1W (Lat: 41.258239,  Lng: -90.517925),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 75 (year 2032),  Design Load: HS 20,  Features Intersected: EDWARDS RIVER,  Facility Carried by Structure: TR 262
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.143,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.8 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 665115,  Location: E.CTR-20-T15NR1W (Lat: 41.276025,  Lng: -90.512669),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 125 (year 2014),  Truck Traffic: 16%,  Average Future Daily Traffic: 126 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CAMP CREEK,  Facility Carried by Structure: TR 264
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.426,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 813093,  Location: 2.4 MI N OF SHERRARD (Lat: 41.362919,  Lng: -90.510033),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 775 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,300 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF MILL CREEK,  Facility Carried by Structure: 63 STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8131,  Location: 7 MI SW COAL VALLE (Lat: 41.340900,  Lng: -90.505547),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 575 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 700 (year 2040),  Design Load: HS 20,  Features Intersected: MILL CR,  Facility Carried by Structure: CH 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 813117,  Location: 0.2 MI W 104TH ST (Lat: 41.354983,  Lng: -90.470317),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 25 (year 2010),  Truck Traffic: 40%,  Average Future Daily Traffic: 25 (year 2040),  Design Load: HS 20,  Features Intersected: BR. CASE CREEK,  Facility Carried by Structure: 162ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.028,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 813119,  Location: .25 MI. S. CH 67 (Lat: 41.364469,  Lng: -90.491619),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Future Daily Traffic: 25 (year 2040),  Design Load: HS 20,  Features Intersected: CASE CREEK,  Facility Carried by Structure: 81ST ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: 815006,  Location: 0.9 MILES N SHERRARD (Lat: 41.338786,  Lng: -90.511350),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,350 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,900 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH OF MILL CREEK,  Facility Carried by Structure: 63 STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.589,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019
Find on map >>   Show street view

Structure Number: 815019,  Location: 7.0 MI S OF MILAN (Lat: 41.341569,  Lng: -90.551936),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,100 (year 2040),  Design Load: HS 20,  Features Intersected: S BR MILL CR,  Facility Carried by Structure: CH 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.720,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Sherrard, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.