Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Seaford, Delaware (DE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 259ft / 79.4mTotal length
  • $13,510,000Total costs
  • 164,125Total average daily traffic
  • 12,551Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Seaford
  • No street view available for this location

New bridges in Seaford, DE - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 31940-1949
  • 71950-1959
  • 11960-1969
  • 21970-1979
  • 41980-1989
  • 21990-1999
Reconstructed bridges in Seaford, DE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 51990-1999
Average Bridge Daily Traffic in Seaford, DE
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 40.0%Good
  • 60.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.6%Good
  • 70.6%Satisfactory
  • 11.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 64.7%Satisfactory
  • 35.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 35.3%Very good
  • 29.4%Good
  • 29.4%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 3151 013,  Location: SEAFORD (Lat: 38.640344,  Lng: -75.609025),  Route carried "on" structure: County highway 13,  Year Built: 1926,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.15m (20.18ft),  Average Daily Traffic: 13,698 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,010 (year 2038),  Design Load: H 20,  Features Intersected: NANTICOKE RIVER,  Facility Carried by Structure: FRONT ST
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 21.530,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Navigation Control: Yes ( Vertical Clearance: 1.0m (3.3ft), Horizontal Clearance: 12.0m (39.4ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 14.8m (48.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 16.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.15m (20.18ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Critical Feature Inspection Date: May 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $756,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 3202 013,  Location: NORTH SEAFORD LIMITS (Lat: 38.679161,  Lng: -75.593106),  Route carried "on" structure: Alternate US 13,  Year Built: 1919,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 4,507 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 5,601 (year 2042),  Design Load: H 20,  Features Intersected: CLEAR BROOK,  Facility Carried by Structure: BRIDGEVILLE HGWY
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 26.184,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 3215 536,  Location: S.W. OF SEAFORD (Lat: 38.622017,  Lng: -75.643697),  Route carried "on" structure: County highway 536,  Year Built: 1975,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 652 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 810 (year 2042),  Design Load: HS 20,  Features Intersected: BUTLER MILL BRANCH,  Facility Carried by Structure: WOODLAND RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 2.816,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3216 536,  Location: S.W. OF SEAFORD (Lat: 38.621094,  Lng: -75.637550),  Route carried "on" structure: County highway 536,  Year Built: 1966,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 1,274 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,583 (year 2043),  Design Load: HS 20,  Features Intersected: CHAPEL BRANCH,  Facility Carried by Structure: WOODLAND RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 3.364,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3217 542A,  Location: WEST OF SEAFORD (Lat: 38.627497,  Lng: -75.646328),  Route carried "on" structure: County highway 542A,  Year Built: 1973,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 302 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 375 (year 2043),  Design Load: HS 20,  Features Intersected: CRAIGS POND SPILLWAY,  Facility Carried by Structure: CRAIGS MILL RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.2m (20.3ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 3235 525,  Location: N.E.OF SEAFORD (Lat: 38.687117,  Lng: -75.548142),  Route carried "on" structure: County highway 525,  Year Built: 1983,  Status: Open,  Structure Length: 1.84m (6.04ft),  Average Daily Traffic: 2,600 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,231 (year 2043),  Design Load: HS 20,  Features Intersected: GRAVELLY FORK,  Facility Carried by Structure: COVERDALE RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.170,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3237 046,  Location: EAST OF SEAFORD (Lat: 38.665561,  Lng: -75.565250),  Route carried "on" structure: County highway 46,  Year Built: 1919,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 5,208 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,473 (year 2042),  Features Intersected: NANTICOKE RIVER,  Facility Carried by Structure: OLD FURNACE RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.860,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $208,000
Find on map >>   Show street view

Structure Number: 3238 046,  Location: N.E. OF SEAFORD (Lat: 38.664783,  Lng: -75.563511),  Route carried "on" structure: County highway 46,  Year Built: 1999,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 5,208 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,473 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: GRAVELLY FORK,  Facility Carried by Structure: OLD FURNACE RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 5.020,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3241 534,  Location: EAST OF SEAFORD (Lat: 38.656714,  Lng: -75.584364),  Route carried "on" structure: County highway 534,  Year Built: 1994,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 5,483 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,814 (year 2043),  Design Load: HS 25 or greater,  Features Intersected: WILLIAMS POND,  Facility Carried by Structure: THARP RD.
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3242 535,  Location: SEAFORD (Lat: 38.642322,  Lng: -75.606653),  Route carried "on" structure: County highway 535,  Year Built: 1954,  Status: Open,  Structure Length: 4.22m (13.85ft),  Average Daily Traffic: 7,099 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,823 (year 2043),  Design Load: HS 20,  Features Intersected: TRIB. OF NANTICOKE RIVER,  Facility Carried by Structure: MIDDLEFORD RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.210,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3251 524,  Location: CONCORD POND (Lat: 38.643153,  Lng: -75.554067),  Route carried "on" structure: County highway 524,  Year Built: 1980,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 4,988 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,199 (year 2043),  Design Load: HS 20,  Features Intersected: CONCORD POND SPILLWAY,  Facility Carried by Structure: GERMAN RD
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.435,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3253N003,  Location: S/E OF SEAFORD (Lat: 38.650222,  Lng: -75.594058),  Route carried "on" structure: US 13,  Year Built: 1952,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 18,967 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,574 (year 2042),  Design Load: HS 20,  Features Intersected: WILLIAMS POND
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 3253S003,  Location: EAST OF SEAFORD (Lat: 38.650206,  Lng: -75.594322),  Route carried "on" structure: US 13,  Year Built: 1952,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 3.19m (10.47ft),  Average Daily Traffic: 18,967 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,574 (year 2042),  Design Load: HS 20,  Features Intersected: WILLIAMS POND
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.6m (34.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 3254N003,  Location: S/W SEAFORD (Lat: 38.643286,  Lng: -75.593525),  Route carried "on" structure: US 13,  Year Built: 1951,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 9.99m (32.78ft),  Average Daily Traffic: 17,415 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 21,645 (year 2042),  Design Load: HS 20,  Features Intersected: NANTICOKE RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.310,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 3.4m (11.2ft), Horizontal Clearance: 13.7m (44.9ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3254S003,  Location: S/W SEAFORD (Lat: 38.643272,  Lng: -75.593794),  Route carried "on" structure: US 13,  Year Built: 1951,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 9.99m (32.78ft),  Average Daily Traffic: 17,415 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,645 (year 2042),  Design Load: HS 20,  Features Intersected: NANTICOKE RIVER
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 3.4m (11.2ft), Horizontal Clearance: 13.7m (44.9ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3255 003,  Location: NORTH OF SEAFORD (Lat: 38.678794,  Lng: -75.591606),  Route carried "on" structure: US 13,  Year Built: 1952,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 18,153 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,562 (year 2043),  Design Load: HS 20,  Features Intersected: CLEAR BROOK
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 4.240,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 3256 535B,  Location: SEAFORD (Lat: 38.642958,  Lng: -75.605511),  Route carried "on" structure: County highway 535B,  Year Built: 1954,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,153 (year 2043),  Design Load: H 20,  Features Intersected: WILLIAMS POND
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 64.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3257E021,  Location: SEAFORD (Lat: 38.646381,  Lng: -75.618050),  Route carried "on" structure: State highway 20,  Year Built: 1940,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 17.07m (56.00ft),  Average Daily Traffic: 6,968 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,660 (year 2043),  Design Load: H 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.982,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 20,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.07m (56.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,374,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $3,562,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 3257W021,  Location: SEAFORD (Lat: 38.646492,  Lng: -75.618106),  Route carried "on" structure: State highway 20,  Year Built: 1985,  Status: Open,  Structure Length: 7.47m (24.51ft),  Average Daily Traffic: 6,968 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,660 (year 2043),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.982,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.47m (24.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $923,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,384,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3258 536,  Location: SEAFORD (Lat: 38.639844,  Lng: -75.614975),  Route carried "on" structure: County highway 536,  Year Built: 1941,  Status: Open,  Structure Length: 3.10m (10.17ft),  Average Daily Traffic: 7,127 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,858 (year 2042),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: HIGH ST
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 7.400,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 3257E021,  Location: SEAFORD (Lat: 38.646381,  Lng: -75.618050),  Route carried "under" structure: City street ,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 99 (year 2020),  Truck Traffic: 11%,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: STEIN HWY/SR20
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 0.500,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 3257W021,  Location: SEAFORD (Lat: 38.646492,  Lng: -75.618106),  Route carried "under" structure: City street ,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 99 (year 2020),  Truck Traffic: 9%,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: STEIN HWY/SR20
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 0.500,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Discuss Seaford, Delaware (DE) on our hugely popular Delaware forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.