Bridge Statistics for Salem, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 230ft / 69.8mTotal length
  • $10,350,000Total costs
  • 55,950Total average daily traffic
  • 3,968Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Salem
  • No street view available for this location

New bridges in Salem, WV - historical statistics
  • New bridges - historical statistics
  • 51910-1919
  • 31920-1929
  • 11930-1939
  • 11950-1959
  • 51960-1969
  • 11970-1979
  • 11980-1989
  • 51990-1999
  • 22000-2009
  • 32010-2019
Average Bridge Daily Traffic in Salem, WV
Average Bridge Truck Traffic in Salem, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.7%Good
  • 8.3%Satisfactory
  • 8.3%Fair
  • 16.7%Poor
  • 25.0%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 31.8%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 22.7%Poor
  • 9.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 15.0%Good
  • 20.0%Satisfactory
  • 25.0%Fair
  • 15.0%Poor
  • 5.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.2%Very good
  • 37.5%Good
  • 16.7%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
  • 4.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 50.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 9A065,  Location: 0.02 MI WEST CO RT 15 (Lat: 39.227461,  Lng: -80.603711),  Route carried "on" structure: County highway 4600,  Year Built: 1918,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 90%,  Average Future Daily Traffic: 65 (year 2041),  Features Intersected: BUCKEYE CREEK,  Facility Carried by Structure: DODDRIDGE CO RT 46
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.874,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $192,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 9A067,  Location: 0.07 MI EAST CO RT 15 (Lat: 39.230089,  Lng: -80.588131),  Route carried "on" structure: County highway 4800,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,165 (year 2041),  Features Intersected: BUCKEYE CREEK,  Facility Carried by Structure: DODDRIDGE CO RT 48
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $463,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9A073,  Location: 0.04 MI WEST DODD CO RT 9 (Lat: 39.293411,  Lng: -80.632619),  Route carried "on" structure: County highway 5029,  Year Built: 1930,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 800 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 975 (year 2041),  Features Intersected: TARKILN RUN,  Facility Carried by Structure: DODD CO RT 50/29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $217,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $478,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9A087,  Location: 0.01 MI WEST WV RT 23 (Lat: 39.351689,  Lng: -80.575100),  Route carried "on" structure: County highway 5517,  Year Built: 1965,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 18 (year 2041),  Features Intersected: ROBINSON FORK,  Facility Carried by Structure: DODDRIDGE CR 55/17
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $468,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 9A097,  Location: 0.01 MI WEST WV RT 23 (Lat: 39.330869,  Lng: -80.578919),  Route carried "on" structure: County highway 5505,  Year Built: 1991,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 13 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ROBINSON FORK,  Facility Carried by Structure: DODDRIDGE CR 55/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9A105,  Location: 0.10 MILES WEST WV RT 23 (Lat: 39.341000,  Lng: -80.576681),  Route carried "on" structure: County highway 5518,  Year Built: 1998,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 65 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ROBINSON FORK,  Facility Carried by Structure: DODDRIDGE CO 55/18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9A111,  Location: 0.07 MILES EAST CO RT 17 (Lat: 39.239269,  Lng: -80.620381),  Route carried "on" structure: County highway 1500,  Year Built: 1999,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 450 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: GREENBRIER FORK,  Facility Carried by Structure: DODDRIDGE CO RT 15
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.171,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9A136,  Location: 0.01 mi W Dodd. Co. 55/20 (Lat: 39.328531,  Lng: -80.579261),  Route carried "on" structure: State highway 23,  Year Built: 2018,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 1,500 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,825 (year 2038),  Design Load: HL 93,  Features Intersected: Robinson Fork
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.446,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.4m (47.2ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A024,  Location: 0.01 MI WEST CO RT 5/4 (Lat: 39.335219,  Lng: -80.508469),  Route carried "on" structure: County highway 56,  Year Built: 1920,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 140 (year 2041),  Design Load: H 10,  Features Intersected: BRANCH OF GRASS RUN,  Facility Carried by Structure: HARRISON CO RT 5/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.474,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Superstructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $453,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17A027,  Location: 0.08 MI SOUTH CO RT 5/6 (Lat: 39.333700,  Lng: -80.517600),  Route carried "on" structure: County highway 508,  Year Built: 1920,  Status: Posted for load,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 13 (year 2041),  Features Intersected: GRASS RUN,  Facility Carried by Structure: HARRISON CO RT 5/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.026,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.2m (20.3ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $411,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17A159,  Location: 0.28 MI NORTH CO RT 29/2 (Lat: 39.260639,  Lng: -80.563219),  Route carried "on" structure: County highway 2900,  Year Built: 1910,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,875 (year 2038),  Features Intersected: PATTERSON FORK,  Facility Carried by Structure: HARRISON CO RT 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $437,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A16,  Location: 0.19 MI NORTH CO RT 29/1 (Lat: 39.276439,  Lng: -80.556939),  Route carried "on" structure: County highway 2900,  Year Built: 1994,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,875 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PATTERSON FORK,  Facility Carried by Structure: HARRISON CO RT 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.396,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A185,  Location: 0.30 MI EAST CO RT 50/6 (Lat: 39.290150,  Lng: -80.518589),  Route carried "on" structure: US 5000,  Year Built: 1966,  Status: Open,  Structure Length: 15.80m (51.84ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,300 (year 2041),  Design Load: HS 20,  Features Intersected: Salem Fork, Rails Trails,  Facility Carried by Structure: US ROUTE 50 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.065,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 5,  Length of Maximum Span: 25.8m (84.6ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.82m (51.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,994,000,  Roadway Improvement Cost: $724,000,  Total Project Cost: $2,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A186,  Location: 0.30 MI EAST CO RT 50/6 (Lat: 39.290050,  Lng: -80.518431),  Route carried "on" structure: US 5000,  Year Built: 1981,  Status: Open,  Structure Length: 18.95m (62.17ft),  Average Daily Traffic: 12,450 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,300 (year 2038),  Design Load: HS 20,  Features Intersected: Salem Fork, Pvt Dr, Trai,  Facility Carried by Structure: US ROUTE 50 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.065,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 7,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.96m (62.20ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $916,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $1,204,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A212,  Location: 0.07 MI SOUTH CO RT 50/62 (Lat: 39.286881,  Lng: -80.524319),  Route carried "on" structure: County highway 5006,  Year Built: 1915,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 130 (year 2038),  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO 50/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.325,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $381,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A213,  Location: 0.02 MI NORTH US RT 50 (Lat: 39.292739,  Lng: -80.513831),  Route carried "on" structure: County highway 5007,  Year Built: 1966,  Status: Open,  Structure Length: 2.67m (8.76ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 850 (year 2038),  Design Load: HS 20,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO 50/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $328,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17A214,  Location: 0.03 MI SOUTH CO RT 5/7 (Lat: 39.312189,  Lng: -80.507111),  Route carried "on" structure: County highway 5007,  Year Built: 1919,  Status: Posted for load,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 13 (year 2038),  Features Intersected: INDIAN RUN,  Facility Carried by Structure: HARRISON CO 50/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.283,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Superstructure: Poor,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $142,000,  Total Project Cost: $478,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 17A215,  Location: 0.16 MI NORTH CO RT 53 (Lat: 39.279139,  Lng: -80.511931),  Route carried "on" structure: County highway 5008,  Year Built: 1965,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 800 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,100 (year 2041),  Features Intersected: HALLS RUN,  Facility Carried by Structure: HARRISON CR 50/8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.327,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $378,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 17A221,  Location: 0.35 MI EAST CO RT 50/6 (Lat: 39.287889,  Lng: -80.518400),  Route carried "on" structure: County highway 5062,  Year Built: 1978,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CR 50/62
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $163,000,  Total Project Cost: $454,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 17A273,  Location: 0.02 MI WEST CO RT 50/3 (Lat: 39.290611,  Lng: -80.528450),  Route carried "on" structure: County highway 5053,  Year Built: 1922,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: CHERRY CAMP RUN,  Facility Carried by Structure: HARRISON CO 50/53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $261,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A295,  Location: 0.07 MI SOUTH CO RT 50/73 (Lat: 39.280919,  Lng: -80.555219),  Route carried "on" structure: County highway 2900,  Year Built: 1996,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,875 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO RT 29
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.039,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2020
Find on map >>   Show street view

Structure Number: 17A308,  Location: 0.05 MI SOUTH CO RT 50/73 (Lat: 39.288100,  Lng: -80.537181),  Route carried "on" structure: County highway 5002,  Year Built: 2000,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 50 (year 2017),  Average Future Daily Traffic: 65 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARR CO RT 50/2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17A31,  Location: 0.04 MI SOUTH HRR 50/73 (Lat: 39.279719,  Lng: -80.553500),  Route carried "on" structure: County highway 5081,  Year Built: 2000,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 50 (year 2017),  Average Future Daily Traffic: 70 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SALEM FORK,  Facility Carried by Structure: HARRISON CO 50/81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2019
Find on map >>   Show street view

Structure Number: 17A359,  Location: 0.43 mi W of Har Co 50/3 (Lat: 39.289981,  Lng: -80.535811),  Route carried "on" structure: US 50,  Year Built: 2019,  Status: Open,  Structure Length: 5.42m (17.78ft),  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,450 (year 2038),  Design Load: HL 93,  Features Intersected: WV 23 WB (Wye)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.423,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A36,  Location: 0.43 mi W Hrr Rt 50/3 (Lat: 39.290131,  Lng: -80.535819),  Route carried "on" structure: US 50,  Year Built: 2019,  Status: Open,  Structure Length: 5.42m (17.78ft),  Average Daily Traffic: 9,500 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,450 (year 2038),  Design Load: HL 93,  Features Intersected: WV 23 (wye)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.423,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17A916,  Location: 0.01 MI WEST WV RT 23 (Lat: 39.283269,  Lng: -80.559139),  Route carried "on" structure: City street N1430,  Year Built: 1910,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 250 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 340 (year 2041),  Features Intersected: JACOBS RUN,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Channel: Serious,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17A185,  Location: 0.30 MI EAST CO RT 50/6 (Lat: 39.290150,  Lng: -80.518589),  Route carried "under" structure: Other road ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 10 (year 0020),  Features Intersected: Salem Fork, Rails Trails,  Facility Carried by Structure: US ROUTE 50 EB
Minimum Vertical Clearance: 7.67m (25.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Length of Maximum Span: 25.8m (84.6ft)