Bridge Statistics for Rubicon, Wisconsin (WI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 72ft / 22.2mTotal length
  • $1,334,000Total costs
  • 15,800Total average daily traffic
  • 769Total average daily truck traffic
  • 17,161Total future (year 2038) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rubicon
  • No street view available for this location

New bridges in Rubicon, WI - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11960-1969
  • 31970-1979
  • 21980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Rubicon, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 40.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
  • 20.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Very good
  • 40.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 30.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 20.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 54.5%Very good
  • 36.4%Good
  • 9.1%Satisfactory
Find on map >>   Show street view

Structure Number: B140016,  Location: 1.5M E JCT CTH P (Lat: 43.311053,  Lng: -88.429931),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 2.09m (6.86ft),  Average Daily Traffic: 264 (year 2019),  Average Future Daily Traffic: 290 (year 2040),  Design Load: H 15,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD POND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.53m (8.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $315,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B140082,  Location: 0.5M N JCT CTH NN (Lat: 43.299156,  Lng: -88.478878),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 176 (year 2019),  Average Future Daily Traffic: 193 (year 2039),  Design Load: H 20,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD JEFFERSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B140085,  Location: 0.3M N JCT STH 60 (Lat: 43.329167,  Lng: -88.428769),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 233 (year 2019),  Average Future Daily Traffic: 256 (year 2040),  Design Load: H 20,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD GOODLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $136,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $205,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B140094,  Location: 1.1M E JCT CTH P (Lat: 43.288361,  Lng: -88.441592),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 2.05m (6.73ft),  Average Daily Traffic: 115 (year 2019),  Average Future Daily Traffic: 126 (year 2039),  Design Load: H 20,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD RESTHAVEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.0m (65.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B140107,  Location: 0.3M N JCT STH 60 (Lat: 43.333411,  Lng: -88.515133),  Route carried "on" structure: State highway 67,  Year Built: 1993,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 2,700 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,400 (year 2040),  Design Load: HS 20,  Features Intersected: HEPP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B140129,  Location: 0.7M N JCT CTH NN (Lat: 43.292922,  Lng: -88.458958),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 2,954 (year 2019),  Average Future Daily Traffic: 3,249 (year 2039),  Design Load: HS 20,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: CTH P
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B140181,  Location: 1.4M E JCT CTH P (Lat: 43.325389,  Lng: -88.429914),  Route carried "on" structure: State highway 60,  Year Built: 2007,  Status: Open,  Structure Length: 2.92m (9.58ft),  Average Daily Traffic: 8,600 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,800 (year 2040),  Design Load: HS 20,  Features Intersected: RUBICON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B140212,  Location: 1.1M E JCT CTH P (Lat: 43.300711,  Lng: -88.438306),  Route carried "on" structure: City street ,  Year Built: 2018,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 180 (year 2038),  Design Load: HL 93,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD SAYLESVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $218,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $327,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P140102,  Location: 0.5M W JCT CTH R (Lat: 43.370975,  Lng: -88.585306),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 58 (year 2019),  Average Future Daily Traffic: 63 (year 2039),  Design Load: H 20,  Features Intersected: WILDCAT CREEK,  Facility Carried by Structure: LRD PERCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P140107,  Location: 0.9M N JCT CTH N (Lat: 43.354564,  Lng: -88.433997),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.36m (4.46ft),  Average Daily Traffic: 527 (year 2019),  Average Future Daily Traffic: 579 (year 2040),  Design Load: H 20,  Features Intersected: BUTLER CREEK,  Facility Carried by Structure: CTH NP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.3m (43.6ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Channel: Very good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $160,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $240,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P140109,  Location: 0.9M W JCT STH 67 (Lat: 43.312064,  Lng: -88.536408),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 23 (year 2019),  Average Future Daily Traffic: 25 (year 2039),  Design Load: H 20,  Features Intersected: RUBICON RIVER,  Facility Carried by Structure: LRD HALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $247,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous