Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Royalton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 167ft / 51.3mTotal length
  • $32,664,000Total costs
  • 21,500Total average daily traffic
  • 1,676Total average daily truck traffic
  • 25,727Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Royalton
  • No street view available for this location

New bridges in Royalton, NY - historical statistics
  • New bridges - historical statistics
  • 41910-1919
  • 11930-1939
  • 11940-1949
  • 41950-1959
  • 41960-1969
  • 21980-1989
  • 21990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Royalton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 21970-1979
  • 31980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Royalton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 60.0%Good
  • 26.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.8%Very good
  • 37.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 43.8%Good
  • 18.8%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.3%Excellent
  • 26.1%Very good
  • 30.4%Good
  • 30.4%Satisfactory
  • 8.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Excellent
  • 14.3%Very good
  • 57.1%Satisfactory
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: 103012,  Location: 2.5 MI E JCT SH 31 & SH77 (Lat: 43.173103,  Lng: -78.597989),  Route carried "on" structure: State highway 77,  Year Built: 1918,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,624 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,640 (year 2040),  Features Intersected: EIGHTEEN MILE CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.017,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $336,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $533,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103474,  Location: 7.7 MI NW AKRON VILLAGE (Lat: 43.111303,  Lng: -78.558106),  Route carried "on" structure: State highway 93,  Year Built: 1933,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,885 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,903 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.741,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $649,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $1,030,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103475,  Location: JCT RT 93 + TONAWANDA CR (Lat: 43.089639,  Lng: -78.518550),  Route carried "on" structure: State highway 93,  Year Built: 1960,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 1,885 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,903 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: TONAWANDA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.956,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.6m (80.7ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $1,961,000,  Roadway Improvement Cost: $1,149,000,  Total Project Cost: $3,110,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221349,  Location: 2.0 MI W OF MIDDLEPORT (Lat: 43.216286,  Lng: -78.512306),  Route carried "on" structure: Other road ,  Year Built: 1966,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 366 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 512 (year 2038),  Design Load: HS 20,  Features Intersected: JOHNSON CREEK,  Facility Carried by Structure: TOWNLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $295,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221359,  Location: 2.0 MI. SW OF GASPORT (Lat: 43.175833,  Lng: -78.596603),  Route carried "on" structure: Other road ,  Year Built: 1989,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 597 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 836 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $344,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $546,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22136,  Location: 2.6 MI. E OF RAPIDS (Lat: 43.109289,  Lng: -78.602789),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 247 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 346 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TRIB MUD CREEK,  Facility Carried by Structure: SIMMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $440,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221361,  Location: 1.6 MI. S OF MIDDLEPORT (Lat: 43.183553,  Lng: -78.477556),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 155 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 217 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: OAK ORCHARD CREEK,  Facility Carried by Structure: FREEMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.234,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $342,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22573,  Location: GASPORT EAST (Lat: 43.198314,  Lng: -78.563681),  Route carried "on" structure: Other road ,  Year Built: 1959,  Status: Posted for load,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 235 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 329 (year 2038),  Design Load: H 20,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: EAST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 227036,  Location: 1 MI S of MIDDLEPORT (Lat: 43.193819,  Lng: -78.475944),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 453 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 634 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: Oak Orchard Creek,  Facility Carried by Structure: Mountain Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.286,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $431,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $684,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332891,  Location: 1.7 MI SOUTH OF DYSINGER (Lat: 43.109594,  Lng: -78.567878),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 511 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 715 (year 2036),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: BLOCK CHURCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $908,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332904,  Location: 1.4 MI SE OF WOLCOTTSVLLE (Lat: 43.105361,  Lng: -78.497717),  Route carried "on" structure: Other road ,  Year Built: 1947,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 742 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,039 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: DITCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $450,000,  Total Project Cost: $1,219,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332912,  Location: 1.6 MI SOUTH OF GASPORT (Lat: 43.176008,  Lng: -78.574567),  Route carried "on" structure: County highway ,  Year Built: 1916,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 3,376 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,409 (year 2040),  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: GASPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.698,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $551,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332914,  Location: 1.4 MI E OF WALCOTTSVILLE (Lat: 43.126533,  Lng: -78.497139),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 885 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,239 (year 2036),  Design Load: HL 93,  Features Intersected: TRIB MUD CREEK,  Facility Carried by Structure: GRISWOLD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $352,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332935,  Location: .3 MI E OF WOLCOTTSVILLE (Lat: 43.121858,  Lng: -78.514014),  Route carried "on" structure: Other road ,  Year Built: 1952,  Year Reconstructed: 1985,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 97 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 136 (year 2036),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: MANN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $753,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332937,  Location: 3.4 MI W OF WOLCOTTSVILLE (Lat: 43.112772,  Lng: -78.585192),  Route carried "on" structure: Other road ,  Year Built: 1951,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 55 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 77 (year 2038),  Features Intersected: MUD CREEK,  Facility Carried by Structure: MILLER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 95.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $521,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 332951,  Location: 1.5 MILES EAST OF RAPIDS (Lat: 43.097275,  Lng: -78.606472),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 244 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 342 (year 2036),  Design Load: H 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: RIDDLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $624,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $989,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332956,  Location: 2.2 MILES NE OF RAPIDS (Lat: 43.108944,  Lng: -78.595978),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 247 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 346 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: MUD CREEK,  Facility Carried by Structure: SIMMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $576,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $914,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 332957,  Location: 1 MILE NE OF GASPORT (Lat: 43.208319,  Lng: -78.565669),  Route carried "on" structure: County highway ,  Year Built: 1966,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,463 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,048 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: EIGHTEEN MILE CRK,  Facility Carried by Structure: SLAYTON SETTMT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $222,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $352,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336008,  Location: .1 MI E OF WALCOTTSVILLE (Lat: 43.120294,  Lng: -78.517972),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 429 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 601 (year 2036),  Features Intersected: MUD CREEK,  Facility Carried by Structure: ROYALTON CTR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.411,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.4m (17.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $703,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 445403,  Location: .8 MI W JCT SH271 & CANAL (Lat: 43.213203,  Lng: -78.490233),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 2,034 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,848 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ERIE CANAL, NORTH TOW PA,  Facility Carried by Structure: CARMEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.16m (26.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,642,000,  Roadway Improvement Cost: $1,547,000,  Total Project Cost: $4,190,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 445406,  Location: 4 MI W JCT SH271 & CANAL (Lat: 43.206847,  Lng: -78.545997),  Route carried "on" structure: County highway ,  Year Built: 1911,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 5.85m (19.19ft),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: ERIE CANAL, NORTH TOW PA,  Facility Carried by Structure: SLAYTON SETTMT RD
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Navigation Control: Yes ( Vertical Clearance: 5.1m (16.7ft), Horizontal Clearance: 22.8m (74.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Very good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,077,000,  Roadway Improvement Cost: $1,216,000,  Total Project Cost: $3,293,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 445408,  Location: IN GASPORT (Lat: 43.199700,  Lng: -78.575839),  Route carried "on" structure: County highway ,  Year Built: 1913,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 2,438 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,462 (year 2040),  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: GASPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Navigation Control: Yes ( Vertical Clearance: 4.5m (14.8ft), Horizontal Clearance: 28.3m (92.8ft)),  Material/Design: Steel,  Design/Construction: Movable - Lift,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $3,696,000,  Roadway Improvement Cost: $2,164,000,  Total Project Cost: $5,860,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 445409,  Location: 1 MILE WEST OF GASPORT (Lat: 43.197814,  Lng: -78.596042),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 1,532 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,145 (year 2037),  Design Load: HS 20,  Features Intersected: ERIE CANAL, NORTH TOW PA,  Facility Carried by Structure: ORANGEPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Navigation Control: Yes ( Vertical Clearance: 4.8m (15.7ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.7m (136.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.86m (29.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,968,000,  Roadway Improvement Cost: $1,738,000,  Total Project Cost: $4,706,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Discuss Royalton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.