Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ripley, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 394ft / 120mTotal length
  • $42,756,000Total costs
  • 161,229Total average daily traffic
  • 27,312Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ripley
  • No street view available for this location

New bridges in Ripley, WV - historical statistics
  • New bridges - historical statistics
  • 41920-1929
  • 11940-1949
  • 21950-1959
  • 101960-1969
  • 21970-1979
  • 41980-1989
  • 81990-1999
  • 22000-2009
  • 52010-2019
  • 12020-2022
Reconstructed bridges in Ripley, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in Ripley, WV
Average Bridge Truck Traffic in Ripley, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 61.1%Good
  • 8.3%Satisfactory
  • 19.4%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 63.9%Good
  • 13.9%Satisfactory
  • 11.1%Fair
  • 8.3%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 58.3%Good
  • 11.1%Satisfactory
  • 19.4%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Good
  • 13.3%Satisfactory
  • 10.0%Fair
  • 6.7%Poor
  • 3.3%Serious
Find on map >>   Show street view

Structure Number: 18A016,  Location: 0.34 MI. S. OF CR 5/7 (Lat: 38.826861,  Lng: -81.728511),  Route carried "on" structure: County highway 510,  Year Built: 1988,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 211 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 287 (year 2037),  Design Load: HS 20,  Features Intersected: CLAYLICK RUN,  Facility Carried by Structure: COUNTY ROUTE 5/10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $700,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A053,  Location: 0.09 M SOUTH OF CR 21/26 (Lat: 38.775881,  Lng: -81.724131),  Route carried "on" structure: County highway 15,  Year Built: 1963,  Status: Posted for load,  Structure Length: 7.98m (26.18ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 417 (year 2038),  Design Load: HS 15,  Features Intersected: Branch of Cox Fk & I-77
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.289,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.92m (25.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $750,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18A073,  Location: 0.02 MI. N. CR. 21/22 (Lat: 38.824319,  Lng: -81.707161),  Route carried "on" structure: County highway 21,  Year Built: 1925,  Status: Posted for load,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 6,400 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,000 (year 2038),  Design Load: HS 15,  Features Intersected: SYCAMORE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.617,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Poor,  Channel: Poor,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A074,  Location: 0.06 MI SOUTH OF CR 21/20 (Lat: 38.844600,  Lng: -81.699631),  Route carried "on" structure: County highway 21,  Year Built: 1925,  Year Reconstructed: 1932,  Status: Open,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 3,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,510 (year 2039),  Features Intersected: LEFT FORK SYCAMORE CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.0m (26.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A075,  Location: 0.64 MI. S. CR.12 (Lat: 38.878939,  Lng: -81.689239),  Route carried "on" structure: County highway 21,  Year Built: 1925,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 3,900 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,875 (year 2038),  Features Intersected: MUD RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.618,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $2,000,000,  Total Project Cost: $3,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A088,  Location: 0.01 M SOUTH OF C.R. 5/13 (Lat: 38.831681,  Lng: -81.672900),  Route carried "on" structure: County highway 2122,  Year Built: 1996,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 774 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SYCAMORE CREEK,  Facility Carried by Structure: COUNTY ROUTE 21/22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.573,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.1m (46.3ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A089,  Location: 0.09 MI. S. OF CR. 21/39 (Lat: 38.836061,  Lng: -81.672731),  Route carried "on" structure: County highway 2122,  Year Built: 1977,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 774 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SYCAMORE CREEK,  Facility Carried by Structure: COUNTY ROAD 21/22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.246,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $500,000,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 18A091,  Location: 0.04 MILE SOUTH OF CR 21 (Lat: 38.753081,  Lng: -81.689089),  Route carried "on" structure: County highway 2127,  Year Built: 1994,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 81 (year 2017),  Average Future Daily Traffic: 110 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: GRASSLICK RUN,  Facility Carried by Structure: COUNTY ROUTE 21/27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.773,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A108,  Location: 1.03 MILE SOUTH OF CR 21 (Lat: 38.799719,  Lng: -81.692019),  Route carried "on" structure: County highway 25,  Year Built: 1922,  Year Reconstructed: 1987,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 2,400 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,480 (year 2039),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.658,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 5.6m (18.4ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.64m (18.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $671,000,  Roadway Improvement Cost: $649,000,  Total Project Cost: $1,320,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 18A113,  Location: 1.05 MILE EAST OF US 33 (Lat: 38.806450,  Lng: -81.636139),  Route carried "on" structure: County highway 26,  Year Built: 1994,  Status: Open,  Structure Length: 2.91m (9.55ft),  Average Daily Traffic: 1,000 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,260 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: LITTLE MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $850,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A117,  Location: 0.03 MI WEST OF CR 30/5 (Lat: 38.793950,  Lng: -81.770911),  Route carried "on" structure: County highway 30,  Year Built: 1971,  Status: Posted for load,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 750 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 945 (year 2038),  Features Intersected: PARCHMENT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Serious,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,500,000 ( Estimate for 2016),  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 18A118,  Location: 0.01 MILE WEST CR 5/25 (Lat: 38.782681,  Lng: -81.748119),  Route carried "on" structure: County highway 30,  Year Built: 1950,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 290 (year 2039),  Design Load: HS 20,  Features Intersected: GRASS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.196,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $600,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A124,  Location: 0.30 M SOUTH OF CR 32 (Lat: 38.784081,  Lng: -81.773650),  Route carried "on" structure: County highway 321,  Year Built: 1980,  Status: Posted for load,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 10 (year 2018),  Average Future Daily Traffic: 12 (year 2038),  Design Load: H 20,  Features Intersected: ROUNDKNOB RUN,  Facility Carried by Structure: COUNTY ROUTE 32/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.168,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $21,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 18A127,  Location: 0.13 MI. W. OF CR. 5/9 (Lat: 38.820611,  Lng: -81.726189),  Route carried "on" structure: US 33,  Year Built: 1967,  Status: Open,  Structure Length: 4.95m (16.24ft),  Average Daily Traffic: 6,200 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 7,936 (year 2039),  Design Load: HS 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.475,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 18A162,  Location: 5.45 MI N OF CR 21 (Lat: 38.820081,  Lng: -81.727700),  Route carried "on" structure: Interstate 77,  Year Built: 1964,  Status: Open,  Structure Length: 4.01m (13.16ft),  Average Daily Traffic: 9,550 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 13,657 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: US Route 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.912,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.7m (64.6ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,500,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 18A163,  Location: 5.49 MI N OF CR 21 (Lat: 38.819989,  Lng: -81.727961),  Route carried "on" structure: Interstate 77,  Year Built: 1964,  Status: Open,  Structure Length: 4.01m (13.16ft),  Average Daily Traffic: 12,850 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 17,605 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: US Route 33
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.912,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.6m (64.3ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,500,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 18A164,  Location: 3.04 MILE NORTH OF US 33 (Lat: 38.859481,  Lng: -81.735169),  Route carried "on" structure: Interstate 77,  Year Built: 1965,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 9,700 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 13,289 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 12/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.789,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,200,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 18A165,  Location: 3.04 MILE NORTH OF US 33 (Lat: 38.859439,  Lng: -81.735411),  Route carried "on" structure: Interstate 77,  Year Built: 1965,  Status: Open,  Structure Length: 3.40m (11.15ft),  Average Daily Traffic: 9,700 (year 2018),  Truck Traffic: 23%,  Average Future Daily Traffic: 13,289 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 12/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 226.789,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $2,200,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 18A193,  Location: 0.08 M WEST OF CR 21 (Lat: 38.809469,  Lng: -81.705039),  Route carried "on" structure: County highway 151,  Year Built: 1980,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 100 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: COUNTY ROUTE 15/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.13m (20.11ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A194,  Location: 0.06 MI EAST OF CR 21 (Lat: 38.837181,  Lng: -81.700031),  Route carried "on" structure: County highway 2121,  Year Built: 1981,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 58 (year 2039),  Design Load: H 20,  Features Intersected: LT FK SYCAMORE CREEK,  Facility Carried by Structure: CR 21/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $15,000,  Total Project Cost: $15,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 18A217,  Location: 0.22 MILE EAST OF WV 87 (Lat: 38.812689,  Lng: -81.788089),  Route carried "on" structure: County highway 30,  Year Built: 1997,  Status: Open,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 750 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 945 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: ISAACS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A22,  Location: 0.24 MILE N OF CR 15/6 (Lat: 38.757661,  Lng: -81.737450),  Route carried "on" structure: County highway 15,  Year Built: 1998,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 567 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: PARCHMENT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.344,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.5m (70.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A221,  Location: 0.17 MILE SOUTH OF CR 30 (Lat: 38.771061,  Lng: -81.737081),  Route carried "on" structure: County highway 15,  Year Built: 1998,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 422 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 550 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: COX FORK OF PARCHMENT CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.905,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,300,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A224,  Location: 0.01 MILE EAST OF WV 87 (Lat: 38.813711,  Lng: -81.790150),  Route carried "on" structure: County highway 8719,  Year Built: 1999,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 20 (year 2017),  Average Future Daily Traffic: 28 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ISAACS RUN,  Facility Carried by Structure: COUNTY ROUTE 87/19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $650,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A226,  Location: 0.01 MILE WEST OF CR 87/9 (Lat: 38.863331,  Lng: -81.779350),  Route carried "on" structure: County highway 877,  Year Built: 1999,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 100 (year 2018),  Average Future Daily Traffic: 119 (year 2038),  Design Load: H 20,  Features Intersected: LOGLICK RUN,  Facility Carried by Structure: COUNTY ROUTE 87/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.6m (28.2ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $350,000 ( Estimate for 2017),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A233,  Location: 0.05 MILE EAST OF CR 15 (Lat: 38.818939,  Lng: -81.715419),  Route carried "on" structure: US 33,  Year Built: 2003,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 19,800 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 26,136 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.489,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A234,  Location: 0.62 MILE SOUTH OF CR 25 (Lat: 38.801231,  Lng: -81.699289),  Route carried "on" structure: County highway 21,  Year Built: 1949,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 5.17m (16.96ft),  Average Daily Traffic: 7,600 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,500 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.559,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $350,000,  Total Project Cost: $350,000 ( Estimate for 2016),  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 18A245,  Location: 0.49 MILE NORTH OF CR 21 (Lat: 38.825561,  Lng: -81.698969),  Route carried "on" structure: County highway 2122,  Year Built: 2006,  Status: Open,  Structure Length: 2.25m (7.38ft),  Average Daily Traffic: 650 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 774 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SYCAMORE CREEK,  Facility Carried by Structure: COUNTY ROUTE 21/22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.789,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A253,  Location: 0.14 Mile West of WV 62 (Lat: 38.827939,  Lng: -81.765061),  Route carried "on" structure: State highway 87,  Year Built: 2011,  Status: Open,  Structure Length: 4.86m (15.94ft),  Average Daily Traffic: 4,100 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,428 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.690,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,000,000,  Roadway Improvement Cost: $3,000,000,  Total Project Cost: $10,000,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A255,  Location: 0.05 Miles West of CR 21 (Lat: 38.880431,  Lng: -81.689861),  Route carried "on" structure: Other road 948,  Year Built: 2015,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 90 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 107 (year 2038),  Design Load: H 10,  Features Intersected: Mud Run
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2019,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,000,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A256,  Location: 8.48 MILES NORTH OF WV 34 (Lat: 38.759569,  Lng: -81.692381),  Route carried "on" structure: Interstate 77,  Year Built: 2011,  Status: Open,  Structure Length: 5.50m (18.04ft),  Average Daily Traffic: 9,600 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,728 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CR 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 213.093,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,000,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A257,  Location: 8.48 MILES NORTH OF WV 34 (Lat: 38.759231,  Lng: -81.692161),  Route carried "on" structure: Interstate 77,  Year Built: 2010,  Status: Open,  Structure Length: 5.50m (18.04ft),  Average Daily Traffic: 9,600 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 13,728 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CR 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 213.093,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,000,000,  Total Project Cost: $1,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18A261,  Location: 1.34 M South of CR 34/1 (Lat: 38.771681,  Lng: -81.669031),  Route carried "on" structure: County highway 251,  Year Built: 2018,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 90 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 108 (year 2039),  Design Load: HL 93,  Features Intersected: TUG FORK OF MILL CREEK,  Facility Carried by Structure: County Route 25/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 18A262,  Location: 0.15 MI S OF US 33 (Lat: 38.818039,  Lng: -81.727711),  Route carried "on" structure: Interstate 77,  Year Built: 1964,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 7.95m (26.08ft),  Average Daily Traffic: 12,850 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 17,605 (year 2038),  Design Load: HL 93,  Features Intersected: C.R. 5/9, Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.671,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 18A263,  Location: 0.15 MI S OF US 33 (Lat: 38.818039,  Lng: -81.727950),  Route carried "on" structure: Interstate 77,  Year Built: 2020,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 12,850 (year 2018),  Truck Traffic: 20%,  Average Future Daily Traffic: 17,605 (year 2038),  Design Load: HL 93,  Features Intersected: C.R. 5/9, Mill Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 221.671,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18A901,  Location: 0.01 MILE EAST OF CR 25 (Lat: 38.793211,  Lng: -81.688531),  Route carried "on" structure: State lands road N0099,  Year Built: 1955,  Status: Open,  Structure Length: 4.16m (13.65ft),  Average Daily Traffic: 75 (year 2019),  Average Future Daily Traffic: 90 (year 2039),  Features Intersected: MILL CREEK,  Facility Carried by Structure: CEDAR LAKES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,000,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18A053,  Location: 0.09 M SOUTH OF CR 21/26 (Lat: 38.775881,  Lng: -81.724139),  Route carried "under" structure: Interstate 7700,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 13,440 (year 0013),  Truck Traffic: 23%,  Features Intersected: Branch of Cox Fk & I-77,  Facility Carried by Structure: COUNTY ROUTE 15
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 216.666,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 18.1m (59.4ft)

Find on map >>   Show street view

Structure Number: 18A164,  Location: 3.04 MILE NORTH OF US 33 (Lat: 38.859481,  Lng: -81.735169),  Route carried "under" structure: County highway 1205,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 0013),  Features Intersected: 12/5,  Facility Carried by Structure: I-77 NBL
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 18A165,  Location: 3.04 MILE NORTH OF US 33 (Lat: 38.859439,  Lng: -81.735419),  Route carried "under" structure: County highway 1205,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 0013),  Features Intersected: 12/5,  Facility Carried by Structure: I-77 SBL
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 14.6m (47.9ft)

Discuss Ripley, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.