Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Rehoboth, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 112ft / 34.3mTotal length
  • $26,956,000Total costs
  • 295,999Total average daily traffic
  • 6,101Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Rehoboth
  • No street view available for this location

New bridges in Rehoboth, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11930-1939
  • 51950-1959
  • 61960-1969
  • 11970-1979
Average Bridge Daily Traffic in Rehoboth, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 22.2%Satisfactory
  • 33.3%Fair
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 22.2%Fair
  • 11.1%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Good
  • 44.4%Satisfactory
  • 22.2%Fair
  • 11.1%Poor
  • 11.1%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 25.0%Poor
Find on map >>   Show street view

Structure Number: R040013N6DOTNBI,  Location: 1.7 MI NE SEEKONK T.L. (Lat: 41.841078,  Lng: -71.267742),  Route carried "on" structure: US 44,  Year Built: 1850,  Year Reconstructed: 1929,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 13,760 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 30,796 (year 2032),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Serious,  Substructure: Serious,  Channel: Poor,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2021,  Underwater Inspection Date: December 2021,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $712,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: R040043LWMUNNBI,  Location: 1 MI E OF SEEKONK (Lat: 41.809350,  Lng: -71.277914),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 1,700 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,422 (year 2031),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER,  Facility Carried by Structure: HWY REED ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Poor,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $793,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040053WMDOTNBI,  Location: .2 KM NW SWANSEA T.L. (Lat: 41.775375,  Lng: -71.281003),  Route carried "on" structure: US 6,  Year Built: 1972,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 13,450 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 26,058 (year 2032),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.640,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $1,462,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $2,194,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040073LVMUNNBI,  Location: .1 MI W OF RT 118 (Lat: 41.841833,  Lng: -71.244375),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,200 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,632 (year 2031),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER,  Facility Carried by Structure: HWY COUNTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,045,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: R040123JXMUNNBI,  Location: .3 MI W OF MASON ST (Lat: 41.800472,  Lng: -71.273033),  Route carried "on" structure: City street ,  Year Built: 1969,  Status: Posted for load,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,634 (year 2031),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER,  Facility Carried by Structure: HWY PROVDENCE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.189,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $771,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,157,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040173Y6DOTNBI,  Location: 1.1 MI FROM SWANSEA TL (Lat: 41.781919,  Lng: -71.287878),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 1,300 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,948 (year 2031),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY BARNEY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,784,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $4,177,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040183U4DOTNBI,  Location: .6 MI FROM SWANSEA T.L. (Lat: 41.778575,  Lng: -71.279381),  Route carried "on" structure: Interstate 195,  Year Built: 1960,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 46,696 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,593 (year 2032),  Design Load: H 20,  Features Intersected: WATER PALMER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.954,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.0m,  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Underwater Inspection Date: March 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $3,281,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $4,922,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040183U5DOTNBI,  Location: .6 MI FROM SWANSEA T L (Lat: 41.778992,  Lng: -71.279103),  Route carried "on" structure: Interstate 195,  Year Built: 1960,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 31,163 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 61,593 (year 2032),  Design Load: HS 20,  Features Intersected: WATER PALMER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.449,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: March 2020,  Bridge Improvement Cost: $3,281,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $4,922,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040193WUDOTNBI,  Location: .4 MI FROM SWANSEA T.L. (Lat: 41.777953,  Lng: -71.275628),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 8.87m (29.10ft),  Average Daily Traffic: 1,430 (year 2020),  Average Future Daily Traffic: 4,106 (year 2033),  Design Load: H 20,  Features Intersected: I 195,  Facility Carried by Structure: HWY MASON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 44.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,440,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $6,661,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: R040223JWMUNNBI,  Location: .25 MI NW OF RTE 44 (Lat: 41.845853,  Lng: -71.265308),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,317 (year 2032),  Features Intersected: WATER PALMER RIVER,  Facility Carried by Structure: HWY DANFORTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Fair,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $373,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: R040173Y6DOTNBI,  Location: 1.1 MI FROM SWANSEA T.L. (Lat: 41.766667,  Lng: -71.283333),  Route carried "under" structure: Interstate 195,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: HWY BARNEY AVE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: R040173Y6DOTNBI,  Location: 1.1 MI FROM SWANSEA T.L. (Lat: 41.766667,  Lng: -71.283333),  Route carried "under" structure: Interstate 195,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: HWY BARNEY AVE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: R040193WUDOTNBI,  Location: .4 MI FROM SWANSEA T.L. (Lat: 41.783333,  Lng: -71.283333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 EB,  Facility Carried by Structure: HWY MASON ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: R040193WUDOTNBI,  Location: 091286 STATUTORY (Lat: 41.783333,  Lng: -71.283333),  Route carried "under" structure: Interstate 195,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 0000),  Features Intersected: I 195 WB,  Facility Carried by Structure: HWY MASON ST
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Discuss Rehoboth, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.