Bridge Statistics for Prosperity, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 194ft / 59.2mTotal length
  • $12,500,000Total costs
  • 152,701Total average daily traffic
  • 25,382Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Prosperity
  • No street view available for this location

New bridges in Prosperity, WV - historical statistics
  • New bridges - historical statistics
  • 81970-1979
  • 81980-1989
Average Bridge Daily Traffic in Prosperity, WV
Average Bridge Truck Traffic in Prosperity, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 40.0%Satisfactory
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Good
  • 40.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Satisfactory
  • 10.0%Fair
  • 30.0%Poor
Find on map >>   Show street view

Structure Number: 41A152,  Location: 0.58 MI. E. I-77 (Lat: 37.839419,  Lng: -81.212189),  Route carried "on" structure: Alternate US 1900,  Year Built: 1979,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 6,700 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,442 (year 2038),  Design Load: HS 20,  Features Intersected: CR 4/1,  Facility Carried by Structure: US 19A EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A153,  Location: 0.58 MI. E OF I-77 (Lat: 37.839550,  Lng: -81.212639),  Route carried "on" structure: Alternate US 1900,  Year Built: 1979,  Status: Open,  Structure Length: 3.85m (12.63ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,898 (year 2038),  Design Load: HS 20,  Features Intersected: CR 4/1,  Facility Carried by Structure: US. 19A WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.933,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,500,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $4,000,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A195,  Location: 0.29 MI W OF US 19 RAMP (Lat: 37.850911,  Lng: -81.197150),  Route carried "on" structure: Alternate US 1900,  Year Built: 1979,  Status: Open,  Structure Length: 6.05m (19.85ft),  Average Daily Traffic: 6,700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,246 (year 2039),  Design Load: HS 20,  Features Intersected: WV 16,  Facility Carried by Structure: US RT 19 ALT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.865,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.7m (84.3ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.92m (19.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,500,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $4,000,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A199,  Location: 0.29 MI W OF US 19 (Lat: 37.851081,  Lng: -81.197219),  Route carried "on" structure: Alternate US 1900,  Year Built: 1979,  Status: Open,  Structure Length: 6.05m (19.85ft),  Average Daily Traffic: 6,700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,246 (year 2039),  Design Load: HS 20,  Features Intersected: US 19 ALT,  Facility Carried by Structure: US RT 19 ALT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.865,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.7m (84.3ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.92m (19.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,500,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $4,500,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A201,  Location: 0.72 MI S OF RT 19 (Lat: 37.825531,  Lng: -81.213631),  Route carried "on" structure: Interstate 7700,  Year Built: 1980,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 21,034 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,171 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Raleigh Co. 4 & 6 Conn.,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.462,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A202,  Location: 0.72 MI S OF RT 19 (Lat: 37.825550,  Lng: -81.214000),  Route carried "on" structure: Interstate 7700,  Year Built: 1980,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 21,034 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 44,171 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Raleigh Co. 4 & 6 Conn.,  Facility Carried by Structure: I-77 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 75.462,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 20.1m (65.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 19.1m (62.7ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A212,  Location: 0.01 MI N FROM I-77 (Lat: 37.835311,  Lng: -81.215419),  Route carried "on" structure: Ramp US 1900,  Year Built: 1980,  Status: Open,  Structure Length: 8.33m (27.33ft),  Average Daily Traffic: 1,352 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,840 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: I-77,  Facility Carried by Structure: US RT 19 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A213,  Location: 0.01 MI N FROM I-77 (Lat: 37.835431,  Lng: -81.215569),  Route carried "on" structure: Ramp US 1900,  Year Built: 1980,  Status: Open,  Structure Length: 8.33m (27.33ft),  Average Daily Traffic: 7,625 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 16,013 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: I-77,  Facility Carried by Structure: US RT 19 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A217,  Location: 0.39 MI N OF CORR L I/C (Lat: 37.837939,  Lng: -81.221961),  Route carried "on" structure: Interstate 7700,  Year Built: 1983,  Status: Open,  Structure Length: 5.48m (17.98ft),  Average Daily Traffic: 21,035 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 30,709 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: Route 4/1,  Facility Carried by Structure: I-77 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.249,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A23,  Location: 0.40 MI. N. US. 119 (Lat: 37.837681,  Lng: -81.222200),  Route carried "on" structure: Interstate 7700,  Year Built: 1984,  Status: Open,  Structure Length: 5.81m (19.06ft),  Average Daily Traffic: 12,921 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,842 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: County Route 4/1,  Facility Carried by Structure: I-77 SB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.249,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 41A152,  Location: 0.58 MI. E. I-77 (Lat: 37.839450,  Lng: -81.212200),  Route carried "under" structure: County highway 400,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 0009),  Truck Traffic: 6%,  Features Intersected: CR 4/1,  Facility Carried by Structure: US 19A EB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.933,  Lanes on structure: 2,  Lanes under structure: 1,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 41A153,  Location: 0.58 MI. E OF I-77 (Lat: 37.839550,  Lng: -81.212639),  Route carried "under" structure: County highway 401,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 0009),  Truck Traffic: 6%,  Features Intersected: CR 4/1,  Facility Carried by Structure: US. 19A WB
Minimum Vertical Clearance: 6.25m (20.51ft),  Kilometerpoint: 0.257,  Lanes on structure: 3,  Lanes under structure: 1,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 41A195,  Location: 0.29 MI W OF US 19 RAMP (Lat: 37.850911,  Lng: -81.197150),  Route carried "under" structure: State highway 1600,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 0009),  Truck Traffic: 6%,  Features Intersected: WV 16,  Facility Carried by Structure: US RT 19 ALT
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 37.240,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 41A199,  Location: 0.29 MI W OF US 19 (Lat: 37.851089,  Lng: -81.197211),  Route carried "under" structure: State highway 1600,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 0006),  Truck Traffic: 6%,  Features Intersected: US 19 ALT,  Facility Carried by Structure: US RT 19 ALT
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 37.240,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 41A212,  Location: 0.01 MI N FROM I-77 (Lat: 37.835311,  Lng: -81.215419),  Route carried "under" structure: Interstate 7700,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 0006),  Truck Traffic: 25%,  Features Intersected: I-77,  Facility Carried by Structure: US RT 19 EB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 76.573,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 41A213,  Location: 0.01 MI N FROM I-77 (Lat: 37.835431,  Lng: -81.215569),  Route carried "under" structure: Interstate 7700,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 17,500 (year 0006),  Truck Traffic: 25%,  Features Intersected: I-77,  Facility Carried by Structure: US RT 19 WB
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 76.589,  Lanes on structure: 1,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Length of Maximum Span: 34.1m (111.9ft)