Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Prichard, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 121ft / 36.5mTotal length
  • $635,000Total costs
  • 14,874Total average daily traffic
  • 1,969Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Prichard
  • No street view available for this location

New bridges in Prichard, WV - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Prichard, WV
Average Bridge Truck Traffic in Prichard, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 44.4%Good
  • 22.2%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 55.6%Good
  • 33.3%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 77.8%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 50A001,  Location: 0.13 MI EAST OF CR 27 (Lat: 38.192089,  Lng: -82.599969),  Route carried "on" structure: US 5200,  Year Built: 1979,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,255 (year 2040),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.231,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A03,  Location: 0.63 MI NORTH OF CR 20 (Lat: 38.250800,  Lng: -82.556000),  Route carried "on" structure: County highway 1800,  Year Built: 1940,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 462 (year 2038),  Features Intersected: GRAGSTON CREEK,  Facility Carried by Structure: CR 18
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.350,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $185,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 50A031,  Location: 0.12 MI WEST OF CR 18 (Lat: 38.221139,  Lng: -82.535631),  Route carried "on" structure: County highway 1801,  Year Built: 1988,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 80 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 123 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GRAGSTON CREEK,  Facility Carried by Structure: CR 18/1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A039,  Location: 0.06 MI WEST OF CR 20/1 (Lat: 38.238361,  Lng: -82.576789),  Route carried "on" structure: County highway 2000,  Year Built: 1989,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 934 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,438 (year 2039),  Design Load: HS 20,  Features Intersected: ELIJAH CREEK,  Facility Carried by Structure: CR 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A178,  Location: 1.00 MILE SOUTH OF CR 20 (Lat: 38.232789,  Lng: -82.598261),  Route carried "on" structure: US 5200,  Year Built: 1997,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 2,050 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,153 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: US 52,  Facility Carried by Structure: US 52 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.637,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.0m (88.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A179,  Location: 1.00 MILE SOUTH OF CR 20 (Lat: 38.232850,  Lng: -82.598489),  Route carried "on" structure: US 5200,  Year Built: 1997,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 2,050 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,453 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: US 52,  Facility Carried by Structure: US 52 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.637,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.0m (88.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A213,  Location: 0.03 MILES E OF CR 20/3 (Lat: 38.243050,  Lng: -82.552381),  Route carried "on" structure: County highway 2000,  Year Built: 2008,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 650 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,001 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: GRAGSTON CREEK,  Facility Carried by Structure: COUNTY ROUTE 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.605,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 50A23,  Location: 0.18 mile East of CR 18 (Lat: 38.270300,  Lng: -82.572400),  Route carried "on" structure: US 5200,  Year Built: 2012,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 5,200 (year 2018),  Truck Traffic: 24%,  Average Future Daily Traffic: 9,516 (year 2038),  Design Load: HL 93,  Features Intersected: Gragston Creek,  Facility Carried by Structure: US 52
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.432,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 55.8m (183.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 50A237,  Location: 1.4 MILE WEST OF US 52 (Lat: 38.225011,  Lng: -82.605169),  Route carried "on" structure: County highway 25214,  Year Built: 2015,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 11 (year 2039),  Design Load: HL 93,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: CO 252/14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 57.3m (188.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 50A178,  Location: 1.00 MILE SOUTH OF CR 20 (Lat: 38.232789,  Lng: -82.598261),  Route carried "under" structure: County highway 25209,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 0007),  Truck Traffic: 11%,  Features Intersected: US 52,  Facility Carried by Structure: US 52 NB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 50A179,  Location: 1.00 MILE SOUTH OF CR 20 (Lat: 38.232850,  Lng: -82.598489),  Route carried "under" structure: County highway 25209,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 0007),  Truck Traffic: 11%,  Features Intersected: US 52,  Facility Carried by Structure: US 52 SB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 27.0m (88.6ft)

Discuss Prichard, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.