Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Poynette, Wisconsin (WI)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 108ft / 33.2mTotal length
  • $749,000Total costs
  • 260,406Total average daily traffic
  • 40,924Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Poynette
  • No street view available for this location

New bridges in Poynette, WI - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 121960-1969
  • 31980-1989
  • 11990-1999
  • 12010-2019
Average Bridge Daily Traffic in Poynette, WI
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 25.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 25.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 25.0%Good
  • 25.0%Satisfactory
  • 37.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 12.5%Good
  • 37.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: B110014,  Location: 1.9M W JCT CTH Q (Lat: 43.352406,  Lng: -89.459847),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 6.32m (20.73ft),  Average Daily Traffic: 140 (year 2019),  Average Future Daily Traffic: 165 (year 2039),  Design Load: H 15,  Features Intersected: IH 39/90/94,  Facility Carried by Structure: LRD RICHARDS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.3m (66.6ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B110015,  Location: 3.9M E JCT CTH CS (Lat: 43.335297,  Lng: -89.454069),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.53m (11.58ft),  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 44,935 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: STH 60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B110016,  Location: 7.2M W JCT CTH V TO E (Lat: 43.335161,  Lng: -89.453475),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 26,100 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 48,615 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STH 60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.5m (47.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $749,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B110024,  Location: 1.0M E JCT CTH CS TO W (Lat: 43.377022,  Lng: -89.461547),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 33,050 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 44,935 (year 2039),  Design Load: HS 20,  Features Intersected: LRD SMOKEY HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.7m (51.5ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B110025,  Location: 3.3M N JCT STH 60 (Lat: 43.378153,  Lng: -89.460444),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 7.02m (23.03ft),  Average Daily Traffic: 609 (year 2019),  Average Future Daily Traffic: 110 (year 2039),  Design Load: H 20,  Features Intersected: IH 90 WB-IH 94 WB,  Facility Carried by Structure: LRD SMOKEY HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.9m (101.4ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B110043,  Location: 2.7M W JCT STH 60 TO E (Lat: 43.375547,  Lng: -89.460175),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 50,100 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BR ROWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B110044,  Location: 3.0M W JCT STH 60 TO E (Lat: 43.379172,  Lng: -89.460908),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 50,100 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BR ROWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B110045,  Location: 3.0M W JCT STH 60 TO E (Lat: 43.379906,  Lng: -89.461133),  Route carried "on" structure: Interstate 90,  Year Built: 1961,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 50,100 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BR ROWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: B110046,  Location: 1.5M S JCT CTH CS (Lat: 43.375217,  Lng: -89.459589),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 9 (year 2019),  Average Future Daily Traffic: 9 (year 2039),  Design Load: H 15,  Features Intersected: BR ROWAN CREEK,  Facility Carried by Structure: LRD SANDERSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B110088,  Location: 3.2M E JCT STH 60 (Lat: 43.377175,  Lng: -89.461156),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 610 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 6,100 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: LRD SMOKEY HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B110123,  Location: 0.6M N JCT CTH CS (Lat: 43.388872,  Lng: -89.402664),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.91m (6.27ft),  Average Daily Traffic: 2,161 (year 2019),  Average Future Daily Traffic: 2,377 (year 2039),  Design Load: HS 20,  Features Intersected: ROWAN CREEK,  Facility Carried by Structure: CTH Q MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B110157,  Location: 3.7M N JCT STH 60 TO W (Lat: 43.386311,  Lng: -89.395000),  Route carried "on" structure: US 51,  Year Built: 2017,  Status: Open,  Structure Length: 1.56m (5.12ft),  Average Daily Traffic: 6,000 (year 2019),  Average Future Daily Traffic: 6,200 (year 2038),  Design Load: HL 93,  Features Intersected: ROWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: P110086,  Location: 0.6M W JCT CTH Q (Lat: 43.380597,  Lng: -89.419978),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,117 (year 2019),  Average Future Daily Traffic: 1,228 (year 2039),  Design Load: HS 20,  Features Intersected: BR ROWAN CREEK,  Facility Carried by Structure: CTH CS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: B110014,  Location: 2.7M E JCT CTH CS TO W (Lat: 43.352406,  Lng: -89.459847),  Route carried "under" structure: Interstate 90,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 46,300 (year 2019),  Truck Traffic: 17%,  Features Intersected: IH 39/90/94,  Facility Carried by Structure: LRD RICHARDS RD
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.3m (66.6ft)

Find on map >>   Show street view

Structure Number: B110015,  Location: 4.2M E JCT STH 113 (Lat: 43.335297,  Lng: -89.454069),  Route carried "under" structure: State highway 60,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 5,600 (year 2019),  Truck Traffic: 12%,  Features Intersected: STH 60,  Facility Carried by Structure: IH 39 SB-90 EB-IH
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.5m (47.6ft)

Find on map >>   Show street view

Structure Number: B110016,  Location: 4.3M E JCT STH 113 (Lat: 43.335161,  Lng: -89.453475),  Route carried "under" structure: State highway 60,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 5,600 (year 2019),  Truck Traffic: 10%,  Features Intersected: STH 60,  Facility Carried by Structure: IH 39/90/94 NB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 14.5m (47.6ft)

Find on map >>   Show street view

Structure Number: B110024,  Location: 3.2M N JCT STH 60 (Lat: 43.377022,  Lng: -89.461547),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 610 (year 2019),  Features Intersected: LRD SMOKEY HOLLOW RD,  Facility Carried by Structure: IH 90 EB-IH 94 EB
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.7m (51.5ft)

Find on map >>   Show street view

Structure Number: B110025,  Location: 2.9M W JCT STH 60 TO E (Lat: 43.378153,  Lng: -89.460444),  Route carried "under" structure: Interstate 90,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 17%,  Features Intersected: IH 90 WB-IH 94 WB,  Facility Carried by Structure: LRD SMOKEY HOLLOW
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.9m (101.4ft)

Discuss Poynette, Wisconsin (WI) on our hugely popular Wisconsin forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.