Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Poestenkill, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 59ft / 18.4mTotal length
  • $9,945,000Total costs
  • 10,144Total average daily traffic
  • 697Total average daily truck traffic
  • 13,610Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Poestenkill
  • No street view available for this location

New bridges in Poestenkill, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11940-1949
  • 41980-1989
  • 52000-2009
Average Bridge Daily Traffic in Poestenkill, NY
Average Bridge Truck Traffic in Poestenkill, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 12.5%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Excellent
  • 27.3%Very good
  • 18.2%Good
  • 18.2%Satisfactory
  • 9.1%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 27.3%Excellent
  • 18.2%Very good
  • 9.1%Good
  • 45.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 38.5%Good
  • 15.4%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: 13036,  Location: VILLAGE OF POESTENKILL (Lat: 42.690931,  Lng: -73.563642),  Route carried "on" structure: State highway 351,  Year Built: 2004,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 3,635 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,497 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: POESTEN KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.050,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,511,000,  Roadway Improvement Cost: $885,000,  Total Project Cost: $2,396,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220188,  Location: 3 MILES ESE OF POESTENKIL (Lat: 42.677286,  Lng: -73.510767),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 105 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 147 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: POWERS ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220189,  Location: 3.45MI.E.OF POESTENKILL (Lat: 42.680269,  Lng: -73.492058),  Route carried "on" structure: Bypass Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 81 (year 2014),  Truck Traffic: 20%,  Average Future Daily Traffic: 113 (year 2034),  Design Load: HS 20,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: LEGENBAUER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $282,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $447,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22019,  Location: 4 MI EAST OF POESTENKILL (Lat: 42.689803,  Lng: -73.486019),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 171 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 239 (year 2038),  Features Intersected: POESTEN KILL,  Facility Carried by Structure: Fifty Six Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 79.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $475,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220191,  Location: 4.5 MI.E.OF POESTENKILL (Lat: 42.690283,  Lng: -73.479386),  Route carried "on" structure: Other road ,  Year Built: 2006,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 69 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 97 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: CROPSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $322,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $511,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330355,  Location: 1.4 MI NW OF POESTENKILL (Lat: 42.705822,  Lng: -73.582197),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 889 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,245 (year 2037),  Design Load: H 20,  Features Intersected: QUACKENKILL,  Facility Carried by Structure: GARFIELD RD CR137
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.110,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $573,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $909,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330356,  Location: 1.3 MI NW POESTENKILL (Lat: 42.701875,  Lng: -73.581558),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 889 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,245 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: GARFIELD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 8.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $839,000,  Roadway Improvement Cost: $491,000,  Total Project Cost: $1,330,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330358,  Location: 3.0 MI NW POESTENKILL (Lat: 42.689053,  Lng: -73.517733),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 397 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 556 (year 2037),  Design Load: H 20,  Features Intersected: BONESTEEL CREEK,  Facility Carried by Structure: BLUE FACTORY RD (C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.156,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $514,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $816,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330359,  Location: 1.3MI.SE.POESTENKILL (Lat: 42.683389,  Lng: -73.540431),  Route carried "on" structure: County highway ,  Year Built: 1940,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 1,547 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,166 (year 2039),  Features Intersected: POESTEN KILL,  Facility Carried by Structure: CR79 BLUE FACTORY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $189,000,  Total Project Cost: $512,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330362,  Location: 2.1 MI E OF POESTENKILL (Lat: 42.685211,  Lng: -73.525153),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 966 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,352 (year 2037),  Features Intersected: IVES CORS.CREEK,  Facility Carried by Structure: COLUMBIA HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $156,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330363,  Location: 3.3 MI E.OF POESTENKILL (Lat: 42.681864,  Lng: -73.499575),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 2007,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 142 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 199 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: COUNTY ROAD 40
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.546,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $260,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $413,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330364,  Location: 3.75 MI E OF POESTENKILL (Lat: 42.687928,  Lng: -73.488869),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 856 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,198 (year 2036),  Design Load: H 20,  Features Intersected: POESTEN KILL,  Facility Carried by Structure: PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.737,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $814,000,  Roadway Improvement Cost: $477,000,  Total Project Cost: $1,290,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330411,  Location: 3.2 MI NE OF POESTENKILL (Lat: 42.709836,  Lng: -73.507975),  Route carried "on" structure: County highway ,  Year Built: 1939,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 397 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 556 (year 2037),  Features Intersected: BONESTEEL CREEK,  Facility Carried by Structure: BLUE FACTORY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.811,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $213,000 ( Estimate for 2021)
Discuss Poestenkill, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.