Bridge Statistics for Pine River, Minnesota (MN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 75ft / 22.8mTotal length
  • $310,000,000Total costs
  • 39,386Total average daily traffic
  • 2,648Total average daily truck traffic
  • 37,956Total future (year 2029) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pine River
  • No street view available for this location

New bridges in Pine River, MN - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 31980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Pine River, MN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Excellent
  • 50.0%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Excellent
  • 50.0%Very good
  • 16.7%Good
  • 16.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Excellent
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 30.0%Very good
  • 40.0%Good
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2563,  Location: 0.8 MI S OF JCT CSAH 23 (Lat: 45.144867,  Lng: -93.128128),  Route carried "on" structure: County highway 49,  Year Built: 2006,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 13,000 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,000 (year 2034),  Design Load: HL 93,  Features Intersected: RICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.2m (69.6ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11011,  Location: 0.28 MI E OF MN 371 (Lat: 46.720872,  Lng: -94.400450),  Route carried "on" structure: State highway 84,  Year Built: 2021,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 3,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,620 (year 2039),  Design Load: HL 93,  Features Intersected: NORWAY BROOK DAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.4m (70.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11112,  Location: 2.0 MI SE OF PINE RIVER (Lat: 46.694061,  Lng: -94.370117),  Route carried "on" structure: State highway 371,  Year Built: 1992,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 8,100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,500 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: S FK PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.8m (45.3ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11501,  Location: 0.9 MI S OF JCT TH 371 (Lat: 46.703864,  Lng: -94.409006),  Route carried "on" structure: County highway 1,  Year Built: 1961,  Status: Posted for load,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 870 (year 2015),  Average Future Daily Traffic: 870 (year 2039),  Design Load: H 20,  Features Intersected: S FK PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11528,  Location: 0.7 MI E OF JCT CSAH 1 (Lat: 46.703911,  Lng: -94.404014),  Route carried "on" structure: County highway 118,  Year Built: 2013,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 98 (year 2012),  Average Future Daily Traffic: 98 (year 2029),  Design Load: HL 93,  Features Intersected: S FK PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6499,  Location: IN PINE RIVER (Lat: 46.720836,  Lng: -94.400428),  Route carried "on" structure: State highway 84,  Year Built: 1943,  Status: Closed,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 3,550 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,250 (year 2039),  Design Load: H 15,  Features Intersected: NORWAY BROOK (DAM)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.49m (1.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2019,  Bridge Improvement Cost: $332,000,000,  Roadway Improvement Cost: $100,000,000,  Total Project Cost: $256,000,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6506,  Location: 0.6 MI SE OF PINE RIVER (Lat: 46.712097,  Lng: -94.394403),  Route carried "on" structure: State highway 371,  Year Built: 1950,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 8,100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 7,500 (year 2039),  Design Load: H 15,  Features Intersected: NORWAY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.52m (1.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $273,000,000,  Total Project Cost: $54,000,000
Find on map >>   Show street view

Structure Number: 91947,  Location: 0.7 MI N OF JCT TH 371 (Lat: 46.701461,  Lng: -94.367028),  Route carried "on" structure: County highway 44,  Year Built: 1981,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,050 (year 2015),  Average Future Daily Traffic: 1,050 (year 2039),  Design Load: HS 20,  Features Intersected: ARVIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 93901,  Location: 0.1 MI N OF JCT TH 371 (Lat: 46.696036,  Lng: -94.368767),  Route carried "on" structure: County highway 44,  Year Built: 1986,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 1,050 (year 2015),  Average Future Daily Traffic: 1,050 (year 2039),  Design Load: HS 20,  Features Intersected: ARVIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.9m (9.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020
Find on map >>   Show street view

Structure Number: 95887,  Location: 0.6 MI S OF JCT CSAH 2 (Lat: 46.708633,  Lng: -94.472236),  Route carried "on" structure: County highway 168,  Year Built: 1984,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 18 (year 1986),  Average Future Daily Traffic: 18 (year 2029),  Features Intersected: S FK PINE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.5m (8.2ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Allowable Stress Design (ASD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Discuss Pine River, Minnesota (MN) on our hugely popular Minnesota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.