Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Pennsboro, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 200ft / 60.6mTotal length
  • $25,799,000Total costs
  • 36,310Total average daily traffic
  • 4,722Total average daily truck traffic
  • 49,979Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pennsboro
  • No street view available for this location

New bridges in Pennsboro, WV - historical statistics
  • New bridges - historical statistics
  • 31910-1919
  • 51920-1929
  • 21940-1949
  • 21950-1959
  • 51960-1969
  • 11970-1979
  • 71990-1999
  • 22000-2009
Reconstructed bridges in Pennsboro, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Pennsboro, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 41.2%Good
  • 5.9%Satisfactory
  • 29.4%Fair
  • 23.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.9%Good
  • 18.2%Satisfactory
  • 18.2%Fair
  • 22.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 45.5%Good
  • 13.6%Satisfactory
  • 31.8%Fair
  • 9.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Very good
  • 61.5%Good
  • 19.2%Satisfactory
  • 3.8%Fair
  • 11.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 37A012,  Location: 0.07 MI SOUTH OF CR 32 (Lat: 39.356269,  Lng: -81.016731),  Route carried "on" structure: County highway 5,  Year Built: 1952,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 143 (year 2039),  Features Intersected: MCKIM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.690,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $6,000,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A007,  Location: 0.04 MI S OF CR 6 (Lat: 39.322700,  Lng: -81.001069),  Route carried "on" structure: County highway 64,  Year Built: 1913,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 20 (year 2019),  Average Future Daily Traffic: 30 (year 2039),  Features Intersected: BONDS CREEK,  Facility Carried by Structure: CR 6/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.513,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 19.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $70,000,  Total Project Cost: $70,000
Find on map >>   Show street view

Structure Number: 43A014,  Location: 0.01 MI S OF CR 7/3 (Lat: 39.230700,  Lng: -80.972131),  Route carried "on" structure: State highway 74,  Year Built: 1929,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 855 (year 2039),  Features Intersected: BEASON RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.743,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $850,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A015,  Location: 0.05 M SOUTH OF CR 7/2 (Lat: 39.238939,  Lng: -80.979881),  Route carried "on" structure: State highway 74,  Year Built: 1952,  Status: Open,  Structure Length: 6.14m (20.14ft),  Average Daily Traffic: 700 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 763 (year 2038),  Design Load: HS 15,  Features Intersected: NORTH FORK HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.159,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.25m (20.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A03,  Location: 0.05 MILE WEST OD CR 7/1 (Lat: 39.246331,  Lng: -80.945750),  Route carried "on" structure: County highway 10,  Year Built: 1994,  Status: Open,  Structure Length: 4.47m (14.67ft),  Average Daily Traffic: 30 (year 2018),  Average Future Daily Traffic: 40 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: NORTH FORK HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.5m (70.5ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $1,200,000,  Total Project Cost: $1,200,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A034,  Location: 0.23 MI. S. OF CR 10 (Lat: 39.244881,  Lng: -80.942231),  Route carried "on" structure: County highway 104,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 45 (year 2017),  Average Future Daily Traffic: 57 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: LYNNCAMP RUN,  Facility Carried by Structure: CR 10/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.743,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2019,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $650,000 ( Estimate for 2015),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A112,  Location: 0.11 MI. E. OF CR. 50/21 (Lat: 39.273900,  Lng: -80.987800),  Route carried "on" structure: US 50,  Year Built: 1969,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 10,800 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 15,228 (year 2039),  Design Load: HS 20,  Features Intersected: BUNNEL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.828,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $1,000,000,  Total Project Cost: $2,000,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 43A113,  Location: 0.08 MI. W.OF CR. 10 (Lat: 39.267789,  Lng: -80.917361),  Route carried "on" structure: US 50,  Year Built: 1969,  Status: Open,  Structure Length: 5.28m (17.32ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,024 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH FK.HUGHES RV.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.169,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A114,  Location: 0.08 MI. W OF CR10 (Lat: 39.267939,  Lng: -80.917500),  Route carried "on" structure: US 50,  Year Built: 1969,  Status: Open,  Structure Length: 5.28m (17.32ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 9,024 (year 2039),  Design Load: HS 20,  Features Intersected: NORTH FK.HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.169,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,100,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A118,  Location: 0.05 MILE N OF CR 50/39 (Lat: 39.280781,  Lng: -80.986819),  Route carried "on" structure: County highway 5020,  Year Built: 1992,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 50 (year 2018),  Average Future Daily Traffic: 60 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: HORNER RUN,  Facility Carried by Structure: COUNTY ROUTE 50/20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.6m (15.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $750,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A129,  Location: 0.07 MI W CR 16/10 (Lat: 39.284569,  Lng: -80.996681),  Route carried "on" structure: County highway 5039,  Year Built: 1966,  Status: Posted for load,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 2,600 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,874 (year 2039),  Design Load: HS 15,  Features Intersected: NORTH BEND RAIL TRAIL,  Facility Carried by Structure: CR 50/39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.051,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.24m (33.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Bridge Improvement Cost: $755,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $756,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A131,  Location: 0.03 MILE WEST CR 50/24 (Lat: 39.274939,  Lng: -80.931300),  Route carried "on" structure: County highway 5040,  Year Built: 1929,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 550 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 880 (year 2039),  Features Intersected: NORTH FORK HUGHES RIVER,  Facility Carried by Structure: COUNTY ROUTE 50/40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.173,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 43A133,  Location: 0.10 MI W OF CR 10 (Lat: 39.275989,  Lng: -80.913031),  Route carried "on" structure: County highway 5040,  Year Built: 1948,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 600 (year 2018),  Average Future Daily Traffic: 714 (year 2038),  Features Intersected: SUGAR RUN,  Facility Carried by Structure: CO RT 50/40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.233,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $625,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 43A136,  Location: 0.04 MI. S. OF CR 50/39 (Lat: 39.283519,  Lng: -80.967811),  Route carried "on" structure: State highway 74,  Year Built: 1940,  Status: Open,  Structure Length: 0.86m (2.82ft),  Average Daily Traffic: 1,600 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,744 (year 2038),  Features Intersected: BUNNEL RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.031,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $650,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A14,  Location: 0.15 MI. EAST OF WV 74 (Lat: 39.337189,  Lng: -80.919939),  Route carried "on" structure: County highway 745,  Year Built: 1912,  Status: Posted for load,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 70 (year 2019),  Average Future Daily Traffic: 91 (year 2039),  Features Intersected: NORTH FORK HUGHES RIVER,  Facility Carried by Structure: COUNTY 74/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,050,000
Find on map >>   Show street view

Structure Number: 43A141,  Location: 0.37 MI. W. OF CR 50/24 (Lat: 39.311681,  Lng: -80.935789),  Route carried "on" structure: County highway 749,  Year Built: 1914,  Status: Open,  Structure Length: 1.69m (5.54ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 179 (year 2039),  Features Intersected: NORTH FORK HUGHES RIVER,  Facility Carried by Structure: COUNTY ROUTE 74/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.492,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $150,000,  Total Project Cost: $150,000
Find on map >>   Show street view

Structure Number: 43A142,  Location: 0.68 MI. E. OF CR 50/24 (Lat: 39.306469,  Lng: -80.922711),  Route carried "on" structure: County highway 749,  Year Built: 1924,  Status: Posted for load,  Structure Length: 1.73m (5.68ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 240 (year 2038),  Features Intersected: BUCK RUN,  Facility Carried by Structure: CR 74/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.182,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $400,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A154,  Location: 0.01 MI S OF JCT CR 50/39 (Lat: 39.279689,  Lng: -80.987089),  Route carried "on" structure: County highway 5021,  Year Built: 1969,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 2,600 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,874 (year 2039),  Features Intersected: HORNER RUN,  Facility Carried by Structure: CO RT 50/21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.442,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $380,000,  Total Project Cost: $380,000
Find on map >>   Show street view

Structure Number: 43A171,  Location: 0.25 MILE EAST OF US 50 (Lat: 39.273081,  Lng: -80.914331),  Route carried "on" structure: County highway 10,  Year Built: 1997,  Status: Open,  Structure Length: 1.38m (4.53ft),  Average Daily Traffic: 550 (year 2018),  Average Future Daily Traffic: 655 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SUGAR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.463,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Poor,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A174,  Location: 0.26 MILE W OF CR 50/40 (Lat: 39.271481,  Lng: -80.914731),  Route carried "on" structure: County highway 10,  Year Built: 1997,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 550 (year 2018),  Average Future Daily Traffic: 655 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SUGAR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.672,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $650,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A175,  Location: 0.12 MILE W OF CR 50/40 (Lat: 39.275219,  Lng: -80.914281),  Route carried "on" structure: County highway 10,  Year Built: 1997,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 565 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 718 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: SUGAR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.897,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $850,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 43A179,  Location: 0.01 MILE SOUTH OF CR 10 (Lat: 39.248639,  Lng: -80.970561),  Route carried "on" structure: State highway 74,  Year Built: 2000,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 700 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 763 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: SPRING RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.913,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 43A185,  Location: 0.20 MI EAST OF CR 50/21 (Lat: 39.276461,  Lng: -80.987439),  Route carried "on" structure: County highway 5067,  Year Built: 2002,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 30 (year 2018),  Average Future Daily Traffic: 36 (year 2038),  Features Intersected: BUNNELL RUN,  Facility Carried by Structure: COUNTY ROUTE 50/67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $102,000,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 43A901,  Location: 0.01 MILE EAST OF WV 74 (Lat: 39.285211,  Lng: -80.964519),  Route carried "on" structure: City street N1240,  Year Built: 1920,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 149 (year 2039),  Features Intersected: BUNNELL RUN,  Facility Carried by Structure: CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.6m (21.7ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $1,500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 48A008,  Location: 0.03 mi. South jct CR 6/7 (Lat: 39.362619,  Lng: -81.005069),  Route carried "on" structure: County highway 65,  Year Built: 1920,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 61 (year 2039),  Features Intersected: McKim Creek,  Facility Carried by Structure: County Route 6/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.157,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $268,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 48A065,  Location: 0.01 mi. West jct CR 20/1 (Lat: 39.370511,  Lng: -80.971739),  Route carried "on" structure: County highway 20,  Year Built: 1978,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 61 (year 2039),  Design Load: HS 20,  Features Intersected: McKim Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.076,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.7m (15.4ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $348,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 48A079,  Location: 0.39 mi. East jct CR20/1 (Lat: 39.373731,  Lng: -80.966689),  Route carried "on" structure: County highway 20,  Year Built: 1999,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 61 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: McKim Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Discuss Pennsboro, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.