Bridge Statistics for Pelham, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 46ft / 14.3mTotal length
  • $28,119,000Total costs
  • 423,035Total average daily traffic
  • 12,050Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pelham
  • No street view available for this location

New bridges in Pelham, NY - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 11920-1929
  • 21940-1949
  • 21960-1969
  • 31980-1989
  • 22010-2019
Average Bridge Daily Traffic in Pelham, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Excellent
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 20.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Excellent
  • 40.0%Good
  • 40.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 5500039,  Location: 0.8 MI N JCT HRP & US 1 (Lat: 40.902625,  Lng: -73.814983),  Route carried "on" structure: Other road 907W,  Year Built: 1987,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 93,396 (year 2007),  Truck Traffic: 2%,  Average Future Daily Traffic: 131,753 (year 2040),  Design Load: HS 20,  Features Intersected: COLONIAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.512,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 25.2m (82.7ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,710,000,  Roadway Improvement Cost: $3,344,000,  Total Project Cost: $9,054,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 550005,  Location: AT PELHAM (Lat: 40.906122,  Lng: -73.813547),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 7,707 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,362 (year 2040),  Design Load: HL 93,  Features Intersected: 907W 907W87011012 SB, R,  Facility Carried by Structure: EAST 3RD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $5,355,000,  Roadway Improvement Cost: $3,136,000,  Total Project Cost: $8,491,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5500099,  Location: 1.6 MI N JCT RTS HRP<1 (Lat: 40.914700,  Lng: -73.812414),  Route carried "on" structure: Other road 907W,  Year Built: 1926,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 93,396 (year 2005),  Truck Traffic: 2%,  Average Future Daily Traffic: 131,753 (year 2040),  Features Intersected: HUTCHINSON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.928,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 26.5m (86.9ft),  Out-to-Out Width: 28.1m (92.2ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,263,000,  Roadway Improvement Cost: $740,000,  Total Project Cost: $2,002,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5521609,  Location: 1.2 MI S JCT HRP & CCP (Lat: 40.921569,  Lng: -73.809683),  Route carried "on" structure: Other road ,  Year Built: 1949,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Future Daily Traffic: 73,749 (year 2017),  Features Intersected: 907W907W87011023 HRP SB,,  Facility Carried by Structure: WARTBURG CONNECTIO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,098,000,  Roadway Improvement Cost: $2,986,000,  Total Project Cost: $8,084,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 552345,  Location: PELHAM VILLAGE (Lat: 40.916817,  Lng: -73.811083),  Route carried "on" structure: Ramp Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 77,000 (year 1987),  Truck Traffic: 10%,  Average Future Daily Traffic: 107,800 (year 2007),  Design Load: HS 20,  Features Intersected: HUTCHINSON RIVER,  Facility Carried by Structure: 1ST AVE RAMP -HRP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $488,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 5500039,  Location: 0.8 MI N JCT HRP & US 1 (Lat: 40.902625,  Lng: -73.814983),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 9,383 (year 2018),  Truck Traffic: 3%,  Features Intersected: COLONIAL AVE,  Facility Carried by Structure: RTE 907W
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 550005,  Location: AT PELHAM (Lat: 40.906122,  Lng: -73.813547),  Route carried "under" structure: Other road 907W,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 91,781 (year 2002),  Features Intersected: 907W 907W87011012 SB, R,  Facility Carried by Structure: EAST 3RD ST
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 550006,  Location: 1.2 MI N JCT RTS HRP+1 (Lat: 40.909583,  Lng: -73.814114),  Route carried "under" structure: Other road 907W,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2021),  Features Intersected: 907WX SB, RTE 907W, HUTC,  Facility Carried by Structure: PELHAMDALE PED BR
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 550006,  Location: 1.2 MI N JCT RTS HRP+1 (Lat: 40.909583,  Lng: -73.814114),  Route carried "under" structure: Other road ,  Year Built: 1963,  Structure Length: 0. m,  Features Intersected: 907WX SB, RTE 907W, HUTC,  Facility Carried by Structure: PELHAMDALE PED BR
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 5521609,  Location: 1.2 MI S JCT HRP & CCP (Lat: 40.921569,  Lng: -73.809683),  Route carried "under" structure: Other road 907W,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2021),  Features Intersected: 907W907W87011023 HRP SB,,  Facility Carried by Structure: WARTBURG CONNECTIO
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 5.792,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Frame,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 771249,  Location: AT PELHAM (Lat: 40.910336,  Lng: -73.810178),  Route carried "under" structure: Other road ,  Year Built: 1905,  Structure Length: 0. m,  Features Intersected: FIFTH AVE PELHAM,  Facility Carried by Structure: MNRR NH LINE
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 771286,  Location: AT PELHAM (Lat: 40.909481,  Lng: -73.806325),  Route carried "under" structure: Other road ,  Year Built: 1906,  Structure Length: 0. m,  Average Daily Traffic: 1,372 (year 2020),  Truck Traffic: 2%,  Features Intersected: HIGHBROOK AVENUE,  Facility Carried by Structure: MNRR NH LINE
Minimum Vertical Clearance: 3.47m (11.38ft),  Kilometerpoint: 0.209,  Lanes under structure: 2,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 771287,  Location: 0.5 MI N OF PELHAM (Lat: 40.913867,  Lng: -73.804639),  Route carried "under" structure: Other road ,  Year Built: 1910,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2021),  Features Intersected: HIGHBROOK ROAD,  Facility Carried by Structure: ABANDONED RR
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.3m (69.9ft)