Bridge Statistics for Park City, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 56ft / 16.7mTotal length
  • $1,736,000Total costs
  • 38,065Total average daily traffic
  • 2,787Total average daily truck traffic
  • 68,064Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Park City
  • No street view available for this location

New bridges in Park City, TN - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21930-1939
  • 31940-1949
  • 21950-1959
  • 31960-1969
  • 11970-1979
  • 11980-1989
Reconstructed bridges in Park City, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 21960-1969
  • 11970-1979
Average Bridge Daily Traffic in Park City, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 80.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Very good
  • 40.0%Good
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 53.8%Good
  • 38.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 62.5%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Find on map >>   Show street view

Structure Number: 52019710001,  Location: 5.5 M. SE. FAYETTEVILLE. (Lat: 35.081183,  Lng: -86.524033),  Route carried "on" structure: County highway 1971,  Year Built: 1935,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,626 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,136 (year 2039),  Design Load: H 15,  Features Intersected: STEWART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.157,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $136,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52019710003,  Location: 5.2 M. SE. FAYETTEVILLE. (Lat: 35.084200,  Lng: -86.525733),  Route carried "on" structure: County highway 1971,  Year Built: 1935,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,626 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,136 (year 2039),  Design Load: HS 20,  Features Intersected: BUGGER HOLLOW BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $106,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $160,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A2840001,  Location: 6 M. W. FLINTVILLE. (Lat: 35.050400,  Lng: -86.529650),  Route carried "on" structure: County highway 284,  Year Built: 1950,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2039),  Design Load: HS 20,  Features Intersected: HARBIN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 520A2940001,  Location: 5 M. SE. FAYETTEVILLE (Lat: 35.087967,  Lng: -86.525700),  Route carried "on" structure: County highway 294,  Year Built: 1960,  Status: Closed,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2041),  Features Intersected: STEWART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.470,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.4m (14.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $108,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $163,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A3180001,  Location: 6 M. S. FAYETTEVILLE. (Lat: 35.062767,  Lng: -86.573633),  Route carried "on" structure: County highway 318,  Year Built: 1955,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,780 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,448 (year 2039),  Design Load: HS 20,  Features Intersected: WALKER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.970,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $91,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $137,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A3180003,  Location: 6 M. S. FAYETTEVILLE. (Lat: 35.064350,  Lng: -86.588217),  Route carried "on" structure: County highway 318,  Year Built: 1940,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,750 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,800 (year 2039),  Design Load: HS 20,  Features Intersected: HARPER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.337,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $75,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $113,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A3700001,  Location: 9 M. S. FAYETTEVILLE. (Lat: 35.028900,  Lng: -86.601850),  Route carried "on" structure: County highway 370,  Year Built: 1917,  Year Reconstructed: 1950,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 240 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 384 (year 2039),  Design Load: H 10,  Features Intersected: WALKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.266,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $158,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $238,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A3810003,  Location: 8 M. S. FAYETTEVILLE (Lat: 35.041650,  Lng: -86.607817),  Route carried "on" structure: County highway 381,  Year Built: 1985,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 160 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 256 (year 2040),  Design Load: HS 20,  Features Intersected: WASHBURN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.407,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.96m (9.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $206,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 520A3830001,  Location: 7 M. S. FAYETTEVILLE (Lat: 35.062100,  Lng: -86.608550),  Route carried "on" structure: County highway 383,  Year Built: 1965,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2039),  Design Load: HS 20,  Features Intersected: WASHBURN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.823,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 520A4160001,  Location: 4 M. NE. TAFT. (Lat: 35.051967,  Lng: -86.663467),  Route carried "on" structure: County highway 416,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 96 (year 2039),  Design Load: HS 15,  Features Intersected: FLYNN BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.768,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52F00450003,  Location: 6.5 M. E. TAFT. (Lat: 35.033617,  Lng: -86.601150),  Route carried "on" structure: County highway 1029,  Year Built: 1977,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,139 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,320 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.975,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 35.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $99,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $149,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 52SR0100003,  Location: 5 M N OF ALABAMA STATE LN (Lat: 35.064297,  Lng: -86.572681),  Route carried "on" structure: US 231,  Year Built: 1947,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 11,705 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 23,040 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.288,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $434,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 52SR0100005,  Location: .1 M S OF WELLS HILL RD (Lat: 35.108139,  Lng: -86.566278),  Route carried "on" structure: US 231,  Year Built: 1947,  Year Reconstructed: 1977,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 16,679 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 27,968 (year 2039),  Design Load: HS 20,  Features Intersected: WELLS CREEK,  Facility Carried by Structure: FAP 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.229,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up