Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Oakland, Maryland (MD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 102ft / 31.2mTotal length
  • $2,493,000Total costs
  • 31,952Total average daily traffic
  • 1,438Total average daily truck traffic
  • 44,920Total future (year 2026) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Oakland
  • No street view available for this location

New bridges in Oakland, MD - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11950-1959
  • 41960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Oakland, MD - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Oakland, MD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 30.8%Good
  • 46.2%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 28.6%Good
  • 35.7%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 35.7%Good
  • 35.7%Satisfactory
  • 21.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.7%Very good
  • 30.8%Good
  • 53.8%Satisfactory
  • 7.7%Poor
Find on map >>   Show street view

Structure Number: 10000011000301,  Location: 0.19 MILE WEST OF US 219 (Lat: 39.408142,  Lng: -79.410497),  Route carried "on" structure: State highway 39,  Year Built: 1921,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 5,572 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,046 (year 2026),  Features Intersected: LITTLE YOUGHIOGHENY RIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.702,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $88,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $97,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10000011000401,  Location: 0.05 MILE WEST OF US 219 (Lat: 39.407272,  Lng: -79.408278),  Route carried "on" structure: State highway 39,  Year Built: 1994,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 5,671 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,046 (year 2026),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANSPORTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.928,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 34.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $193,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10000011005701,  Location: 0.025 M N OF E GREEN ST (Lat: 39.409206,  Lng: -79.406325),  Route carried "on" structure: US 219,  Year Built: 1925,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10,524 (year 2009),  Average Future Daily Traffic: 18,093 (year 2026),  Features Intersected: WILSON RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.705,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-000901,  Location: 0.74 MI W OF US RTE 219 (Lat: 39.352992,  Lng: -79.445817),  Route carried "on" structure: County highway 96,  Year Built: 1986,  Status: Posted for load,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 97 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2041),  Design Load: H 20,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: MANSFIELD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.191,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000G-001001,  Location: 0.5 M NW INT UNDERWOOD RD (Lat: 39.364222,  Lng: -79.462278),  Route carried "on" structure: County highway 91,  Year Built: 1965,  Status: Open,  Structure Length: 1.08m (3.54ft),  Average Daily Traffic: 1,138 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,390 (year 2041),  Features Intersected: YOUGHIOGHENY RIVER,  Facility Carried by Structure: UNDERWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.995,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 69.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $47,000,  Roadway Improvement Cost: $2,000,  Total Project Cost: $49,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-001201,  Location: 0.5 MI N OF MANSFIELD RD (Lat: 39.368639,  Lng: -79.454111),  Route carried "on" structure: County highway 91,  Year Built: 1998,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,185 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,450 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: CHERRY CREEK,  Facility Carried by Structure: UNDERWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-001401,  Location: 1.05 MI. SW. OF HUTTON RD (Lat: 39.389250,  Lng: -79.468889),  Route carried "on" structure: County highway 368,  Year Built: 1957,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 2.45m (8.04ft),  Average Daily Traffic: 209 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 260 (year 2041),  Design Load: H 20,  Features Intersected: SNOWY CREEK,  Facility Carried by Structure: SNOWY CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 3 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000,  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 200000G-001501,  Location: 0.2 MI WEST OF CRELLIN ST (Lat: 39.386528,  Lng: -79.470833),  Route carried "on" structure: County highway 93,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Posted for load,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 45 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SNOWY CREEK,  Facility Carried by Structure: CRELLIN MINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200000G-001601,  Location: 0.2MI S OF FINGERBOARD RD (Lat: 39.423833,  Lng: -79.421250),  Route carried "on" structure: County highway 363,  Year Built: 1960,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 1,782 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,175 (year 2041),  Features Intersected: YOUGHIOGHENY RIVER,  Facility Carried by Structure: HERRINGTON MANOR R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $84,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $126,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 200000G-002001,  Location: 0.1 M E INT MAPLE GLADE (Lat: 39.494175,  Lng: -79.417331),  Route carried "on" structure: County highway 40658,  Year Built: 2011,  Status: Open,  Structure Length: 4.67m (15.32ft),  Average Daily Traffic: 488 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 595 (year 2041),  Design Load: HS 20,  Features Intersected: YOUGHIOGHENY RIVER,  Facility Carried by Structure: SWALLOW FALLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.349,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 3.8m (12.5ft),  Out-to-Out Width: 3.8m (12.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $1,550,000,  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-005401,  Location: 0.14 MI NORTH OF MD 39 (Lat: 39.412278,  Lng: -79.416278),  Route carried "on" structure: County highway 76,  Year Built: 2004,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,070 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,305 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: LITTLE YOUGHIOGHENY RIVE,  Facility Carried by Structure: OAKLAND-ROSEDALE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $105,000,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-012503,  Location: 1.3MI S OF SWALLOW FALLS (Lat: 39.463833,  Lng: -79.444117),  Route carried "on" structure: County highway 363,  Year Built: 1970,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 1,069 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,305 (year 2041),  Features Intersected: HERRINGTON CREEK,  Facility Carried by Structure: HERRINGTON MANOR R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 200000G-O-0101,  Location: 0.12 MI S OF OAK STREET (Lat: 39.405444,  Lng: -79.408722),  Route carried "on" structure: City street 420,  Year Built: 1968,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 1,310 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,600 (year 2041),  Features Intersected: LITTLE YOUGHIOGHENY RIVE,  Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $43,000,  Total Project Cost: $43,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200000G-O-0201,  Location: 0.1 MI S. OF RTE 219 (Lat: 39.406542,  Lng: -79.407817),  Route carried "on" structure: City street 421,  Year Built: 2009,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,302 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,590 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: THIRD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200000G-O-0301,  Location: 0.05 MI. EAST MD RT. 219 (Lat: 39.421564,  Lng: -79.396619),  Route carried "on" structure: City street ,  Year Built: 2016,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 500 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 900 (year 2037),  Features Intersected: CHERRY GLADE RUN,  Facility Carried by Structure: BRIAN F THOMAS DRI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Maintenance Responsibility: City or Municipal Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Discuss Oakland, Maryland (MD) on our hugely popular Maryland forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.