Bridge Statistics for Northfield, Vermont (VT)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 161ft / 48.8mTotal length
  • $8,908,000Total costs
  • 32,065Total average daily traffic
  • 1,503Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Northfield
  • No street view available for this location

New bridges in Northfield, VT - historical statistics
  • New bridges - historical statistics
  • 4Before 1900
  • 11900-1909
  • 71910-1919
  • 41920-1929
  • 31930-1939
  • 11940-1949
  • 11960-1969
  • 41970-1979
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Northfield, VT - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 51960-1969
  • 11970-1979
  • 21980-1989
  • 31990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Northfield, VT
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.9%Very good
  • 29.6%Good
  • 29.6%Satisfactory
  • 14.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 11.1%Good
  • 37.0%Satisfactory
  • 22.2%Fair
  • 7.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.8%Very good
  • 55.6%Good
  • 14.8%Satisfactory
  • 14.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 63.0%Very good
  • 25.9%Good
  • 11.1%Satisfactory
Find on map >>   Show street view

Structure Number: 101213000912131,  Location: 0.05 MI TO JCT W C3 TH88 (Lat: 44.175861,  Lng: -72.661106),  Route carried "on" structure: Other road C2003,  Year Built: 1919,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 788 (year 2029),  Design Load: H 20,  Features Intersected: COX BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101213001012131,  Location: 0.4 MI TO JCT W VT12 (Lat: 44.173711,  Lng: -72.655583),  Route carried "on" structure: Other road C2003,  Year Built: 1900,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,260 (year 2029),  Design Load: H 15,  Features Intersected: COX BROOK
Minimum Vertical Clearance: 3.60m (11.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 15.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 9.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $510,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213001112131,  Location: 0.03 MI TO JCT W VT12 (Lat: 44.172753,  Lng: -72.653003),  Route carried "on" structure: Other road C2003,  Year Built: 1872,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,260 (year 2029),  Design Load: H 15,  Features Intersected: COX BROOK
Minimum Vertical Clearance: 3.88m (12.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $361,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213001512131,  Location: 0.02 MI TO JCT W VT12 (Lat: 44.172444,  Lng: -72.651508),  Route carried "on" structure: Other road C2003,  Year Built: 1872,  Year Reconstructed: 1969,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,575 (year 2029),  Design Load: H 20,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 3.70m (12.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.24m (13.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $814,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213004512131,  Location: 0.15 MI TO JCT W CL3 TH8 (Lat: 44.163558,  Lng: -72.682219),  Route carried "on" structure: Other road C3025,  Year Built: 1949,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 210 (year 2029),  Design Load: H 15,  Features Intersected: UNION BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $256,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $306,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101213004612131,  Location: 0.13 MI TO JCT W CL3 TH8 (Lat: 44.157758,  Lng: -72.676531),  Route carried "on" structure: Other road C3029,  Year Built: 2003,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 74 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: UNION BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 101213004712131,  Location: @ JCT W VT12A (Lat: 44.117072,  Lng: -72.675247),  Route carried "on" structure: Other road C3008,  Year Built: 1933,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 420 (year 2029),  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $418,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101213005212131,  Location: 0.12 MI TO JCT W CL3 TH8 (Lat: 44.161094,  Lng: -72.680306),  Route carried "on" structure: Other road C3028,  Year Built: 1919,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2029),  Features Intersected: UNION BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $210,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $260,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213005312131,  Location: 0.5 MI TO JCT W VT12A (Lat: 44.109261,  Lng: -72.676083),  Route carried "on" structure: Other road C3073,  Year Built: 1960,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 263 (year 2029),  Features Intersected: BULL RUN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $162,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $212,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213005412131,  Location: 0.05 MI TO JCT W CL2 TH3 (Lat: 44.178697,  Lng: -72.666786),  Route carried "on" structure: Other road C3012,  Year Built: 2003,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 11 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: COX BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $192,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101213005512131,  Location: 0.1 MI TO JCT W VT12A (Lat: 44.115928,  Lng: -72.722092),  Route carried "on" structure: Other road C3068,  Year Built: 1919,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 11.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $449,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213005612131,  Location: @ JCT W VT12 (Lat: 44.116439,  Lng: -72.654939),  Route carried "on" structure: Other road C3054,  Year Built: 1919,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: SUNNY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $274,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213005912131,  Location: @ JCT W CL3 TH8 (Lat: 44.131644,  Lng: -72.701189),  Route carried "on" structure: Other road C3060,  Year Built: 1919,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $183,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $233,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 101213006012131,  Location: 0.05 MI TO JCT W VT12 (Lat: 44.119517,  Lng: -72.657767),  Route carried "on" structure: Other road C2005,  Year Built: 1919,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,050 (year 2029),  Design Load: H 20,  Features Intersected: SUNNY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $494,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101213006312131,  Location: 0.4 MI TO JCT W CL3 TH51 (Lat: 44.120331,  Lng: -72.689186),  Route carried "on" structure: Other road C3008,  Year Built: 1899,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 420 (year 2029),  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 3.93m (12.89ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Very good,  Operating Rating: 18.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $264,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213006412131,  Location: 0.07 MI TO JCT W VT12 (Lat: 44.168519,  Lng: -72.654622),  Route carried "on" structure: Other road C3014,  Year Built: 1872,  Status: Posted for load,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 35 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 37 (year 2029),  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 3.35m (10.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Wood or Timber,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $371,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $521,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 101213006712131,  Location: 0.02 MI TO JCT W VT12 (Lat: 44.114822,  Lng: -72.654156),  Route carried "on" structure: Other road C3093,  Year Built: 1919,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 11 (year 2029),  Features Intersected: SUNNY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 12.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $255,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $405,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 101213006812131,  Location: 0.01 MI TO JCT W VT12A (Lat: 44.122689,  Lng: -72.665531),  Route carried "on" structure: Other road C3096,  Year Built: 2015,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 250 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 263 (year 2025),  Design Load: HL 93,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101213008112131,  Location: 0.02 MI TO JCT W UNION S (Lat: 44.150781,  Lng: -72.662214),  Route carried "on" structure: Other road C30PL,  Year Built: 1970,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 158 (year 2029),  Features Intersected: UNION BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $298,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $348,000 ( Estimate for 2020),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: 101213008212131,  Location: 0.02 MI TO JCT W WALL ST (Lat: 44.149181,  Lng: -72.660800),  Route carried "on" structure: Other road C30WA,  Year Built: 1973,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 788 (year 2029),  Design Load: HS 25 or greater,  Features Intersected: UNION BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101213008312131,  Location: 0.01 MI TO JCT W WATER ST (Lat: 44.148767,  Lng: -72.660553),  Route carried "on" structure: Other road C3WAL,  Year Built: 1978,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 1,500 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,575 (year 2029),  Design Load: HS 20,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101213008412131,  Location: 0.1 MI TO JCT NO.MAIN ST (Lat: 44.151906,  Lng: -72.656700),  Route carried "on" structure: Other road C30VI,  Year Built: 1989,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 1,830 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,922 (year 2029),  Design Load: HS 20,  Features Intersected: NEW ENGLAND CENTRAL RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200187003012132,  Location: 4.1 MI S JCT. VT.12 N (Lat: 44.117558,  Lng: -72.718822),  Route carried "on" structure: Alternate State highway 12A,  Year Built: 1993,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,365 (year 2028),  Design Load: HS 25 or greater,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200187003212132,  Location: 2.4 MI S JCT. VT.12 N (Lat: 44.111953,  Lng: -72.686144),  Route carried "on" structure: Alternate State highway 12A,  Year Built: 1929,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,400 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,470 (year 2028),  Design Load: H 15,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $288,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $338,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200187003512132,  Location: 1.4 MI S JCT. VT.12 N (Lat: 44.117350,  Lng: -72.672514),  Route carried "on" structure: Alternate State highway 12A,  Year Built: 1929,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 2,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,835 (year 2028),  Design Load: H 15,  Features Intersected: BULL RUN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $280,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $330,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200187003612132,  Location: 0.8 MI S JCT. VT.12 N (Lat: 44.123208,  Lng: -72.664708),  Route carried "on" structure: Alternate State highway 12A,  Year Built: 1931,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,800 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,890 (year 2028),  Design Load: H 15,  Features Intersected: SUNNY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200241006012132,  Location: 1.1 MI N JCT. VT.12A S (Lat: 44.149525,  Lng: -72.655908),  Route carried "on" structure: State highway 12,  Year Built: 1926,  Year Reconstructed: 1958,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 4,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,410 (year 2028),  Design Load: H 15,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,129,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $2,179,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 200241006112132,  Location: 1.9 MI N JCT. VT.12A S (Lat: 44.161208,  Lng: -72.656572),  Route carried "on" structure: State highway 12,  Year Built: 1977,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 4,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,410 (year 2028),  Design Load: HS 20,  Features Intersected: DOG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 200187002912132,  Location: 4.2 MI S JCT. VT.12 N (Lat: 44.117131,  Lng: -72.719108),  Route carried "under" structure: Alternate State highway 12A,  Year Built: 1928,  Structure Length: 0. m,  Average Daily Traffic: 1,600 (year 1999),  Truck Traffic: 6%,  Features Intersected: N.E.C.R.R. OVER VT 12A,  Facility Carried by Structure: RAILROAD
Kilometerpoint: 0.000,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 200187003412132,  Location: 1.5 MI S JCT. VT.12 N (Lat: 44.117686,  Lng: -72.673181),  Route carried "under" structure: Alternate State highway 12A,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 1998),  Truck Traffic: 6%,  Features Intersected: N.E.C.R.R. OVER VT 12A,  Facility Carried by Structure: RAILROAD
Kilometerpoint: 0.000,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Northfield, Vermont (VT) on our hugely popular Vermont forum.