Bridge Statistics for North Valley Stream, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 59ft / 18.3mTotal length
  • $35,625,000Total costs
  • 1,487,150Total average daily traffic
  • 7,790Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Valley Stream
  • No street view available for this location

New bridges in North Valley Stream, NY - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 61930-1939
  • 81950-1959
Average Bridge Daily Traffic in North Valley Stream, NY
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 50.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
Find on map >>   Show street view

Structure Number: 105932,  Location: .2 MI E NYC L -SSP (Lat: 40.687994,  Lng: -73.722922),  Route carried "on" structure: Other road ,  Year Built: 1934,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 20,549 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,962 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: ELMONT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.71m (8.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,239,000,  Roadway Improvement Cost: $1,311,000,  Total Project Cost: $3,550,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1059331,  Location: .6 MI E NYC LINE & SSP (Lat: 40.686872,  Lng: -73.715458),  Route carried "on" structure: State highway 908M,  Year Built: 1956,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 85,940 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 102,225 (year 2040),  Design Load: HS 20,  Features Intersected: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 18.1m (59.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 85.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,913,000,  Roadway Improvement Cost: $1,706,000,  Total Project Cost: $4,618,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1059332,  Location: .6 MI E NYC LINE & SSP (Lat: 40.686678,  Lng: -73.715303),  Route carried "on" structure: State highway 908M,  Year Built: 1934,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 85,940 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 102,225 (year 2040),  Design Load: H 20,  Features Intersected: CENTRAL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 15.3m (50.2ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,395,000,  Roadway Improvement Cost: $1,402,000,  Total Project Cost: $3,797,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105935,  Location: 1.5 MI E NYC LINE ON SSP (Lat: 40.679031,  Lng: -73.700192),  Route carried "on" structure: Other road ,  Year Built: 1934,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 12,086 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,954 (year 2040),  Features Intersected: RTE 908M,  Facility Carried by Structure: FLETCHER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.5m (60.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,858,000,  Roadway Improvement Cost: $1,673,000,  Total Project Cost: $4,531,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105936,  Location: 2.1 MI E NYC LINE & SSP (Lat: 40.682956,  Lng: -73.688486),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 20,602 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,027 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: CORONA AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.188,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 89.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,218,000,  Roadway Improvement Cost: $1,885,000,  Total Project Cost: $5,103,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 152016,  Location: .2 MI E NYC L -SSP (Lat: 40.688250,  Lng: -73.722756),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 20,549 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 24,962 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: ELMONT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 89.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,023,000,  Roadway Improvement Cost: $1,770,000,  Total Project Cost: $4,792,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 152017,  Location: 1.5 MI E NYC LINE ON SSP (Lat: 40.679272,  Lng: -73.700233),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 12,086 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,954 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: NORTH FLETCHER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,370,000,  Roadway Improvement Cost: $1,974,000,  Total Project Cost: $5,344,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 152018,  Location: 2.1 NI E NYC LINE & SSP (Lat: 40.683258,  Lng: -73.688356),  Route carried "on" structure: County highway ,  Year Built: 1929,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 20,602 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,027 (year 2040),  Features Intersected: RTE 908M,  Facility Carried by Structure: CORONA AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,454,000,  Roadway Improvement Cost: $1,437,000,  Total Project Cost: $3,890,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105932,  Location: .2 MI E NYC L -SSP (Lat: 40.687994,  Lng: -73.722922),  Route carried "under" structure: State highway 908M,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 176,004 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: ELMONT ROAD
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 1059331,  Location: .6 MI E NYC LINE & SSP (Lat: 40.686872,  Lng: -73.715458),  Route carried "under" structure: County highway ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 19,866 (year 2001),  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: RTE 908M
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 1059332,  Location: .6 MI E NYC LINE & SSP (Lat: 40.686678,  Lng: -73.715303),  Route carried "under" structure: County highway ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 19,866 (year 2001),  Features Intersected: CENTRAL AVENUE,  Facility Carried by Structure: RTE 908M
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 105935,  Location: 1.5 MI E NYC LINE ON SSP (Lat: 40.679031,  Lng: -73.700192),  Route carried "under" structure: State highway 908M,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 198,907 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: FLETCHER AVENUE
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 105936,  Location: 2.1 MI E NYC LINE & SSP (Lat: 40.682956,  Lng: -73.688486),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 209,621 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: CORONA AVENUE
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 3.685,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 152016,  Location: .2 MI E NYC L -SSP (Lat: 40.688250,  Lng: -73.722756),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 176,004 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: ELMONT ROAD
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 152017,  Location: 1.5 MI E NYC LINE ON SSP (Lat: 40.679272,  Lng: -73.700233),  Route carried "under" structure: State highway 908M,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 198,907 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: NORTH FLETCHER AVE
Minimum Vertical Clearance: 4.04m (13.25ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 152018,  Location: 2.1 NI E NYC LINE & SSP (Lat: 40.683258,  Lng: -73.688356),  Route carried "under" structure: State highway 908M,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 209,621 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: CORONA AVE
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 3.685,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 22.3m (73.2ft)