Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Nicholson, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 161ft / 48.7mTotal length
  • $2,611,000Total costs
  • 22,755Total average daily traffic
  • 4,093Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Nicholson
  • No street view available for this location

New bridges in Nicholson, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 41940-1949
  • 31950-1959
  • 41960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Nicholson, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 42010-2019
  • 12020-2022
Average Bridge Daily Traffic in Nicholson, PA
Average Bridge Truck Traffic in Nicholson, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.7%Very good
  • 33.3%Good
  • 6.7%Satisfactory
  • 13.3%Fair
  • 13.3%Poor
  • 6.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Very good
  • 12.5%Good
  • 18.8%Satisfactory
  • 12.5%Poor
  • 12.5%Serious
  • 6.3%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 31.3%Good
  • 43.8%Satisfactory
  • 12.5%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 7.1%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 35.7%Poor
Find on map >>   Show street view

Structure Number: 32325,  Location: LENOX TWP 198' E TR 92 (Lat: 41.647786,  Lng: -75.717808),  Route carried "on" structure: State highway 374,  Year Built: 1957,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,514 (year 2021),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,788 (year 2032),  Design Load: HL 93,  Features Intersected: N BR TUNKHANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $288,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3248,  Location: LATHROP TWP .6M N SR 3023 (Lat: 41.665492,  Lng: -75.796853),  Route carried "on" structure: State highway ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 285 (year 2022),  Truck Traffic: 14%,  Average Future Daily Traffic: 354 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB HORTON CREEK,  Facility Carried by Structure: SR 2009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32613,  Location: LATHROP TWP JCT SR 2007 (Lat: 41.650322,  Lng: -75.796689),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 674 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,246 (year 2032),  Design Load: HS 20,  Features Intersected: HORTONS CREEK,  Facility Carried by Structure: SR 3023
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.020,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $226,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37089,  Location: NICHOLSON BO .2 M S TR 92 (Lat: 41.622133,  Lng: -75.778036),  Route carried "on" structure: US 11,  Year Built: 1990,  Status: Open,  Structure Length: 14.84m (48.69ft),  Average Daily Traffic: 2,345 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,643 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TUNKHANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.384,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.70m (51.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3709,  Location: NICHOLSON BORO OVER TR 92 (Lat: 41.625447,  Lng: -75.778444),  Route carried "on" structure: US 11,  Year Built: 1948,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,345 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,643 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0092 TR 92
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.810,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $24,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $327,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 37152,  Location: NICHOLSON TP .1M S SR1015 (Lat: 41.616431,  Lng: -75.809042),  Route carried "on" structure: State highway 92,  Year Built: 1927,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,727 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,206 (year 2032),  Design Load: H 20,  Features Intersected: FIELD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.813,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $218,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37153,  Location: NICHOLSON BO 200'N SR1017 (Lat: 41.618811,  Lng: -75.794503),  Route carried "on" structure: State highway 92,  Year Built: 1969,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 2,739 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,186 (year 2032),  Design Load: HS 20,  Features Intersected: HORTON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.211,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Poor,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $167,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 37154,  Location: NICHOLSON 300' S SR 1019 (Lat: 41.625036,  Lng: -75.781694),  Route carried "on" structure: State highway 92,  Year Built: 1960,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 2,739 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,186 (year 2032),  Design Load: HS 20,  Features Intersected: MARTIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.301,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 37157,  Location: NICHOLSON TP .1M N SR1027 (Lat: 41.632322,  Lng: -75.747692),  Route carried "on" structure: State highway 92,  Year Built: 1957,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,659 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 2,296 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB TO TUNKHANNOCK CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.899,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Bridge Improvement Cost: $11,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $151,000,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 37211,  Location: NICHOLSON TWP 1.3M N TR92 (Lat: 41.633167,  Lng: -75.813981),  Route carried "on" structure: State highway ,  Year Built: 1941,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 534 (year 2022),  Truck Traffic: 15%,  Average Future Daily Traffic: 636 (year 2032),  Design Load: H 20,  Features Intersected: FIELDBROOK CREEK,  Facility Carried by Structure: SR 1015
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.506,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Poor,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $487,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37216,  Location: NICHOLSON BO .3M W SR1019 (Lat: 41.630650,  Lng: -75.782314),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 1,397 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,751 (year 2036),  Design Load: HS 20,  Features Intersected: MARTIN CREEK,  Facility Carried by Structure: SR 1021
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $230,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 37217,  Location: NICHOLSON BORO .5M E TR11 (Lat: 41.631900,  Lng: -75.777297),  Route carried "on" structure: State highway ,  Year Built: 1914,  Status: Closed,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 463 (year 2022),  Truck Traffic: 16%,  Average Future Daily Traffic: 647 (year 2032),  Features Intersected: NFSRR,  Facility Carried by Structure: SR 1025
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.744,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Critical,  Substructure: Poor,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: October 2019,  Other Special Inspection Date: October 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $311,000
Find on map >>   Show street view

Structure Number: 37218,  Location: NICHOLSN TWP .5 M W TR 92 (Lat: 41.638411,  Lng: -75.745836),  Route carried "on" structure: State highway ,  Year Built: 1953,  Year Reconstructed: 2019,  Status: Closed,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 53 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 234 (year 2032),  Design Load: HS 20,  Features Intersected: WILLOW BROOK,  Facility Carried by Structure: SR 1027
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.853,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $206,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3722,  Location: NICHOLSON TWP .1M S TR 92 (Lat: 41.626794,  Lng: -75.768833),  Route carried "on" structure: State highway ,  Year Built: 1984,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 540 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 777 (year 2032),  Design Load: HS 20,  Features Intersected: TUNKHANNOCK CREEK,  Facility Carried by Structure: SR 1031
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.173,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.80m (19.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 40953,  Location: NICHOLSON BO 328' S TR 92 (Lat: 41.616494,  Lng: -75.795328),  Route carried "on" structure: State highway ,  Year Built: 2000,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 304 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 923 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: TUNKHANNOCK CREEK,  Facility Carried by Structure: SR 1017
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.022,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2019,  Underwater Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 52845,  Location: NICHOLSON TWP .2M S TR 92 (Lat: 41.604706,  Lng: -75.822850),  Route carried "on" structure: State highway ,  Year Built: 2015,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 341 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 999 (year 2032),  Design Load: HL 93,  Features Intersected: TUNKHANNOCK CREEK,  Facility Carried by Structure: SR 1029
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.677,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2019,  Underwater Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3709,  Location: NICHOLSON BORO OVER TR 92 (Lat: 41.625447,  Lng: -75.778444),  Route carried "under" structure: State highway 92,  Year Built: 1948,  Structure Length: 0. m,  Average Daily Traffic: 3,096 (year 2020),  Truck Traffic: 24%,  Features Intersected: SR 0092 TR 92,  Facility Carried by Structure: SR 0011 TR 11
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 36.064,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Discuss Nicholson, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.