  • 14Number of bridges
  • 131ft / 40.4mTotal length
  • $1,587,000Total costs
  • 79,497Total average daily traffic
  • 10,954Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newry
  • No street view available for this location

New bridges in Newry, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 111980-1989
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Newry, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 52000-2009
Average Bridge Daily Traffic in Newry, PA
Average Bridge Truck Traffic in Newry, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 77.8%Good
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 11.1%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 22.2%Very good
  • 22.2%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 5554,  Location: .25 MI.S.OF CATFISH (Lat: 40.391450,  Lng: -78.412497),  Route carried "on" structure: State highway 36,  Year Built: 1988,  Status: Open,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 6,269 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,293 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: POPLAR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.170,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5577,  Location: 1 MI.S.OF NEWRY (Lat: 40.380489,  Lng: -78.434172),  Route carried "on" structure: Interstate 99,  Year Built: 1987,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 10,207 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,271 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: SR 3013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.655,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 14 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5579,  Location: .25 MI.S.OF NEWRY (Lat: 40.390564,  Lng: -78.429153),  Route carried "on" structure: Interstate 99,  Year Built: 1987,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 7.92m (25.98ft),  Average Daily Traffic: 10,207 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,271 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: POPLAR RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.463,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5581,  Location: NEWRY BOROUGH (Lat: 40.394100,  Lng: -78.431072),  Route carried "on" structure: Interstate 99,  Year Built: 1987,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 10,207 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,271 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: T373 (CATFISH ROAD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.235,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5582,  Location: 1 MI.N.OF NEWRY (Lat: 40.407631,  Lng: -78.434253),  Route carried "on" structure: Interstate 99,  Year Built: 1984,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 10,325 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,358 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 2012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.846,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5583,  Location: 1 MI.N.OF NEWRY (Lat: 40.407625,  Lng: -78.434461),  Route carried "on" structure: Interstate 99,  Year Built: 1984,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 10,207 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,271 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 2012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.844,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5904,  Location: 1.5 MI.EAST OF NEWRY (Lat: 40.395419,  Lng: -78.407881),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 1955,  Status: Posted for load,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 1,469 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,836 (year 2041),  Design Load: HS 20,  Features Intersected: FRTOWN.BR.JUNIATA RIVER,  Facility Carried by Structure: T375, Monastery RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $118,000,  Roadway Improvement Cost: $346,000,  Total Project Cost: $1,587,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 44154,  Location: 1 MILE WEST OF NEWRY (Lat: 40.389694,  Lng: -78.457125),  Route carried "on" structure: State highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,234 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,650 (year 2032),  Design Load: HL 93,  Features Intersected: POPLAR RUN,  Facility Carried by Structure: SR 3003
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.682,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 55782,  Location: NEWRY BORO LINE (Lat: 40.389972,  Lng: -78.435389),  Route carried "on" structure: US 220B,  Year Built: 2018,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 8,565 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 10,000 (year 2037),  Design Load: HL 93,  Features Intersected: POPLAR RUN,  Facility Carried by Structure: SR 3013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.359,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5577,  Location: 1 MI.S.OF NEWRY (Lat: 40.380489,  Lng: -78.434172),  Route carried "under" structure: US 220B,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,565 (year 2020),  Truck Traffic: 17%,  Features Intersected: SR 3013,  Facility Carried by Structure: I-99 / US 220 SBL
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 13.266,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 558,  Location: NEWRY BOROUGH (Lat: 40.394086,  Lng: -78.430822),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 25 (year 1993),  Features Intersected: T373 (CATFISH ROAD),  Facility Carried by Structure: I-99 / US 220 NBL
Minimum Vertical Clearance: 6.38m (20.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 5581,  Location: NEWRY BOROUGH (Lat: 40.394100,  Lng: -78.431072),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 25 (year 1993),  Features Intersected: T373 (CATFISH ROAD),  Facility Carried by Structure: I-99 / US 220 SBL
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 5582,  Location: 1 MI.N.OF NEWRY (Lat: 40.407631,  Lng: -78.434253),  Route carried "under" structure: State highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 1,096 (year 2020),  Truck Traffic: 1%,  Features Intersected: SR 2012,  Facility Carried by Structure: I-99 / US 220 NBL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 5583,  Location: 1 MI.N.OF NEWRY (Lat: 40.407625,  Lng: -78.434461),  Route carried "under" structure: State highway ,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 1,096 (year 2020),  Truck Traffic: 1%,  Features Intersected: SR 2012,  Facility Carried by Structure: I-99 / US 220 SBL
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.4m (66.9ft)