Bridge Statistics for Newbury, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 226ft / 68.5mTotal length
  • $47,408,000Total costs
  • 369,308Total average daily traffic
  • 28,390Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Newbury
  • No street view available for this location

New bridges in Newbury, MA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41950-1959
  • 51970-1979
  • 31990-1999
  • 52000-2009
Reconstructed bridges in Newbury, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 21970-1979
Average Bridge Daily Traffic in Newbury, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 56.3%Good
  • 31.3%Satisfactory
  • 12.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.3%Very good
  • 18.8%Good
  • 50.0%Satisfactory
  • 18.8%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 31.3%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 58.3%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: N100012RGMUNNBI,  Location: 0.5 MI W OF US-1 (Lat: 42.758911,  Lng: -70.901000),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 1,550 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,211 (year 2032),  Design Load: HS 20,  Features Intersected: WATER PARKER RIVER,  Facility Carried by Structure: HWY MIDDLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,211,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,317,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N10003AF8MUNNBI,  Location: .62 K SOUTH OF NEWBURYPO (Lat: 42.790292,  Lng: -70.876578),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 2,974 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 10,423 (year 2032),  Design Load: HS 20,  Features Intersected: WATER LITTLE RIVER,  Facility Carried by Structure: HWY HANOVER ST
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 63.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $827,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,241,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N100042TBDOTNBI,  Location: .2 MI S OF MBTA (Lat: 42.792028,  Lng: -70.877728),  Route carried "on" structure: State highway 1,  Year Built: 1922,  Year Reconstructed: 1935,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 44,612 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 16,267 (year 2032),  Design Load: H 20,  Features Intersected: WATER LITTLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.238,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $199,000,  Total Project Cost: $2,971,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N100059GQMUNNBI,  Location: 1 MI. SW OF RT. 1A (Lat: 42.774483,  Lng: -70.865181),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 400 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 948 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER LITTLE RIVER,  Facility Carried by Structure: HWY HAY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.8m (22.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $848,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $1,273,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N10006AU8MUNNBI,  Location: 1.2MI E OF RT.1 (Lat: 42.771975,  Lng: -70.862083),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 2.72m (8.92ft),  Average Daily Traffic: 400 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,421 (year 2032),  Design Load: HS 20,  Features Intersected: WATER LITTLE RIVER,  Facility Carried by Structure: HWY NEWMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.6m (44.6ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $1,109,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: N10008AGTMUNNBI,  Location: 0.48 KM E OF I 95 (Lat: 42.749036,  Lng: -70.939900),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 300 (year 2016),  Average Future Daily Traffic: 790 (year 2031),  Design Load: HS 20,  Features Intersected: WATER PARKER RIVER,  Facility Carried by Structure: HWY LARKIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.7m (51.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $722,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,084,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N100092TADOTNBI,  Location: 2.6 MI S MBTA (Lat: 42.759692,  Lng: -70.891658),  Route carried "on" structure: US 1,  Year Built: 1972,  Status: Open,  Structure Length: 5.34m (17.52ft),  Average Daily Traffic: 9,550 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,740 (year 2031),  Design Load: HS 20,  Features Intersected: WATER PARKER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.287,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $3,225,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $4,838,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100108PDDOTNBI,  Location: Plum Island (Lat: 42.798167,  Lng: -70.848000),  Route carried "on" structure: Federal lands road ,  Year Built: 2007,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 120 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 175 (year 2041),  Design Load: HL 93,  Features Intersected: Unnamed drainage,  Facility Carried by Structure: Unnamed roadway
Minimum Vertical Clearance: 30.48m (100.00ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Bureau of Fish and Wildlife,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 6.0m (19.7ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N100108PDDOTNBI,  Location: 2.8 MI S NEWBURY TOWN HAL (Lat: 42.762456,  Lng: -70.847714),  Route carried "on" structure: City street ,  Year Built: 2008,  Status: Open,  Structure Length: 11.14m (36.55ft),  Average Daily Traffic: 5,172 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 12,476 (year 2032),  Design Load: HS 20,  Features Intersected: WATER PARKER RIVER,  Facility Carried by Structure: ST 1 A/HIGH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.185,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 3.9m (12.8ft), Horizontal Clearance: 35.0m (114.8ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.1m (118.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2021,  Underwater Inspection Date: March 2019,  Bridge Improvement Cost: $1,435,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,153,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N100112Y6DOTNBI,  Location: .75 MI WEST ATLANTIC OCN (Lat: 42.797775,  Lng: -70.821439),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 12,500 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,687 (year 2031),  Design Load: H 20,  Features Intersected: WATER PLUM ISLAND RIVER,  Facility Carried by Structure: HWY PLM ISLN TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 4.0m (13.1ft), Horizontal Clearance: 12.2m (40.0ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 29.0m (95.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: December 2021,  Bridge Improvement Cost: $1,931,000,  Roadway Improvement Cost: $194,000,  Total Project Cost: $2,897,000 ( Estimate for 2022),  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: N10015AVUDOT634,  Location: 0.2 MI N OF LITTLE RIVER (Lat: 42.794506,  Lng: -70.876822),  Route carried "on" structure: State highway 1,  Year Built: 1998,  Status: Open,  Structure Length: 17.40m (57.09ft),  Average Daily Traffic: 11,600 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 16,425 (year 2032),  Design Load: HS 20,  Features Intersected: RR MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 117.331,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 36 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 38.5m (126.3ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 22.4m (73.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.50m (57.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,654,000,  Roadway Improvement Cost: $766,000,  Total Project Cost: $11,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N100202VJDOTNBI,  Location: .3 MI S CENTRAL STREET (Lat: 42.752031,  Lng: -70.944511),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 48,230 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 107,550 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER PARKER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 130.679,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.7m (64.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $1,161,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,742,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100202VKDOTNBI,  Location: .3 MI S CENTRAL STREET (Lat: 42.752314,  Lng: -70.944894),  Route carried "on" structure: Interstate 95,  Year Built: 1951,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 52,000 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 107,550 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER PARKER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 129.066,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.5m (67.3ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 63.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: November 2021,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $1,205,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,808,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100212Y2DOTNBI,  Location: QUARTER MILE N PARKER RIV (Lat: 42.756542,  Lng: -70.941833),  Route carried "on" structure: State highway ,  Year Built: 1976,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 6,700 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,685 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.571,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.9m (121.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,926,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $7,390,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100222VLDOTNBI,  Location: 2.1 MI N PARKER RIVER (Lat: 42.780208,  Lng: -70.926061),  Route carried "on" structure: Interstate 95,  Year Built: 1976,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 63,600 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 79,597 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY SCOTLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.203,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $811,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100222VMDOTNBI,  Location: 2.1 MI N PARKER RIVER (Lat: 42.780125,  Lng: -70.926583),  Route carried "on" structure: Interstate 95,  Year Built: 1952,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 63,600 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 795,967 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY SCOTLAND RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.203,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 83.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,824,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,737,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N100212Y2DOTNBI,  Location: .3 MI N PARKER RIVER (Lat: 42.750000,  Lng: -70.950000),  Route carried "under" structure: Interstate 95,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 129.650,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: N100212Y2DOTNBI,  Location: 000076 STATUTORY (Lat: 42.750000,  Lng: -70.950000),  Route carried "under" structure: Interstate 95,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY CENTRAL ST
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 129.650,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Discuss Newbury, Massachusetts (MA) on our hugely popular Massachusetts forum.